You are on page 1of 10

CURRICULAM VITAE

MOHAMMAD ABU TAHER

APPLY FOR : QA/QC (Senior Piping Welding Inspector)

PERSONAL DETAILS

NATIONALITY : BANGLADESHI (SINGAPORE PERMANENT RESIDENT)


DATE OF BIRTH : 27 JULY 1982
LANGUAGES : BENGALI, ENGLISH & HINDI
CONTACT NO : +65 82333415, 84001048
EMAIL : taherma82@gmail.com

SUMMARY OF CAREER & EXPERIENCE:

Present project FPSO OKHA (Woodside) at Sembawang shipyard. Accumulated Approximately 15


Years plus Experience with QA/QC (Mechanical, Piping, Tank Construction), Vendor Inspection of (Marine
Engineering, Mechanical Engineering, Construction & Manufacturing Engineering) Excellent Knowledge and
Experience in Welding Technology & Painting Inspection, Safety, Fabrication/ Erection of Piping & Pressure
vessel and Mechanical Installation activities in Oil/Petrochemical construction projects, Live Plant and Shipyard.
Assignments in the Construction and Expansion Projects of Oil Refineries, Power & Petrochemical Plants, Marine
base Construction & Fabrication in Bangladesh, Singapore, and Brazil. Well aware and worked in ISO 9001
systems. Capable to prepare, establishes the procedures and Control the Execution and Quality Piping & welding
with GDP.

EDUCATION
• Bachelor of Engineering (Hons) Mechanical Engineering
University of Sunderland (UOS) U.K.

• Diploma in Mechanical Engineering


BTEC Higher National Diploma (HND), Pearson U.K.

• Adv. Diploma in Industrial Engineering & Management


NGEE ANN Polytechnic, Singapore.

• Diploma in Marine Engineering


Bangladesh Institute of Marine Technology (BIMT)

• Higher Secondary Certificate (HSC) ‘A’ level Equivalent


R.K.Chowdhary Degree College, Bangladesh

• Secondary School Certificate (SSC) ‘O’ level Equivalent


Bawany Adarsha Biddyalaya, Bangladesh

PROFICIENCY CERTIFICATION COURSES (WELDING TECHNOLOGY)

• Senior Welding Inspector (CSWIP-3.2.2) Level 3

MOHAMAD ABU TAHER

Page 1
CURRICULAM VITAE

• Welding Inspector (CSWIP-3.1) Level 2

Institute name: The Welding Institute (TWI), UK

• ASNT Level II (RT, UT, MT, PT)

WeldTeck Inspection Services (S) Pte Ltd. Singapore

• Material Test (Ferrite Number) on SS Steel

Ferritescope MP30E-S. NDT Instruments (S) Pte Ltd.

QUALITY MANAGEMENT SYSTEM (QMS):

• IRCA AUDITOR / LEAD AUDITOR ISO 9001:2008

Quest Certification Private Limited, India. February 2011

OCCUPATIONAL SAFETY & HEALTH SUPERVISORY COURSES:

• Risk Management Course

Absolute Kinetics Consultancy, May 2011. Singapore

• Building Construction Supervisor Safety Course BCSS (MOM)

(Absolute Kinetics Consultancy, May 2011. Singapore

• Oil/Petrochemical Industry Safety Course for Supervisors (MOM)

NTUC Learning Hub, December 2009. Singapore

• Exxon Mobil Leadership in safety Workshop

100, Exxon Mobil Chemical, March 2009. Singapore

• Safety Instruction Course for Supervisor (Manhole) MOM

NTUC Learning Hub, September 2009. Singapore

• Construction Safety Orientation Course (CSOC) MOM

NTUC Learning Hub (Ministry of Manpower Accredited)

• Fire Prevention & Fire Fighting. ii) Elementary First Aid

(STCW Code Table A VI/1-3 & 1-2), Singapore Polytechnic

PROFESSION ENGINEERING & TECHNICIAN MEMBERSHIP

• Registered Senior Welding Inspector EngTech

Cert No: R/45741, Engineering Council UK

MOHAMAD ABU TAHER

Page 2
CURRICULAM VITAE

• Full Member of Welding Technology SWS (F1881)

Singapore Welding Society

• General Member of Engineering Organization. ID: 00048 (IDMEABS)

Competencies and Skills Workforce in SPT Project in Exxon Mobil

• Achieving Best Supervisor Certificate month of July 2010 In-Refinery in the SPT Project Exxon Mobil Plant
• Achieving the Certificate of Appreciation 20, 000, 000 Safe Work Hours without LTI in SPT ExxonMobil.
• Achieving the Certificate of Completion Code of Business Conduct & Ethics 2009 & 2010 Training in FW.
• Achieving the Certificate of Appreciation 14 Million Safe Work Hours without LTI in SPT ExxonMobil.

EMPLOYMENT HISTORY

Company Name: Intertek Industry Services

Owner Representative: Woodside Energy Ltd (WEL)

Position: Senior Piping Welding Inspector

Project Name: FPSO OKHA

Date: 10 Nov 2015 to till now

Responsibility:

• Study the construction drawing, ISO drawing, Update the spread sheet, register welder list, WPS and
monitoring the daily progress and report to the higher authority of WEL. Attended the Quality and
Productivity meeting with the main contractor Sembcorp.

• Daily inspection for Super Duplex Stainless Steel (A790 Gr UNS S32750), LTCS A333, A106 Gr. B
Piping materials inspection heat no, cutting mark up, length and beveling of the fittings such as
Elbow, Flange, Tee, Reducer for fit-up preparation .

• Daily inspection for spools fit-up, no’s of tack welding, root land, Hi-Lo, alignment, dimension &
orientation as per ISO drawing, 2D and model for various system e.g Seawater line, export gas line
for jumper deck, offtake system, glycol system etc.

• Daily in process welding monitoring, surveillance the welding technic, process, welding parameters
such verify and record for interpass temperature, the heat input <100 OC for root, cold, hot & capping
pass against the approved WPS. Demonstrate site engineer for production and quality inspector of
SCM.

• Guide to the sembcrop shipyard QA/QC, welding foreman, supervisor for sound welding, purging gas
flow rate, and record the Oxygen (O2) level <0.5%, sponge plug position, cleanness the joint, filler rod
with Acetone prior to the welding activities & workmanship.

MOHAMAD ABU TAHER

Page 3
CURRICULAM VITAE

• Monitoring the daily progress fit-up & welding, keep surveillance for the repair welding with approved
repair procedure.

• Final welding visual inspection, surveillance for the NDT request. Review the Radiography test Films
& report and witness the Dye Penetrant (PT) test.

• Daily update & track the record and direct report to the woodside QA/QC lead. Review the inspection
report, endorsed and surveillance the MDR filling.

• Inspection pipe support, base plate blasting with surface profile, painting (primer, 2 nd coat, final coat
with IP paint according to AS, SSPC & ISO standard and project ITP, spec.

Position: Technical Specialist (Mechanical/Piping)

Client Representatives: Woodgroup PSN / GS E&C Korea / Technip Malaysia / Saipem Italy

Date: Oct 2015 to Nov 2015

Responsibility:

• Client and Third Party Inspector for assignments on Site and at Vendor Facilities
for O&G MNC clients.
• Represent Owner for Inspection and FAT.
• Onsite inspection for welding and NDT operations.
• Review WPS & PQR and ensure that specifications are adhered to.
• Checking of consumables used in welding to ensure compliance with specification.
• Monitor the Welding activities (Before, During & After) and Visual Inspection of welds.
• Onsite inspection to witness installation of Equipment.
• Third Party Inspection for Mechanical Tests (Destructive and Non-Destructive Test) and Chemical Analysis
Tests.
• Final Inspection, Hydrostatic Test and Pre-shipment Inspection of pressure vessels.
• Functional Acceptance Test of Valves.
• Final, Packaging and Pre-shipment Inspection of Gaskets, valves.
• Inspect and ensure that all work is executed as per client’s requirement and specifications.
• Review progress against the vendor schedule and provide daily inspection report.
• Review respective documents, specifications, standards, calibration certificates and approved construction
drawings and all other applicable requirements and regulations as stated in client’s specifications.
• Prior to shipment, perform document review on PO/packing list/material certificates for authenticity and
compliance as per client’s P.O. Check quantities, shipping mark etc.
• Issue inspection release note (IRN) upon satisfactory final inspection.

Company Name: GL Noble Denton (DNV-GL Oil & Gas)

Position: Mechanical / Piping Inspector (Owner Rep)

Project Name: Jack up Rig Drilling Construction B-Class (B337 (CP Latina), B338 (CP Latina), B339
(Arab Drilling), B340 (UMW Naga 5, B349 (Pemex), B350 (Pemex), B376 (UMW Naga 8) & B371 &
B372 (Fecon #1 #2), B351, B352 (Arab Drilling)

Date: 05-03-2013 to Sep 2015

MOHAMAD ABU TAHER

Page 4
CURRICULAM VITAE

Responsibility:

• Attend with joint inspection for Vendor supply equipment with Procurement Quality Plan.
• Review and verified construction drawing such as VCD, GA, P&ID under customers approved supplier list. To
check all the certificates, Equipment physical condition such as JIS check sheet as per Project specification or
VCD. The inspection covers the Mechanical/ Structural parts dimension, piping, spare parts and workmanship
for Valve, Diverter, Oilfield Equipment etc. Prepare the Quality Observation report, Non Conformity Reports &
Punch list if the items not comply the specification.
• To make sure that specific references to technical specification requirements and applicable codes and
standards such as ASME IX, B31.3 & Section VIII, Div 1, API 16D, 16C, API 6A referenced in the
specification, Purchase order and contact etc.
• Attended daily basis Inspection for Piping alloy material ASTM A519 Gr 4130 such as high pressure tubing
welding with GTAW, GMAW, FCAW & SMAW welding process, preheat & PWHT, erection, line check, hydro
testing & reinstatement
• Surveillance the in-progress work, project progress as per project planning schedule.
• Manage the work, monitoring the Keppel Fels QMRS, piping status, NDT progress, RT film review. Guiding
the QA/QC Inspector to achieve the project & class ABS requirement.
• Attended weekly management & production meeting
• Surveillance and monitoring the vessel endurance test, cantilever skidding test and drill floor load test, jack up
trail and incline test before ship delivery.
• Review the final reports, WPS, punch items, PCM and prepare weekly progress report, direct report to project
Manager and Director.

Company Name: Shaw Stone & Webster Asia, Inc. (EPCM)

Position: (Piping Welding Inspector & Pre Commissioning)

Project Name: SPT Olefins Recovery Project (ExxonMobil)

Date: 24-07-2012 to 01-03-2013

Responsibility:

• Review the daily basis piping test packages for pre-test and post test. Review the welder performance
and NDT completion as per line class and SHAW, GP’s requirement.
• Pre Commissioning and daily site basis piping inspection, surveillance, line walk-down raise and clear the
punch items.
• To check and make sure before and after post test all the welding, NDT, PMI, PWHT and erected
materials MTR completed, and reported in accordance and comply the ASME & ASTM code.
• Plan, organize, coordinate and monitoring and Leading subcontractor QC and give guidance to perform
the job as accordingly.

MOHAMAD ABU TAHER

Page 5
CURRICULAM VITAE

• Daily completed package updated list report to direct ExxonMobil QA/QC Lead and Shaw stone QA/QC
Manager.
• Attend the QC internal audit with ExxonMobil and weekly progress meeting.
• Attend inspection for pre commissioning activities, such as flange box-up, re-instatement according code
ASME 16.5 & 40 and coordinate with ExxonMobil Representative.
• Witness leak test, Tightness test, and final box-up, prepares rejection report for the damage items and
equipments.
Company Name: Foster Wheeler Asia Pacific Ltd (EPCM)
Position: (Senior Welding Inspector)

Project Name: LanXess BTR Singapore Project

Date: 07-Dec-2011 to 23-July-2012

Responsibility:

• Daily welding visual inspection for Carbon Steel, Stainless Steel 316L/304L, 22% Cr Duplex Stainless
Steel, and 25% Cr Super Duplex Stainless Steel.
• Witness for PQR for the Materials such as Hastelloy C ASTM B622 (P No. 43) to A 106 Gr B (P No.1),
Duplex Stainless Steel ASTM B729 UNS N08020 beside having experience SA 790 UNS S31803 (P
no.P10H) and 25% Cr Super Duplex Stainless Steel UNS S32550 and ASTM A790 UNS S32750 with the
welding process GTAW.
• Monitoring the surface preparing before welding, and checked the welding parameter, purging and heat
input rate.
• Monitoring the Quality of work such as Piping, Painting, Fireproofing as per code SSPC & NACE.
• Review the daily welder welding Dia-inch, Weekly welder performance and RT film review, rejection rate.
PWHT report, hardness test report and coordination on Safety matter at site Radiography test.
• To make sure job is being carried out as per Foster wheeler and Laxness project spec and subcon
approved procedure.
• Attend internal quality audit and meeting. Monitoring and maintain Test Pack, RT Rejection Rate
statistics. Raised QDR/NCR and report to QC Lead Engineer.

Project Name: SPT In-Refinery Project (IRF) and IC&T Project (ExxonMobil)

Date: 16-Jul 2008 to 14-Jan 2011

Responsibility:

• Inspection for Shut-down Turnaround SRU-1 & 2, Oil Tankage and Subsea Line and piping welding in
Chemical plant.
• Daily basis inspection on Piping oxygen line, Cement line, Impact tested Carbon steel, Acid service line and
other lines welding process for the materials UNS alloys NO4400 ('Monel 400') UNS alloys NO6600

MOHAMAD ABU TAHER

Page 6
CURRICULAM VITAE

('Inconel 600') UNS alloys N10276 ('Hastelloy C-276') UNS alloys NO8020 (‘Alloy 20’) with GTAW & SMAW,
as per WPS shall contain full details of backing gas conditions including gas composition, flowrate, closing
down type and maximum oxygen content in backing gas closure.
• Surveillance and visual inspection carried out daily basis activity flange, valves conditions, valve tags on the
construction plant according to ASME B31.3, ASME IX, and API 650 and Foster Wheeler Fabrication
standard.
• Review RT films, PAUT reports, PWHT report and review the piping and Tankage test package as per GP’s
requirement, Project Spec & Procedure. Regular RT performance statistics, NCR/ QDR status report to QC
Lead Engineer

Company Name: BNF Engineering

Position: Project QA Engineer

Project Name:

1. Fuel Gas Compressor System for CCPP 10 & 20 POWER SERAYA Project.

2. Power Gas Banyan OTS Project (Gas Transmission Pipe Line)

Date: 15-Aug-2011 to 06-Dec-2011

Responsibility:

• Performed incoming inspection on Vendor equipment’s, Materials, Valves, Electrical Panel, Pumps,
Motors liaison with client’s engineering/QA Purchase Order & Delivery Order at workshop & site.
• Prepare for design change notes, rejection criteria and non-conformance report (NCR) quality observation
reports (QOR) according to project Specification & VCD instruction.
• Verified the customer purchased order package list, Vendor data & erection manuals, quantities etc.
• Preparation of WPS, Construction method of statements, ITP’s and inspection test methodology, weld
joint repairing methodology, Organizing WPS, WQT and verification of test results and records, issuing
welder ID. Cards.
• Review the Subcon blasting & painting procedure, HSE requirements and conducting Inspection of the
surface preparation blasting & painting, wrapping, coating, holiday testing and insulation. sign of the final
paint reports to meet the Quality requirements and code SSPC
• Inspection of various types of Heat Exchangers as per ASME Section VIII Div 1

Company Name: Gammon Construction

Position: QA/QC Engineer (Lead)

Project Name: LanXess BTR Singapore Project

MOHAMAD ABU TAHER

Page 7
CURRICULAM VITAE

Date: 17-Jan 2011 to 08-July-2011

Responsibility:

• Supervision of site engineering activities, Maintain quality activities of underground cooling water pipe line
& Permanent Services pipe line. Prepare daily inspection report, Coordination with NDT and prepare
MDR.
• Worked with QA/QC Inspector in a project organizing and job monitoring a crew having Welding
inspectors, NDT & PWHT, painting inspector Interaction with them and reviewing their reports. Attend
internal auditing of Subcon progress reports, review Welder register, Welding consumables controlling
system , Materials receiving procedure and record keeping etc.
• Attended the Quality & Safety meeting with Foster Wheeler QA Manager and report to direct Gammon
Project Manager (M&E).

Company Name: Hiap Seng Engineering Pte Ltd

Position: QC (Welding/ Piping Inspector)

Date: 09-Sep-2006 to 23-Jun-2008

Project Name: SHELL HOUDINI ECC Singapore Project

Client; ABB Lummus Global B.V, CB&I.

NWS LNG Phase V Expansion

Client: Foster Wheeler Eastern Pte Ltd

Dung Quat Refinery

Client: Emerson process Management

Responsibility:

• Process control and monitoring piping and welding process like GTAW and SMAW as per the project
Specification, international Standards. Worked and Dealt with ASME B31.3, B31.1, ASME SEC VIII,
ASME SEC V, ASME SEC IX, ISO 9001, AWS D1.1, API 1104, 650, 653 and various standards..
• Prepare PQR, Welder performance report Welding Inspection for piping welding with GTAW, SMAW &
SAW welding process, Control daily welding and report to QC Manager.

Company Name: Jurong Shipyard Pte Ltd & Maua Jurong Shipyard Brasil

Position: Marine Engineering Fitter & Assembler & QA Inspector

Date: 13-July-2001 to 24-Aug-2006

Project Name: FPSO Conversion BRIGHT JEWEL

MOHAMAD ABU TAHER

Page 8
CURRICULAM VITAE

Client: Modec Int. LLC Singapore

FPSO Conversion RONCADOR Field Development (Petrobras P-54)

Client: PNBV Brasil

FPSO Conversion CNR Baobab Field Development. (T. T. NINA)

Client: Modec Int. LLC Singapore

FSO Conversion Chad Offshore Facilities (Companion)

Owner: Exxon Mobil Client: Modec Int. LLC

SEMI SUBMERSIBLE RIGS:

1. Development Driller Global SantaFe I


2. Development Driller Global SantaFe II

Client: Global SantaFe Corporation

Responsibility:

• Attend daily quality & safety meeting. Update the database for NDT test report and WQR
• Attend Inspection in fabrication shop to check welding on piping & hull structure.
• Daily basis inspection with client inspector on board and direct coordination with the Surveyor. Report to
JSL QA/QC Manager.
• Study of, ISO’s, GA, P & ID’s, and project specifications in order to observe the variety, size and
thickness of pipes and structural to be welded
• Daily basis Inspection for new ship building hull structural, Plate material and coordinate with the
classification surveyor such as ABS, LRS, NK, BV etc. Repair ships (Oil Tanker, LNG, LPG and Container
vessel)

SAFETY TRAINING & SEMINARS IN DIFFERENT PROJECT:

1) SOC, SMAW -3G (Shipyard_JSL)

2) ESOC/ SOC (Mom accredited) (SPT_Exxon Mobil)

3) Confined Space Entry Awareness (SPT_FWP)

4).Safety Induction at work Place (SPT_FWP)

5) Bicycle Training, CORE Behavior (SPT_FWP)

6) Working at Height & Suspension Trauma (SPT_FWP)

7) Enhance SHE rules & responsibility, SHE Supervisor (SPT_FWP)

8) Pre-start & Tool box meeting (SPT_FWP)

MOHAMAD ABU TAHER

Page 9
CURRICULAM VITAE

9) Permits to Work System (SPT& LanXess_Exxon Mobil & FW)

10) Demobilization Hazards Talk, Emergency First Aid Training (SPT_FWP)

11) NDT RT Safety Coordination (SPT_Exxon Mobil)

12) Zero Harm Training (LanXess_Gammon)

13) Harm Elimination and Recognition training (Heart) (LanXess_FW)

14) Occupational First Aid Refresher Course (LanXess_FW)

6 MONTHS JOB TRAINING ON BOARD INLAND OIL TANKER VESSEL:

Position Held: Cadet Engineer (Apprentice)

Period : 1st March 2000 to 31st August 2000

Vessel description: Name- M.T.SAIMA Type-Tanker, DWT/GRT-1230 tons Main Engine-Akasaka Diesel-800
BHP, 420 RPM Generator Engine-Yanmer Diesel Model no-6KFL, 120KVA 1200 RPM 220V, Carrying capacity-
1400 tons.

Company Address: High Speed Group of Companies (Japan JV) 103, (ground floor) Motijheel C/A, Dhaka-1000.
Bangladesh

End of CV

MOHAMAD ABU TAHER

Page 10

You might also like