Iraq
Mustafaaltameemi95@gmail.com
QA/QC ENGINEER 00964 7738213821
MOBILE :
(cswip3.1 welding inspector) / ( BGAS grade 2 painting inspector) 07800667388
NDT Level 2 07738213821
0096478 00667388

Objective:
• Material Engineer: An ambitious and dedicated material engineer with practical and technical skills and a range of
experience within Quality Assurance/Quality Control inspection field and management with various projects in
Vessels, Tanks, Piping, Manifolds and Maintenance of oil and gas industries

 Education:
Bachelor of Material Engineering from university of Basra, IRAQ – 2017/2018

 CERTIFICATION:

1- CSWIP 3.1 WELDING INSPECTOR ( ID: 769349 )

2- CSWIP BGAS G2 PAINTING INSPECTOR ( ID: 769349 )

3- API 570 PIPING (in progress)

4- ASNT NDT Level – II Certification in:


▪ Radiography Testing
▪ Ultrasonic Testing
▪ Magnetic Particle Testing
▪ Liquid Penetrant Testing
▪ Visual Testing

5- OSHA Academy -Occupational Safety and Health Act Training Essentials Occupational Safety and Health.
Work Experience:

➢ Company Name: AL-KARRAR ENGINEERING COMPANY


➢ Position: QC WELDING ENGINEER
➢ Period: Nov / 2019 – present
➢ Department: Qc department
➢ CLIENT: ROO, British Petroleum (BP), petrofac .
➢ Job Location: Basrah, south and north Rumaila
➢ Job description: (Pipeline, piping, and Tanks construction)
➢ Field work clarification of company: al karrar is an iraqi engineering company for general contracting with many
projects such as pipeline projects, piping, vessel and tank project.

Responsibilities:
• Reviewing WPS and specification
• Check weather conditions/ prepare proper welding tent
• Confirm material size and type according to drawings
• Confirm proper consumables are been used
• Verify welders’ qualification before welding
• Check fit-up and alignment of the joints
• Maintain pre-heat (if required) & interphases temp. according to WPS
• Visual inspection on completed joints and identify the joints by marking the welder ID..Etc.
• working as a Document Controller for 5 months (do all the documentation require in QA/QC
department RFI, NDT Request, Weld map, Redline, MIT, tracking sheet, Material receiving
report.... etc.)
• Visual inspection for welding of pipeline, plate and nozzle joints for tank.
• Check the welding for each course of welding according to WPS and check the welding
machine calibration.
• Daily, weekly and monthly Reports including the inspection results with summary.
• Confirming proper cleaning between passes, confirming proper Welding machine settings.
• Ensuring proper preheat and Post Weld Heat Treatment (PWHT) set-up and performance.
• Receiving material inspection.
• Hydrotest for piping, pipeline and tanks.
• Dry PT for welded joint.
• Radiographic Film Interpretation according to the acceptance criteria.
• Inspection of Painting & Coating (WFT, DFT, surface profile, pill off
• adhesion test, salt contamination, roughness, holiday test)
• Prepare all document for the project Hand Over Document
➢ Company Name: AL-KARRAR ENGINEERING COMPANY
➢ Position: QC painting / coating ENGINEER
➢ Period: Nov / 2021 – present
➢ Department: Qc department
➢ CLIENT: ROO, British Petroleum (BP), SNC (KENT) .
➢ Job Location: Basrah, south and north Rumaila
➢ Job description: (Pipeline, piping, and Tanks construction)
➢ Field work clarification of company: al karrar is an iraqi engineering company for general contracting with many
projects such as pipeline projects, piping, vessel and tank project.

Responsibilities

• Checks surface preparation.


• Control of storage and certification of consumables.
• Performs qualifications of coating processes.
• Inspection of Painting & coating (WFT, DFT, surface profile,
Pull off adhesion test, Salt Contamination, Roughness, Holiday
Test), DFT and WFT calculation
• Carries out wet and dry film thickness checks.
• Monitors observations of the correct coding cycles.
• Performs adhesion testing.
• Performs penetration testing.
• Performs visual checks after blasting
• Evaluates impact testing.
• Checks and records atmospheric conditions prior to starting of painting operations.
• Verifies the correct colour-coding and painting.
• Performs visuals inspections.
• Provide assurance of the quality of the paint application
• Notify the consultant and owner of any anomalies or irregularities in the specifications
• Surface acceptance and substrate testing for painting
• Review all areas in scope of work with paint contractor prior to prep and paint application
• Assure caulking where necessary has been completed satisfactorily
• Unannounced onsite inspections
• Provide unbiased reports and a third party paint inspection
• Verify that all surfaces are in suitable conditions for painting
• Report all surface defects to consultant and owner at the prep stage, intermediate coat and
final finish
 Company Name: NOVOMET
▪ Position: field service assistant
▪ Department: Electrical Submersible Pumps ESP installation
▪ Period: From February ,2019 to August 2019
▪ Field work clarification of company: NOVOMET is an international Russian oilfield Service company and one
of the market leaders in designing, manufacturing and providing electrical submersible pumping system
& Services as well as Horizontal pumps and water injection systems for industrial and energy applications

Responsibilities:

• Assembly and disassembly the ESP equipment


• Connection of tandem units
• Electrical tests and pressure test
• Loading and unloading the equipment
• Preparation delivery inspection
• Run in hole and pull out of hole for ESP
• Spooler operation, cccps installation
• Preform splicing the cable
• Documents: PTW, reports and safety meeting
• Pre-commissioning: MTU preparation, monitoring, Start up and troubleshooting

 Company Name: AL-ATAA AL-JADEED


 Position: Logistic Manager
 Period: FEB, 2018 to JAN 2019
 Field work clarification of company: A customs clearance company to support the client companies Schlumberger,
Exxon, Kuwait energy and Eni, where AL-ATAA AL-JADEED company is authorized by the client companies to obtain
customs permits and follow up the official transactions of these companies

Responsibilities:
▪ Coordination with other departments between client companies and government Institutions such as Basra Oil
Company BOC.
▪ Organizing work in Excel by entering the required data such as declaration number and invoice number.
▪ Managing work through Outlook to track the progress of transactions.
▪ Prepare and sending the weekly report to client companies.
▪ Administrative work such as printing and stamping the required documents.
▪ Checking the validity date of the declaration to take the necessary action if the Declaration’s date has expired.
 PROJECTS:

PIPELINE:
- RU 97 QURAINAT STATION (DG-11)
- RU-174 / RU-374 / RU-073Z SHAMIA STATION DG-10
- HH26 / RU169 / RU32
- FLIXLINE between DG-11 and DG-14
VESSELS:
- Vessel / Train H, 2nd, 3rd & 4nd stage separator at DG-01
TANKS:
-Tank / Train H, 2nd stage separator at DG-01 (nozzles replacement installation)

 CODES AND STANDERS

All ROO STANDARD AND SPECIFICATION (Welding of piping, welding of


pipeline, welding of vessels, Hydrotest, Bolt tensioning and torquing, painting,
Wrapping, Etc.)
- API 1104
- AME SEC IX
- AME SEC VIII
- AME SEC V
- AME SEC II Part C
- ASME B31.4
- ASME B 31.3

 additional training and certifications


▪ British council English training course
▪ HSE oil & gas
▪ Fire fighting
▪ Slinging and rigging operation safety
▪ Hazard identification and risk assessment
▪ PTW-permit to work
▪ H2S awareness and SCBA training
▪ Fork lift safety
▪ Trained on electric arc welding
▪ Trained on drill and lathe machine
▪ Rigging and lifting
▪ Scaffolding
▪ First aid
▪ Basic ESP training
▪ Variable speed drive training
Skills:

 Languages:

• English: Good skills on listening, speaking, and writing.

• Arabic: Native language.

 Computer Skills:
• good skills Windows
• Microsoft Office (Word, excel)
• AutoCAD
• E-mail administration (Outlook)
• Good skills in research and writing reports.

 Hobbies:
• Reading and curiosity for knowledge and development my skills to have success.
• Active, ambitious and fast learning person.
Communication and interpersonal skills.

• Project of graduation:
▪ Trained on a new method of welding (FSWP) which using the heat generated from the friction stir welding process to
heat treat the aluminum and copper welding plate.
▪ Study the properties of various Aluminum alloys.
▪ Research in the industrial safety of engineering process.

 Additional qualifications:

• Inspection of material
• Reading P& ID
• Prepare and sending the daily report.
• I worked in workshop for piping checking all the drawing and fitting and visual inspection (VT) before the welding and
during the welding and after the welding.
• Checking the pipe from the damage by (Holiday Test) equipment
• Checking the pipe by liquid penetrate (PT) after welding
Page|7

 Background courses:

• QA / QC.
• CAD/CAM.
• Methods of engineering machinery manufacturing.
• Technology of Engineering Mechanical.
• Heat transfer and heat treatment.
• Thermodynamics.
• Static and dynamic mechanics of engineering’s.
• Principles of extraction

Please note that all documents and certificates are available upon request