HSE MANAGEMENT SITE WALK REPORT

23 OCTOBER 2017
YAS SOUTH-IDR
HSE MANAGEMENT SITE
WALK REPORT
MIRAL

PROJECT NO.: 37450850


DATE: 23/10/2017

WSP
P.O. BOX 7497
DUBAI
UNITED ARAB EMIRATES

TEL.: +971 4 501 8301


FAX: +971 4 501 8319
WSP.COM
QUALITY MANAGEMENT

ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 REVISION 3

Management
Remarks
Site Walk 04

Date 23 October 2017

Prepared by Anish Thomas

Signature

Checked by Shakil
Panniyottil

Signature

Authorised by Lino Yohannan

Signature

Project number 37450850

Document HSEQ-F04
Reference

Report number 4

File reference YSD-P02-0208-


HS-WSP-RP-
00058
EXECUTIVE SUMMARY
A joint site Safety walk organised by WSP was conducted on 23rd October 1500 hrs with
Miral, Faithful Gould and HILALCO participate by Miral HSE associate Director Philip
James , F+G HSE Manager Bastine Paul, F+G HSE Advisor joseph Alserut, , WSP Senior
Engineer Faisal Youssef, WSP HSE Advisor Anish Thomas , Hilalco Project Manager Vasil
Mingovski, Hilalco Construction Manager Costas Kyriakides, Hilalco HSE Advisor
Srichakradhar, Hilalco HSE advisor Javed Shaikh and Hilalco Environmental Engineer
Rodolph .

The following items, in the inspection findings, were discussed in order to address and
identify the areas of concern and agree on improvements required to maintain the HSE
requirements for the site.

Overall, the report identifies an improvement of H&S standards on site, the contractor
needs to monitor and maintain the good practices and improve more by adopting
proactive approach and undertake a thorough review of current practices and deal with
the daily issues in a more robust and structured manner through the commitment and
engagement of Hilalco site supervision team.

The contractor safety team and supervision team must work together to maintain the
management processes to raise the standards on the project.

YAS SOUTH-IDR WSP


Project No. 37450850 October 2017
MIRAL Page 1
1 INSPECTION FINDINGS
Expected to
No Inspection Findings Risk Rating Details of action to be taken
close out Date
01 Exposed Rebars Immediate High Advised the contractor to
provide adequate exposed
rebar protection and hard
barriers to protect
operatives fall into the pile
cap.

Potential risk of personal


injury due to the absence of
adequate exposed rebar
protection and hard barriers
to prevent operatives fall into
the pile cap.
02 Access and Egress Immediate High Advised Hilalco to provide
appropriate ladder and
properly secure to avoid
from toppling.

Advised Hilalco to comply


with Cop Section 29.0
Excavation work.
Potential risk of personal
injury due to the use of
inappropriate Ladder to
access the Excavation.
03 Pedestrian Segregation 24 10 2017 High Advised the contractor to
provide safe pedestrian
access to reach the
operatives to work site.

Advised Hilalco to comply


with Cop Section 44.0
Traffic Management and
Logistic.
Potential risk of personal
injury or operatives struck by
machinery due to the
absence of safe pedestrian
access to the site internal
roads.

YAS SOUTH-IDR WSP


Project No. 37450850 October 2017
MIRAL Page 2
Expected to
No Inspection Findings Risk Rating Details of action to be taken
close out Date
04 Banks Man Immediate High Advised Hilalco to provide
adequate steps for the
ramp and robust hard
barriers and handrails.

Advised Hilalco to comply


with Cop Section
29.0Excavtion works.
Potential risk of personal
injury due to the absence of
proper steps or slops for the
unsafe access provided
through the steep ramp.
05 Pedestrian Access 26 10 2017 High Advised Hilalco to provide
safe pedestrian access to
reach the work site safely.
Advised Hilalco to comply
with cop Section 44.0

Potential risk of operatives


struck by vehicles due to the
EVA road pedestrian access
obstructed by materials.
06 Personal protective Immediate High Advised the contractor to
Equipment ensure that all operatives
are adhering the site
mandatory PPE.

Advised Hilalco to comply


with Cop Section 2.0
personal protective
Equipment.

Site operatives are not


adhering site mandatory PPE
of Goggles with potential risk
of Eye injury.

YAS SOUTH-IDR WSP


Project No. 37450850 October 2017
MIRAL Page 3