You are on page 1of 1

Report No: 2

GRADING OF GRANULAR SUB BASE


TEST REPORT
Date: 16/01/2023

Project : Construction of General Civil


Customer : M/S TATA Power Solar Ltd. Work(GCW) at 4 GW Manufacturing Plant Project Code: UI/670065
Gangaikondan.
WO No & Amndt, If any.:
Manufacturer : PO No & Amndt, If any.:
Item Description: Identification No.
Location : Sub Location:
Package: Drg No & Rev No :
FQP No. & Rev No. RFIC No.

Layer : Date of sampling :


Total Quantity offered for inspection: Date of testing :
Total Quantity inspected & accepted: Total Weight (gm):
Total Quantity inspected & rejected:

Weight Cumulative
Sieve Size (mm) Cum. Wt. retained (gms) % Passing
retained (gms) % retained

75.00 0 0 0.0 0.0

53.00 0 0 0.0 100.0

26.50 1665 1665 16.7 83.4

4.75 1741 3406 34.1 65.9

0.075 1418 4824 48.2 51.8

Pan 176 5000 50.0 50.0


Specification Limits

Sieve Size
(mm)
Grade I Grade II Grade III Grade IV Grade V Grade VI

75.00 100 - 100

53.00 80 - 100 100 100 100 80 - 100 100

26.50 55 - 90 70 - 100 55 - 75 50-80 55 - 90 75 - 100

9.50 35 - 65 50 - 80 35 - 65 55 - 75

4.75 25 - 55 40 - 65 15-35 25 - 50 30 - 55
10 - 30
2.36 20 - 40 30 - 50 10 - 20 Oct-25
0.85 - - 2 - 10

0.425 10 -- 15 10 -- 15 0-5 0-8

0.075 <5 <5 <5 <5 0-3


Result: Accepted / Rejected

Signature of Sub-Contractor & Date Signature of TPL - FQE & Date Signature of Customer / Inspection Authority & Date
Format No.08.03.05-FMT-C-GSB-TR-001-R00

You might also like