PRE-PAVE CHECKLIST
This checklist should be performed by the Foreman and the Project Coordinator, a copy of this form must be emailed to the
construction manager and superintendent the day before the schedule paving operations
Project Number & Name Date
Element Mix Number
Total Asphalt Ordered (t) [2.2 - 2.4 t/m3] Spacing (min)
Contract Drawings Reviewed? ☐ Y ☐ N Dwg. Number(s):
Contract Specifications Reviewed? ☐ Y ☐ N Spec Number(s):
Ensure that sub-layers and surface layer have reached min 50OC prior to allowing traffic? ☐ Y ☐ N
Line Painting