Professional Documents
Culture Documents
Date:
"Materials Inspection and Check Certificate" (MICC)
1 2 3 4 5 5 6 7 8 10 11 12 13 14
2 no.s 8W CFL lamps with one suitable invertor ( DC to
1 S3 - 6.6 Set. 0 1.00 0 1.00 1.00
AC)
2 S3 - 6.12 Dicharge rod for 22 KV (I/C) Set. 0 1.00 0 1.00 1.00
3 S3 - 6.13 Discharge rod for 22 KV (O/G) Set. 0 1.00 0 1.00 1.00
JOGLEKAR MOTOR
Supply & installation of LED tube light fittings with 2007412253 dtd:- TRANSPORT
10 S3 - 7.16 GM Modular No. 0 16.00 0 16.00 16.00
external batten (20W) (for control room lighting) 15/10/2020 SERVICE 17745 dtd:-
19/10/20
Authorised Signatury of the Implementing Agency,inspected &
Authorised Signatury of the Contractor Authorised Signatury of the TPQA
issued to work
For M/s.Leena Powertech Engineers Pvt Ltd For TUV SUD (TPQA NCRMP II Project) For Maharashtra State Electricity Distribution Co.Ltd.
8
9
10
11
12
13
Material Description Make Qty
RCC Half Round Pipes Prestressing 2000 Nos.
RCC Full Round Pipes Prestressing 100 Nos.
Foundation Bolt J S Industry 250 Kg
2 no.s 8W CFL lamps with one suitable invertor ( DC to AC) 1 Set
Dicharge rod for 22 KV (I/C) 1 Set
Discharge rod for 22 KV (O/G) 1 Set
Tool box with ratchet spanner,flat spanners,box spanner, plier,
screwdriver, hammer ,hacksaw with blades, chisel,files 1 nos.
(Standard make) PRISTINE
ELECTRO
2 Cell torch SOLUTION 2 nos.
3 Cell torch 2nos.
Aluminium ladder (Adjustable) 1 nos.
Distribution Box with 16A (6 nnos.) & 63A ELCB (1no.) 1 nos.
16 Amp Socket with MCB & wiring arrangement compete for 60 Rmt.
supply for Air conditioner
Supply & installation of LED tube light fittings with external
GM Modular 8 nos.
batten (20W) (for control room lighting)