INSTALLATION

Engineering Report
INSTRUCTIONS

2 way and 3 way Zone Valves


Piping Diagrams
2 WAY - V240, V241, V243, V245, V246, V261 VALVE BODIES

Stem Up Stem Down COIL


Valve Open Valve Closed

Valve installed on the supply side of the coil.

V240, V241, V243, V245, V246, V261, V246I COIL


ZONE VALVE BODIES ARE NORMALLY OPEN
STEM UP: VALVE IS OPEN
STEM DOWN: VALVE IS CLOSE
When used in conjunction with direct acting actuators Valve installed on the return side of the coil.
they become normally open valve assemblies.
When used in conjunction with reverse acting actuators The valve body must be installed in the
they become normally closed valve assemblies. direction indicated on the valve body cavity

Stem AB A
Up 3 WAY - V320, V325, V345 DIVERTING VALVE BODIES
The diverting valve body is installed on the supply side of the coil. B
The water diverts in the valve and mixes in the “T” the flow enters
AB A COIL
the common port AB
B The side port A must be connected to the supply of the coil
Stem The bottom port B must be connected to the bypass around the
Down
coil.
STEM UP: FLOW AB-A
AB A STEM DOWN: FLOW AB-B
B

Example 1
COIL

Stem 3 WAY - V321 MIXING VALVE BODY


Up The mixing valve body is installed on the return side of the coil. AB A

The water diverts in the “T” and mixes in the valve. B

AB A Piping example No1: The flow enters port A from the coil and
B port B from the bypass and exits from the common port AB
STEM UP: FLOW B-AB
STEM DOWN: FLOW A-AB Example 2
Stem COIL
Down Piping example No 2: The flow enters port B from the coil and
port A from the bypass and exits from the common port AB AB A

AB A STEM UP: FLOW B-AB B


B STEM DOWN: FLOW A-AB

SOLDER INSTRUCTIONS V245 AND V325:


If direct solder bodies are used, remove the stem packing cartridge during installation.
Heat will damage the packing. If solder unions are used, solder the unit without the sealing O-ring.
Spartan Peripheral Devices telephone: (450) 424-6067 • fax: (450) 424-6071 • email: info@spartan-pd.com • website: www.spartan-pd.com 2Way3WayPipingDiagram
22 June 2011