Professional Documents
Culture Documents
PHONE: +2 037456834
Mob: +97430989384 +20 1121473607
Email: mmohamedmm2009@gmail.com
mmohamedmm2009@yahoo.com
Egyptian / 08/09/1990
PASSPORT NO: A25181929 Expiry Date: 30 /06 / 2026
Qatar residency Available
SEAMAN” S NO: ……………… Expiry Date: ……………
NATIONALITY EGYPTIAN DATE OF BIRTH 08/09/1990
Religion: Muslim Marital status: married
Education: DIPLOMA OF ADVANCED TECHNICAL STUDIES SPECIALIZED (ELECTRIC)
SKILLS
Arabic Fluent
Language
English Good
Summary of experience :-
PIPELINE INSTALLATION.
PIPELINE INSPECTION \REPAIR\MAINTENANCE.
PLATFORM INSPECTION \REPAIR\MAINTENANCE.
SHIP VISUAL INSPECTION & NDT.
JACK UP RIG WELDING INSPECTION &NDT& SAND BLASTING.
RISER ULTRASONIC THICKNESS.
CABLE LAYING NETWORK & ELECTRICITY.
CUTTING & WELDING USING BRONCO TOOLS.
INSTALLATION SUPPORT CLAMPS &REPAIR.
SPLASH ZONE COATING & INSTALLATION WRAP RUBBER.
ANODE REMOVING &INSTALLATION.
INSTALLATION SUBMERGED OIL HOSE.
POWER STATION SERVICE.
INSTALLATION OF BREAKWATER SHORE PROTECTION SYSTEM (CORE-LOCK)
INSPECTION AND EVALUATION OF WATERWAYS
Nov-15- 2019 to
may-05-2020 Khayyam Contracting & Trading Jun Air Diver El WAKRAA
Job details
● Levelling around the riser shaft + inspection
● Placement of Manifold concrete blocks on seabed around the drilled socket
● Levelling top of the concrete blocks with Teflon plates
● Placement of Manifold Base Slab (+/- 80 Tons)
● Placement of the GRP Riser and Lifting Frame onto Manifold Base Slab
● Placement and fixing of temporary ballast over lifting frame
● Install grouting hoses in the riser socket and controlled grouting #1
● Placement of manifold chamber
● Fixating bolted connections on the manifold
● Placement and fixing of Corner Concrete Blocks onto Manifold base around Chamber
frame
● Install grouting hoses in the riser socket and controlled grouting #2
● Placement of the riser top cover blind flange (bolted)
● Levelling of the seabed suitable for placing the HDPE strings
● Placing and fixing the distribution pipes and the secondary manifolds
● Fix collars around pipes (considered separately)
● Entire HDPE strings sinking operation: fill the pipes with seawater, fix pipes to concrete
collars, adjust buoyancy, steer pipe to already placed flange, place the string on seabed, fix
the flanges
● Fix all the bolts on the flange + torque
● Placing the End parts (710mm Dia Strings) of the system by crane barge
● Install pressure hoses to the diffusers + the system pressure test before backfilling
● Install 84Nos. vertical diffuser spool pieces (Bolted Connections)
● Level around the vertical diffusers (after box placement)
● Place 84Nos. diffuser protection boxes
● Level the anti-scour material ● Guidance with placing buoys
● Execute final pressure test
● Install 84 Nos. duckbill diffuser valves (Bolted Connections)
● Survey works
● Laying geotextile
● Install armor rocks
● Filling aggregate
● Install blocks
● Removing finders
● Mack as built with surveyor
● Fixing silt barrier
● Cutting bolts on platform
● Inspection for the barge
● Filming and photo shooting
Sep-1-2018 to
VISIO Q co. TEAM LEADER Doha port Qatar
oct-2-2018
Job details:
● remove out blocks & install new blocks
● Installing pipe line water intake for the museum
● Recording video
Sept-21-2017 to
Khayyam Contracting AIR DIVER lusiel
Nov-31-2017 & Trading Jun
Job details: remove out cement blocks &install new cement blocks
June-1-2017 to
I.M.W AIR DIVER EGYPT
June-25-2017
Job details:
● Sea bad survey
● Under water photograph
● Underwater recording video using CCTV
Mar-23-2015 to Urbacon trading & contracting W.L.L
AIR DIVER Doha (Qatar)
Nov-10-2016 (UCC)