Professional Documents
Culture Documents
TITLE:
AIP PDO
Page 1 of 4
INSPECTION & TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No. : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil Works Date : 04.08.2021
1 QA/QC - Quality Assurance / Quality Control Hold Point : A critical step in fabrication and testing where it is mandatory that the Company
inspect the component/equipment or witness an activity. Activities designated as a Hold Point shall
H -
2 QA/QCE - QA/QC Engineer not proceed unless the Company/Representative is present or the Hold Point is formally waived.
The Company shall be notified at duration specified in the contract in advance of the activity.
3 QCI - QC Inspector
4 AIP - Arabian Industries Projects LLC Witness Point : A critical step in fabrication and testing where it is desirable that the
5 PDO/Company - Petroleum Development Oman Company/Representative inspect the component/equipment or witness an activity. The Company
W - shall be notified at a duration specified in the contract in advance of the activity. Once proper
notification is given, the activity may proceed according to the schedule regardless of the
6 C.C.E - Civil construction Engineer
7 SP-1279 Ver 4.0 - Specification for Civil Construction Works (May 2019) Monitor Point : A critical step in fabrication and testing where it is optional that the Company
inspect the component/equipment or witness an activity. The Company shall be notified at a
M - duration specified in the contract in advance of the first occurrence of the activity at each worksite.
8 QCP - Quality Control Procedure No further notification for like activities at each worksite shall be required. The activity may proceed
Approval Point : A critical step in design, procurement, and or fabrication and testing where it is
mandatory that the Company approve a document/qualification/ equipment/or activity. The
A - Company shall be notified at a duration specified in the contract in advance of the first occurrence of
the activity or provided the document in a period of time specified by the contract. The activity may
Review Point : A critical step in design, procurement, and or fabrication and testing where it is
desirable that the Company review the document/qualification/ equipment/or activity. A separate
R - notification is not needed unless otherwise specifically requested; the Company may perform this
along with any of the other intervention types.
ARABIAN INDUSTRIES PROJECTS LLC
Page 2 of 4
INSPECTION & TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No. : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil Works Date : 04.08.2021
Revision Status:
ITP Ref No. / Rev. No. Date Revision Detail Prepared By Reviewed By Approved By PDO Approval
(Sr.QAE) (QA Manager) (QA Manager)
Exb:AIP-C3100000175-CONM-30 Rev.0
ARABIAN INDUSTRIES PROJECTS LLC
Page 3 of 4
INSPECTION AND TEST PLAN
Contract : PROJECT DELIVERY CONTRACT (PDC) - NORTH
Client : PDO Doc No: AIP-C3100000175-ITP-09
Contract No : C3100000175 PLASTERING AND RENDERING Rev No: 0
Category : Civil works Date: 04.08.2021
3 Material Approval
a) Cement AFC Drawings 100% - Ordinary Portland Cement in accordance with BS EN 197
Material Approval Sheet
b) Sand SP-1279 Sec 11.5.1.1, Verification test - Natural sand or Sand Consequent by Crushed Gravel QCI H A
(AIP-C3100000175-CONC-01)
c) Lathing and other SP 1282 & SOW certificate Approved by company
accessories
4 Material Receipt inspection - All materials shall be approved by company before delivery to
a) Cement site. (Unless specified otherwise,OPC shall be used)
AFC Drawings - Offer Material inspection after recivied at site (MIRR)
SP-1282 Ver-6 Sec - Every consignment of cement shall accompany with
2.4.2, Sec 2.4.2.1, manufacturer's compliance certificate for adherence to BS and
Sec 2.4.2.2, specifications
Sec 2.4.2.3, - Vendor / source shall be approved by company AIP-C3100000175-CONC-01
Sec 2.4.2.4 100 % - Shelf life MIRR
CCE/QCI H W
'Visual Verification - Weatherproof shed & on wooden palletes 150mm above from Manufactures data sheet ,
ground, stacked to a height not greater than 1500mm Batch certificates
b) Sand SP-1282 Ver-6 Sec
-As per SP-1282 Sec 2.4.1.5, Table 1
2.4.1.5
c) Lathing and other
accessories SP-1279 Ver-4 Sec -AFC Drawings
11.5.1.2 - As per manufacturer recommendations
8 Ceiling Finishing
- AFC Drawings
AFC Drawings Physical/Random - Preperation of mix for Rendering shall be 1 part of
CCE/QCI AIP-C3100000175-CONC-07 W M
SP-1279 Sec 11.6 inspection Cement to 4 part of Sand
- Thickness of Render shall be 6 mm
9 Tiled area Finishing
AFC-Drawings Physical/Random - Rendering to receive tiles shall be crosshatched or
CCE/QCI AIP-C3100000175-CONC-07 M M
SP-1279 Sec 11.5.1.2 inspection combed before setting,to provide an adequate key.G36
Date:
PROJECT DELIVERY CONTRACT (PDC) - NORTH
Contract Title & No.: AIP Project No.:
C3100000175
SL
ACTIVITY DESCRIPTION ACCEPTED REJECTED REMARKS
NO
Mech: Elect:
1 Concealed Services Placed
Aircon: Plumb:
3 Cement Type
4 Sand
5 Mortar Preparation
9 Plaster dots
10 Total Thickness
11 Curing
Comments if any
Civil Construction
QAE / QCI Petroleum Development Oman
Engineer
Name
Signature
Designation
Date