You are on page 1of 3

P.M.G.S.Y.

QUALITY CONTROL DISTRICT LABORATORY CHIPLUN


Test Result of Cement
TEST RESULTSHEET: RC-01 REVISION 01

1.Job No - RI2023/ 5 S IP.M.G.S.Y/MRRDA DIST/ LAB


2. Name of Work Constructing R.C.C GSR AT Konhavali Tal Mandangad.
3. Name of sub division Z.P. (M.I) Sub Division Mandangad
4. Type of cement - 53 Grade
5. Date of Manufacture
6. Sample No 1 bag
7. Date of Testing 15-05-20023
8. Date of Receipt 10-05-20023
9. Agency Shri. Gaurav R Ghosalkar.

Type Of Test Specified limit


1)(A)Fineness by 5% Max. for P.P.C.
sieving (%) 10% Max. for O.P.C.
2) Initial Setting 144 min Not less than 30 min.
time (Min)
3) Final Setting time 287 min Not more than 600 min.
IMin)
|4) Compressive Curing
strength in Kg/Cm2

Period 33Grade 43 Grade 53 Grade

3Days 3 Days 160 kglcm2 230kgicm2 270kg/cm2

7 Days 7 Days 220kg/cm2 330kglcm2 370kkglcm2


28 Days 28 Days|330kkglcm2 430kg/cm2 530kglcm2
5) Soundness by Expanslon not more than 10mm.
Liechatelier
LADparatus
6) Specific gravity 3.10 to 3.15
7) Standard Not more than 30%
hin
consistency
Note The test results are based on samples recelved In the Laboratory.
Tested by JE Result Verifled by - DE

Eng1neer
P.M.G.S.Y. Quality Control Deputy Engmeer (Lab)
District Laboratory Chiplun PM.G.S.Y. Quality Control
JY 314YdI (I. H. 91. H. .) District Laboratory Chiplun

f i 29]osf2o
Satisfactory
Remark
CHIPLUN

District
Latboratory
Chiplur
PM.G.S.Y.
Quality
Control
Deputy
Engneer
(Lab)
LABORATORY Unit
Wt.Kg/m 0.39
Kg/m.Kg/m.0.89
0.62 1.58
Kg/m.Kg/m.
Mandangad.
REVISION
P" 5

Tal
ActualOD
Average DE
DISTRICT Konhavali
-
Mandangad mm 16
mm 12
10 mm
by
8mm Verified

STEEL
LAB AT Ghosalkar. Laboratory.
Result
GSR
CONTROL
DIST/ Division
SHEET R.G.C
the
P.M.G.S.YIMRRDA Dia,
in
mm
Sub R
Gonstructing
Gaurav 10-05-2023 mm 12
10 mm 16
mm in
RESULT 15-05-2023 6mmn 8
mm recelved
(M.I)
P.M.G.S.Y.QUALITY
Z.P. Shri. samples
TEST Laboratory
District
Chiplun
Quality
Control
P.M.G.S.Y.
on
RR2023/52e Description SteelTor
SteelTor
SteelSteel Junior
Engineer
SteelTor
Tor Tor based
:
Division 2 are

Of 6.Date
of
Receipt
5.Date
Testing results
2.Name
ofWork
Sub
testTested
byJE
- of 4Agency
No Sr.
No. The
3.Namne
2 5
1Job 1
Note
Days
instrength curing
Kglcm2
9 159.70 159.83
Specified
in
kglcm2
Compressive nD

Observed
9Days 9Days
PM.G.S.Y.
Quality
Control
District
Laboratory
Chiplun
Deputy
Engneer
(Lab)

CHIPLUN Compressve
strength
in
159.70
kg/cm2159.50 159.90 160.10
159.80 159.60
:-D.E

- by
LABORATORY Maximum
verified

load
in M.T. 35.98
35.93
35.89 35.96 35.91
36.02
Result
Mandangad.
Cube
sectlonal
Sq.
cm.
Cross in
Concrete Area 225 225225 225225225
DISTRICTTal
Konhavall 15x15x15
9Days
Speclmen Days15x15x15
Dimension 9
Mandangadof cm.
In

CONTROL Result
AT
RZ02353 Ghosalkar.
SPM.G.sYMRRDAJ
DISTDAB
GSR
Dlvision Test of
AgeCube
in
days
laborator

R.C.C
P.M.G.S.Y.QUALITY
R the
Sub Gaurav
Constructlng date
Actual
of
Testing 15-05-2023 15-05-2023
06-05-2023
10-05-2023 in
District
Laboratory
Chiplun
(M.) rocehod P.M.G.S.Y.
Quality
Control
ZP.Shrl. Engiheer
06-05-2023
of Casting
Date

Dvison eba

-
Receipt Actual
Date
of
receipt
of concrete
1
Grade
retts
No.3.Name
ofWork
2.Ref.
Letter Sub M200 M-200
E
ttest
of
5.
Agency
of
1.Job
No Name Date
Tested
bye
:h

Sr.No. 2 Note
4. 6.