Professional Documents
Culture Documents
Abed
Digitally signed by Abed
OMJ-IPR-SRT-QA-6541 0
Employer: EPCC Contractor: Consultant:
TABLE OF CONTENTS
Date : 30/10/2021
INSPECTION TYPE SING & DATE INSPECTION TYPE SING & DATE INSPECTION TYPE SING & DATE INSPECTION SING & DATE
TYPE
A. Documents Review
H
Fabrication shop shall be ready prior to commencing RFI shall be raised to contractor QA/QC &
A.1 Fabrication Shop Qualification & Approval 100% Approved RFI H H
any activities HSE in order to check fabrication facilities
H
A.2 Approved Drawings 100% Latest P&ID and ISO revision as per drawing register Drawing Register Approved Drawing H H
H
Welding procedure to be approved prior to start any
A.3 Approval of WPS/PQR & WPQ 100% ASME B31.3 ASME IX WPS & PQR H H H
welding code
H
A.4 Welder Qualification & Control 100% As per the specification requirements ASME IX WPQR H H H
H
A.5 NDT Procedures 100% As per the specification requirements ASME V & ASME B31.3 Procedures H H H
H
A.6 NDT Personnel Certificates 100% As per the specification requirements ASME V & ASME B31.3 Certificates H H
R
A.7 Machines & Equipments Calibration 100% AS Per Specification Requirements As per P403-41-SP-CON-MEC-06 Certificates H H
H
A.8 Hydrostatic Testing Procedure 100% AS Per Specification Requirements As per P403-41-SP-CON-MEC-06 Procedures H H
W
A.9 Line Flushing OR Internal Cleanliness 100% AS Per Specification Requirements As per P403-41-SP-CON-MEC-06 Procedures H W
W
As Per OMJ-SPC-SRT-PI-0202
A.10 Painting & Coating Procedure 100% AS Per Specification Requirements Procedures H H
As Per OMJ-MAN-SRT-QA-1958
W
A.11 Bolt Tightening Procedure, If required 100% AS Per Specification Requirements As per P403-41-SP-CON-MEC-06 Procedures R/H RH
B. Material Receiving
W
• Verify material certificates/batch
Receive Inspection of Material (Line pipes, fittings, valves, fit
B.1 100% certificate OMJ-MAN-SRT-QA-1959 Reports (MRIR) H/C W
loose items,etc.)
•Check material quality
C. Piping Fabrication ( This Section Cover Also All Tracing Fabrication & Erection Activities Where Needed)
S/R
C.1 Mark Transfer For Piping 100% AS Per Specification Requirements As per P403-41-SP-CON-MEC-06 W W
S/R
Isometric Drawing
C.2 Cutting/ Beveling Edge Preparation & Fit-Up 100% As per ASME B31.3 Reports H W
As Per OMJ-MAN-SRT-QA-1955
W
ASME B31.3 AS per NDT Requirement
C.3 Visual Examination 100% ASME B31.3 Reports H W
Document
H
ASME B31.3 AS per NDT Requirement
C.4 NDT (RT,MPT,LPT) Variable As Per Specification Reports H H H
Document
W
C.5 Repair Of Welds 100% NDT Reports & Acceptable Weld Pipe Repair welding Procedure Reports H W
H
C.6 Pressure test (When Required) 100% AS Per Specification Requirements As per P403-41-SP-CON-MEC-06 Reports H H
W
C.7 Blasted surface meets profile requirement 100% • Surface profile measurements. OMJ-MAN-SRT-QA-1958 OMJ-SPC-SRT-PI-0202 H W
W
C.8 Primer/ Intermediate coat 100% • Check DFT OMJ-MAN-SRT-QA-1958 OMJ-SPC-SRT-PI-0202 H W
Process Pipes Inspection Test Plan for Piping Prefabrication and erection-3 Additional Spheres ITP Nº : OMJ-ITP-SRT-QA-6541
Rev.: 0
Date : 30/10/2021
INSPECTION TYPE SING & DATE INSPECTION TYPE SING & DATE INSPECTION TYPE SING & DATE INSPECTION SING & DATE
TYPE
D. Piping Erection
D.1 Release of Pipe Rack, Sleepers, etc. 100% • Release Note Reports H H R
D.8 Internal Cleanliness and/or Flushing 100% AS Per Specification Requirements As Per Specification Reports H H W
D.11 Final coat application + Touch-up Paint 100% • Check DFT OMJ-MAN-SRT-QA-1958 OMJ-SPC-SRT-PI-0202 H W W
“H” – HOLD: A point beyond which work shall be inspected by Contractor’s inspection resources and the Employer or its designated TPI. Wor k shall not
proceed without formal approval by the Employer or its designated TPI. Achievement of “H” points shall be notified to the Emp loyer.
“W” – WITNESS: A point beyond which work shall be inspected by Contractor’s inspection resources and work may proceed without formal documen ted
approval by the Employer or its designated TPI. Achievement of “W” points shall be notified to the Employer.
“R” – REVIEW: The documents of the inspection performed shall be submitted to the Employer or its designated TPI for review. Works may proc eed at
Contractor’s own risk.
“C” – CERTIFICATION: Specific and appropriate certification documentation is to be included in the document package.
“A-X%” – RANDOM INSPECTION X%: Random Inspection which overall percentage of inspection and testing. Indicated percentage value of inspection shall be
increased based on observed failure rates and as requested by the Employer.
Project Title:
Amman Strategic Reserve Terminal for Petroleum Products (ASTPP)
DRN Number: SRT-OMJ-DCS-4789 Revision Code: B Page: 1 of 1
DRN Title: Process Pipes Inspection Test Plan for Piping Prefabrication and
erection-3 Additional Spheres Contract No: 4/W/2013
CHANGES TO DOCUMENT:
N/A
Approved (Yes/No)