You are on page 1of 1

JASANZ

Renuka Consultants
GEOTECHNICAL SERVIcEs STRUCTURAL SERVICES MATERIAL ASSESSMENT

TEST REPORT FOR CONCRETE CUBE


To, Date 24/06/2022
MINI SIGNAGE AND GRAPHICS LLP.
Test Report No: TC-701522000001886
8A, Floor- 3rd, Vimal Udyog Bhavan,
Opp. Star City Cinema,Matunga (West), Sample Received Date: 22/06/20222
Mumbai 400 016. Test Date: 23/06/2022
Ref No Letter dated on: 22/06/2022
Description of
Concrete Cube
Materials
Lab ID 2022060490 Source
Grade of Location of 94/600 Mumbai Corridor of YCEW
M-30
Concretee Sampling
150X 151X 151 mm
Size of Method of
151 X1 50 X 150 mm
Specimen
150X150 X150 mm Sampling
Sample : Client Test Method: IS 516 (RA 2018):1959
Extracted by:
Page I of1
Sr. Date of Curing Date of Weight Compressive Average Remarks
No. Casting Period Testing of Strength Compressive
Sample Strength
Date (e) N/mm
Date Days
23/06/2022 8006 32.70
24/05/2022 28
24/05/2022 23/06/2022 8062 33.25 32.85
2 28
23/06/2022 8060
3 24/05/2022 28
Note: 1)Sr.No. 1,2&3 considered for average.
2. .60

Note: 1) Results as shown in the report relates only to the sample/s received and tested in this laboratory.
for the expanded uncertainty of the measured
2) This statement of compliance is based on 95% coverage probability
results.
3) This Certificate should not be produced in any part. 4) Any query regarding the report should be reported immediately.
accurate and reliable information, 'RC (RERL)' is not
5) While RC (RERL)' bas made their best endeavors to provide
or eror made.
responsibe for any financial liability due to any act of omission

Checked By
Checked By

Prajakta Rane
Sharath R M.
Deputy Technical Manager ONSDeputy Technical Manager

Authorized Sfghatory
Authorized Signatory
Dr. Yogini Deshpande
Sandip Deshpande
Technical Manager Quality Manager
410208. Maharashtra.
Plot L-139, Taloja, MIDC, Panvel,Dist. Raigad
-

no.
Email: info@renukac.co Mb no. +91-9021574221

You might also like