INSULATION HVAC PIPEWORK

PAGES 1
REPORT NO.: 205-l003
REV. NO 1

Client: Job No.:


Item Description Status Accept.
No. Yes No N/A

1 Limits of insulation with D & ID drawings and specifications.


2 Insulation, thickness and material in accordance with the
specifications.
3 Jacketing, type, application and condition conforms to
requirements.
4 Data plates and tag numbers are visible.
5 Insulation materials do not obstruct operation of access
manways.
6 Check that where required ‘snap on’ boxes are fitted in
accordance with the specification.
7 Identification labels and arrows installed.
8 System and temporary dust blinds are visible.
9
10
11
12
13
14
15
16
17

Punchlist No.:
OPERATIVE
OPERATIVE/
QA/QC CONTRACTOR CLIENT
SUPERVISOR
MANAGER
COMPANY
NAME
DATE
SIGNATURE