You are on page 1of 6

Arabian Industries Projects LLC

CONTRACT : PROJECT DELIVERY CONTRACT (PDC) - NORTH

CLIENT : PETROLEUM DEVELOPMENT OMAN L.L.C

PDO CONTRACT NO. : C3100000175

MAIN CONTRACTOR : ARABIAN INDUSTRIES PROJECTS LLC

AIP PROJECT : 14010024210003

TITLE:

Inspection and Test Plan - PLASTERING AND RENDERING


WORKS

Doc No: AIP-C3100000175-ITP-09 Rev.0

PDO Review Code:


Final: No Comment, document accepted. Do not re-submit
Code A
except modified.
Revise and Re-issue: Returned with comment, incorporate
Code B
comments and issue for approval. Work may proceed.
Minor Comment: Incorporate comments and proceed with
Code C
work.
Rejected: Incorporate comments and re-issue, work may
Code D
NOT proceed. New document may be required.

Shankar Tejas Tejas


01 04.08.2021 Issued for Review
Pushparaj Patel Patel
REVD APPD Approval
REV DATE PRPD BY DESCRIPTION TA Ref. Ind. SIGN
BY BY Code

AIP PDO

Area Facility Originator Doc Sequence


Discipline Sheet
Code Code Code Type No.

GEN 00 104265 QA 5733 00509 0000


ARABIAN INDUSTRIES PROJECTS LLC

Page 1 of 4
INSPECTION & TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No. : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil Works Date : 04.08.2021

Sr. No. List of Abbreviations & References List of Abbreviations

1 QA/QC - Quality Assurance / Quality Control Hold Point : A critical step in fabrication and testing where it is mandatory that the Company
inspect the component/equipment or witness an activity. Activities designated as a Hold Point shall
H -
2 QA/QCE - QA/QC Engineer not proceed unless the Company/Representative is present or the Hold Point is formally waived.
The Company shall be notified at duration specified in the contract in advance of the activity.
3 QCI - QC Inspector
4 AIP - Arabian Industries Projects LLC Witness Point : A critical step in fabrication and testing where it is desirable that the
5 PDO/Company - Petroleum Development Oman Company/Representative inspect the component/equipment or witness an activity. The Company
W - shall be notified at a duration specified in the contract in advance of the activity. Once proper
notification is given, the activity may proceed according to the schedule regardless of the
6 C.C.E - Civil construction Engineer

7 SP-1279 Ver 4.0 - Specification for Civil Construction Works (May 2019) Monitor Point : A critical step in fabrication and testing where it is optional that the Company
inspect the component/equipment or witness an activity. The Company shall be notified at a
M - duration specified in the contract in advance of the first occurrence of the activity at each worksite.
8 QCP - Quality Control Procedure No further notification for like activities at each worksite shall be required. The activity may proceed

Approval Point : A critical step in design, procurement, and or fabrication and testing where it is
mandatory that the Company approve a document/qualification/ equipment/or activity. The
A - Company shall be notified at a duration specified in the contract in advance of the first occurrence of
the activity or provided the document in a period of time specified by the contract. The activity may

Review Point : A critical step in design, procurement, and or fabrication and testing where it is
desirable that the Company review the document/qualification/ equipment/or activity. A separate
R - notification is not needed unless otherwise specifically requested; the Company may perform this
along with any of the other intervention types.
ARABIAN INDUSTRIES PROJECTS LLC

Page 2 of 4
INSPECTION & TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No. : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil Works Date : 04.08.2021

Revision Status:

AIP-C3100000175-ITP-09 Issued for Review and


04.08.2021 Shankar Pushparaj Tejas Patel Tejas Patel
Rev 0 approval

ITP Ref No. / Rev. No. Date Revision Detail Prepared By Reviewed By Approved By PDO Approval
(Sr.QAE) (QA Manager) (QA Manager)
Exb:AIP-C3100000175-CONM-30 Rev.0
ARABIAN INDUSTRIES PROJECTS LLC
Page 3 of 4
INSPECTION AND TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil works Date: 04.08.2021

CONTROLLING TYPE & EXTENT


STAGE ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA RESPONSIBILITY VERIFICATION DOCUMENT AIP PDO
DOCUMENT OF CHECK

1 Review and Approval of


Drawing SP-1279 100% Review SOW / PO DE AFC A R

2 Document Review and


Approval - ITP & QCP SP-1279 100% Review SOW / PO QAE Approved ITP, QCP H A (ITP)

3 Material Approval
a) Cement AFC Drawings 100% - Ordinary Portland Cement in accordance with BS EN 197
Material Approval Sheet
b) Sand SP-1279 Sec 11.5.1.1, Verification test - Natural sand or Sand Consequent by Crushed Gravel QCI H A
(AIP-C3100000175-CONC-01)
c) Lathing and other SP 1282 & SOW certificate Approved by company
accessories
4 Material Receipt inspection - All materials shall be approved by company before delivery to
a) Cement site. (Unless specified otherwise,OPC shall be used)
AFC Drawings - Offer Material inspection after recivied at site (MIRR)
SP-1282 Ver-6 Sec - Every consignment of cement shall accompany with
2.4.2, Sec 2.4.2.1, manufacturer's compliance certificate for adherence to BS and
Sec 2.4.2.2, specifications
Sec 2.4.2.3, - Vendor / source shall be approved by company AIP-C3100000175-CONC-01
Sec 2.4.2.4 100 % - Shelf life MIRR
CCE/QCI H W
'Visual Verification - Weatherproof shed & on wooden palletes 150mm above from Manufactures data sheet ,
ground, stacked to a height not greater than 1500mm Batch certificates
b) Sand SP-1282 Ver-6 Sec
-As per SP-1282 Sec 2.4.1.5, Table 1
2.4.1.5
c) Lathing and other
accessories SP-1279 Ver-4 Sec -AFC Drawings
11.5.1.2 - As per manufacturer recommendations

5 Before Commencement of - Surface Shall be cleaned and Wetted


work AFC Drawings - Hack or Scarify all Concrete Surfaces.
Plastering & Rendering -
SP-1279 Sec 11.5.1.2 Physical/Random - Secure all chases with a single layer of lathing, as above, to
CCE/QCI Inspection Report W M
BS-5385 and inspection extend 150 mm either side of chase (300 mm total width).
AIP-C3100000175-CONC-07
BS-EN-13658 - Rake out all Joints in block works to 15 mm below block face
to provide key.
ARABIAN INDUSTRIES PROJECTS LLC
Page 4 of 4
INSPECTION AND TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil works Date: 04.08.2021

CONTROLLING TYPE & EXTENT


STAGE ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA RESPONSIBILITY VERIFICATION DOCUMENT AIP PDO
DOCUMENT OF CHECK

6 Mortar Mixing and Application


- Preperation of mix for Rendering shall be in a batch mixer and
mixing ratio 1 part of Cement to 4 part of Sand.
AFC Drawings Physical/Random - Rough Coat Hand Throw a 2mm thickness of cement/Sand
CCE/QCI AIP-C3100000175-CONC-07 W M
SP-1279 Sec 11.5.1.2 inspection slurry ,consisting of one part OPC to three parts sand mixed
volume with water to a thin slurry,to provide a roughened
surface.

7 Wall Finishing - Preperation of mix for Rendering shall be 1 part of Cement to


A) Internal Rendering AFC Drawings Physical/Random 4 part of Sand CCE/QCI AIP-C3100000175-CONC-07 W M
SP-1279 Sec 11.5.1.2 inspection - Rendering on walls shall be 15 mm thick
B) External Rendering - Preperation of mix for Rendering shall be 1 part of Cement to
AFC Drawings Physical/Random 4 part of Sand CCE/QCI AIP-C3100000175-CONC-07 W M
SP-1279 Sec 11.5.2 inspection - External Rendering shall comply with BS EN 13914-1
C) Internal Gypsum Plastering
- AFC Drawings
AFC Drawings Physical/Random
- Shall be executed according to BS 13914 - 2. CCE/QCI AIP-C3100000175-CONC-07 W M
SP-1279 Sec 11.5.3 inspection
- Gypsum Plaster Complying with BS EN 13279

8 Ceiling Finishing
- AFC Drawings
AFC Drawings Physical/Random - Preperation of mix for Rendering shall be 1 part of
CCE/QCI AIP-C3100000175-CONC-07 W M
SP-1279 Sec 11.6 inspection Cement to 4 part of Sand
- Thickness of Render shall be 6 mm
9 Tiled area Finishing
AFC-Drawings Physical/Random - Rendering to receive tiles shall be crosshatched or
CCE/QCI AIP-C3100000175-CONC-07 M M
SP-1279 Sec 11.5.1.2 inspection combed before setting,to provide an adequate key.G36

10 Curing - Rendering shall be kept damp by lightly spraying


with clean water a minimum period of 7 days after
AFC-Drawings Physical/Random
application. CCE/QCI AIP-C3100000175-CONC-07 M M
SP-1279 Sec 11.5.1.2 inspection
- Rendering shall be left undecorated for a minimum period of 4
weeks after application.
11 Final Inspection
AFC,MTO,SOW, Physical - AFC - Drawings
CCE/QCI Reports and Punchlist H W
SP-1279,SP 1282 100% -Height/Elevation,Finishes,Protection and opening
Plastering & Rendering - Inspection Report

Date:
PROJECT DELIVERY CONTRACT (PDC) - NORTH
Contract Title & No.: AIP Project No.:
C3100000175

Project Name: Ref. Drawing No.:

Area Location / Structure : Report No.:

SL
ACTIVITY DESCRIPTION ACCEPTED REJECTED REMARKS
NO

Mech: Elect:
1 Concealed Services Placed
Aircon: Plumb:

2 Back ground Preparation

3 Cement Type

4 Sand

5 Mortar Preparation

6 Metal Lathing / PVC Mesh / Angle

7 Stop Beading and Spatter

8 Application of coats and number of layers

9 Plaster dots

10 Total Thickness

11 Curing

Comments if any

Arabian Industries Projects LLC Client

Originated by Inspected by Accepted by

Civil Construction
QAE / QCI Petroleum Development Oman
Engineer

Name

Signature

Designation

Date

Arabian Industries Projects LLC


AIP-C3100000175-CONC-07 Rev 1

You might also like