You are on page 1of 3

PWD LAB, KHANDWA CIRCLE OFFICE

No. ........... / PWD LAB KNW/ROAD/2020 KHANDWA DATE:

To,
The Sub Divisional Officer
PWD KHANDWA Sub Division

Subject: Testing of construction work on MATHELA SUDAMA PURI MARG

Reference: Letter No. Received in lab 585/TS/23-11/05/23

Following test results are being submitted herein;

S. Number
Road Work Description Tests Conducted
No. of tests

MATHELA SUDAMA CRM GRADATION


1. 04
PURI MARG WMM AIV

Attachments: Test Results - 02 pages

ASSISTANT ENGINEER
PWD LAB, CIRCLE OFFICE
KHANDWA

No. ........... / PWD LAB KNW/ROAD/2020 KHANDWA DATE:

Copy to: 1. The Executive Engineer, PWD, KHANDWA , for information.


2. The Superintending Engineer, PWD, KHANDWA , for information.
Attachments: Test Results – 02 pages

SUB ENGINEER ASSISTANT ENGINEER


PWD LAB, CIRCLE OFFICE PWD LAB, CIRCLE OFFICE
KHANDWA KHANDWA

1
PWD LAB, KHANDWA CIRCLE OFFICE

ROAD MATHELA SUDAMA PURI


SUBDIVISION/DIVISION KHANDWA/KHANDWA
CONTRACTOR SV CONSTRUCTION INDORE
AGREEMENT NO. 42/DL/22-23
REFERENCE NO. 585/TS/23-11/05/23
CHALAN NO./DATE SBIN0006159005905062023937794-05/06/23
MATERIAL TESTED CRM-GRADATION + AIV
SAMPLING DATE SAMPLING DONE IN PRESENCE OF SUB ENG MR ARJHARE
TESTING DATE 06-06-2023
TOTAL SAMPLE TAKEN (g) 10000

STANDARD AS
WEIGHT OF CUMULATIVE % CUMULATIVE STANDARD AS
% CUMULATIVE PER MORTH
S.NO. SIEVE SIZE MATERIAL MATERIAL MATERIAL PER MORTH (53
MATERIAL PASSING (37.5 MM MAX
RETAINED (gm) RETAINED (gm) RETAINED MM MAX SIZE)
SIZE)
1 63mm 0 0 0 100 100 -
2 45 mm 0 0 0 100 87-100 100
3 22.4 mm 891 891 8.91 91.09 50-85 90-100
4 5.6 mm 4032 4923 49.23 50.77 24-45 35-55
5 710 μ 2564 7487 74.87 25.13 10-25 10-30
6 90μ 2406 9893 98.93 1.07 2-5 2-5
7 Pan 107 10000 100 0 - -

CRM-IMPACT VALUE
S.No. Observations
1 Total weight of dry sample (g) 372
2 Weight of portion of crushed material passing 2.36mm IS Sieve (g) 45
3 Aggregrate Crushing Value (%) 12.10
NOTE: 1.This test report supplied shall not be subjected to any legal cases.
2. These results are confirmed to the samples as received in lab.
3. Sealed samples delivered through official person are expected for reliability.

SUB ENGINEER ASSISTANT ENGINEER


PWD LAB, CIRCLE OFFICE PWD LAB, CIRCLE OFFICE
KHANDWA KHANDWA

2
PWD LAB, KHANDWA CIRCLE OFFICE
ROAD MATHELA SUDAMA PURI
SUBDIVISION/DIVISION KHANDWA/KHANDWA
CONTRACTOR SV CONSTRUCTION INDORE
AGREEMENT NO. 42/DL/22-23
REFERENCE NO. 585/TS/23-11/05/23
CHALAN NO./DATE SBIN0006159005905062023937794-05/06/23
MATERIAL TESTED WMM-GRADATION + AIV
SAMPLING DATE SAMPLING DONE IN PRESENCE OF SUB ENG MR ARJHARE
TESTING DATE 06-06-2023
TOTAL SAMPLE TAKEN (g) 10000

WEIGHT OF
CUMULATIVE % CUMULATIVE % CUMULATIVE
MATERIAL STANDARD AS
S.NO. SIEVE SIZE MATERIAL MATERIAL MATERIAL
RETAINED PER MORTH
RETAINED (gm) RETAINED PASSING
(gm)
1 53mm 0 0 0 100 100
2 45mm 0 0 0 100 95-100
3 22.4 mm 3184 3184 31.84 68.16 60-80
4 11.2mm 1359 4543 45.43 54.57 40-60
5 4.75mm 2195 6738 67.38 32.62 25-40
6 2.36mm 1182 7920 79.2 20.8 15-30
7 600μ 1009 8929 89.29 10.71 8-22
8 75μ 948 9877 98.77 1.23 0-5
9 Pan 123 10000 100 0 -

WMM-IMPACT VALUE
S.No. Observations
1 Total weight of dry sample (g) 369
2 Weight of portion of crushed material passing 2.36mm IS Sieve (g) 39
3 Aggregrate Crushing Value (%) 10.57
NOTE: 1.This test report supplied shall not be subjected to any legal cases.
2. These results are confirmed to the samples as received in lab.
3. Sealed samples delivered through official person are expected for reliability.

SUB ENGINEER ASSISTANT ENGINEER


PWD LAB, CIRCLE OFFICE PWD LAB, CIRCLE OFFICE
KHANDWA KHANDWA

You might also like