Report No:

MARBLE DRY CLADDING


CHECKLIST Date:

Customer : Project : Project Code:


Sub- Contractor : WO No & Amndt, If any.:
Manufacturer : PO No & Amndt, If any.:
Item Description: Identification No.
Location : Sub Location:
Package: Drg No & Rev No :
FQP No. & Rev No. RFIC No.

Qty: Grid No & Level:

Make: Section & Thickness:

Checked
Sl.No. Description of Check Points Remarks
Yes No NA
1 Approved shop drawing is available.
Ensure the availability of test certificates of
2
Marble,clamp,grouting sealent.
3 Ensure the Method Statement is approved by client
4 Ensure Mock up of the work is approved by client
Ensure the availabilty of guiding tools and material lifting
5
tools availability at site.
Ensure brick/block work, plastering completion & above Flase
6
ceiling services clearence.
7 Check for FFL marking at site.
8 Ensure the completion of all MEP,PHE & LV services.
9 Ensure the scaffoldingarrangements with safety
10 Ensure the protection of adjacent finishing works.
Ensure the surface preparation(cleaning,wetting) on Marble
11
installation work.
Check for X,Y direction reference lines & grid lines markings
12
according to shop drawing details.
13 Check for line, level & right angles

14 Ensure the Clamps fixing specifications as per shop drawing.

15 Esure the door & window opening area


16 Ensure the Marble joints & proper alignment.
17 Check for joints filling done are as per colour of Marble
Ensure Marble wall cladding corner edges protection with
18
approved materials.
19 Check for finish and cleaning.
Remarks :

Signature of TPL Signature of TPL FQE Signature of CONSULTANT/CLIENT


Format No.08.03.05-FMT-C-MDC-CL-002-R00