Formwork

This document is a checklist for formwork related to the substructure of a project called Full Kit Homes. It outlines various activities and requirements that need to be verified, such as the availability of approved designs, material testing, and the condition of shuttering. The checklist is intended for use by contractors and includes sections for remarks and signatures from site personnel.

Uploaded by

Gabriel Gabe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views1 page

Formwork

This document is a checklist for formwork related to the substructure of a project called Full Kit Homes. It outlines various activities and requirements that need to be verified, such as the availability of approved designs, material testing, and the condition of shuttering. The checklist is intended for use by contractors and includes sections for remarks and signatures from site personnel.

Uploaded by

Gabriel Gabe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Project: Full Kit Homes

Checklist for Formwork


ACTIVITY: STRUCTURE Sub Structure

Client : Checklist No: SNS-


Rev. No:00
Contractor : Date:
Location : Dwg No:
Note : Please appropriate box as per requirements

Sl No DESCRIPTION YES NO NA REMARKS


Check for availability of approved method statement & design of
1 shuttering scheme, mock up approval, material approval, and available
for reference
Testing of material done and found OK as per specifications and
2 frequency confirming to ITP Check for suitability, stability, safety &
rigidity of assembled form.
Shuttering in usable condition no warping, decaying, holes, dents,
3 ruptured surfaces or broken edges.(As actuals)
Completion of PCC works to the required dimensions.
4
Dimensions & alignment, starters & level of base checked & Location
5 of cut outs & services verified (± 5mm in 2.5m. ± 8mm in 5m. ± 10mm
in 10m & ± 5mm for opening size.) Location, Alignment on plan,
Dimensions, Diagonals Checked?
Props / stays / bracing / tie rods: Adequacy, rigidity, spacing and tying
5 of nuts & bolts properly & rigidity of base (As per approved formwork
design)
Check for spacing of props as per approved
6 scheme/design/requirement.
Gaps between shuttering filled, cleaning of shuttering & approved
7 shuttering oil applied (As per approved formwork design)
Check for number of vertical / horizontal supports as per the scheme
8 drawing / as per the structural requirement?
Check for verticality of supports.
9
Shuttering layout matches with approved drawing.
10
Shuttering cross section matches with approved cross section. ( As per
11 Drg.)
De-shuttering provision: Done
12
Note: Please record NA where not applicable