PINNACLE INFRASTRUCTURE CONSULTING
(TESTING DIVISION)
Reference No………….. Dated:…………….
TEST RESULTS
CLIENT NAME :-
PROJECT :-
SAMPLE :-
SAMPLING :-
CONDITION OF SAMPLE
TESTED AS PER :-
DATE OF RECEIVING :-
DATE OF TESTING :-
LAB CODE (UID) :-
RESULTS :- Shown in Table
TABLE INDICATING TEST RESULT OF PAVER BLOCK
Sl. Measurements Water Visual Compressive
No. Absorption Inspection Strength
Length Width Height % (MPa.)
for 08 for 08 for 08
Paver Paver Paver
Blocks Blocks Blocks
(mm) (mm) (mm)
Note:
- Sample will be destroyed after 30 days from the date of issue of test report unless otherwise specified.
- The report shall not be reproduced except in full, without the approval of the PIC
Mayank Rajpal Surya Prakash Pandey
Quality Manager Technical Manager
Page 1 of 1
Laboratory: B-94, Ramchandra Mission, Gate No.3, IIM Road, Lucknow-226013
Tel: 9910393180
E-mail: pinnacleinfraconsult@gmail.com