Checklist for Tile Flooring

Checklist No.
Date:
Name of Project: Assetz Marq Lot-I Drgs Ref:
Client: Assetz Whitefield Homes Pvt Ltd. Contractor: Shapoorji Pallonji
Item Description: Inspection Requested by:

1ST INSPECTION 2ND INSPECTION Mix Grade:

Grid Reference: Req. on: Req. on:


Location Section Level Quantity:
By.: By.:

Points to Check √ x Action Req. √ x Action Req. REMARKS


Preparation
Check for cleanliness of base Surface .
Is loose mortar/debris removed from the work area ?

Check for completion of preceding activities like fixing of


electrical conduits,plumbing works, etc (Utilities)

Check for the fixing of bull marks and level

Check for thickenss of plaster bed. (thickness in mm)


Is the approved pattern of fixing of tiles available ?
Check the room dimensions and line/level
Check for availability of tools & man power
Sign- Contractor Sign - Client
Clearance for Next Activity -1st inspection: Yes / No Clearance Date:
Site Engg QA/QC

Sign- Contractor Sign - Client


Clearance for Next Activity -2nd inspection: Yes / No Clearance Date:
Site Engg QA/QC
In Process
Ensure tiles of same batch/lot being used to avoid colour
Batch no:
difference
Check for proper mixing of mortar ratio as per BOQ
Ensure Wetting of Tiles in Water before fixing
Check for Pattern of Laying
Check Thickness of spacer joints Between Tiles (mm)

Ensure True level of surface and slope (if any)

Check the starting point of tile laying, Matching of Tile


Joints ,Finishing of edges for Cut tiles , Right Angles
Check for Cutting of tiles around Sanitary Fittings, Grating
plates, and doors etc.
Sign- Contractor Sign - Client
Clearance for Flooring -1st inspection: Yes / No Clearance Date:
Site Engg QA/QC

Sign- Contractor Sign - Client


Clearance for Flooring -2nd inspection: Yes / No Clearance Date:
Site Engg QA/QC
After Flooring
Check for Cleaning of joints, splashing adj surfaces

Check for Flush Pointing of joints with approved grouting


material.
Final Check for Pattern , Slope , Right Angles, Surface
Finish, level Surface, etc.
Check for Hollowness, Levels and Variations.
Check for adequate curing
CLEARANCE

Observations / Points to be attended if any:

Sign- Contractor Sign - Client


Clearance for Next Activity -1st inspection: Yes / No Clearance Date:
Site Engg QA/QC

Sign- Contractor Sign - Client


Clearance for Next Activity -2nd inspection: Yes / No Clearance Date:
Site Engg QA/QC
Same batch/lot tiles used Acceptable To Improve Hollowness,level variations Acceptable To Improve
POST DADDOING

Line, level and Slope Acceptable To Improve Grouting of joints Acceptable To Improve
Arrangement for Curing /
Splashing of adj surfaces. Acceptable To Improve Acceptable To Improve
Ponding
Acceptable To Rectify Acceptable To Rectify
Acceptable To Rectify Acceptable To Rectify
Action Required if any:- Remarks: Rectifications done as
Damaged tiles rectify Grouting specified:
Slope Variation
Task End Date:
Contractor: Client:

Site Engineer QA /QC Project Engineer / Manager