CKT 1
SN Item L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 Total
2 Route length 414 411 450 421 431 391 411 406 426 426 406 412 462 466 431 531 541 491 7,927
3 Cable Length 1,296 1,260 1,377 1,290 1,320 1,200 1,260 1,245 1,305 1,305 1,245 1,290 1,440 1,425 1,320 1,620 1,650 1,620 24,468
Excavation, including
3 414 411 - - - 460 440 450 185 213 406 360 - - - - - 232 3,571
HDD
4 Sand Bedding - - - - - - - - - - -
8 Jointing
CKT 2
SN Item L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 Total
a Route length 440 441 437 421 431 441 441 451 462 572 551 561 561 566 546 516 536 501 8,875
Cable Length 1,374 1,350 1,338 1,290 1,320 1,350 1,350 1,380 1,440 1,770 1,680 1,710 1,710 1,725 1,665 1,575 1,635 1,650 27,312
Excavation, including
3 440 441 435 370 - 441 441 451 185 213 406 360 - - - - - 232 4,415
HDD
4 Sand Bedding -
8 Jointing
DAILY PROGRESS REPORT Date: 02/10/2021
PROJECT : Project Management Consultant (PMC) for Utility shifting for Pune Metro, Pune
Sr No Document Received Under Preparation Tender under preparation Finalization of Tender document for publish
C - Status of Invoice
Sr No Received to PMC Name of Contractors Observation Remarks
TUV SUD / Pune Metro -PMC Daily Progress Report / 001 Ver 0.0 /dt.01-02-2021
DAILY PROGRESS REPORT Date: 02/10/2021
PROJECT : Project Management Consultant (PMC) for Utility shifting for Pune Metro, Pune
a) Phase - 1 0.00
c) Phase - 3 0.00 -
3) Joint Bay
a) JB-08 CKT-2 cleaning work in progress at L1 section b)
JB-11 CKT - 1 cleaning work completed
-
-
4) MDN Tower
TUV SUD / Pune Metro -PMC Daily Progress Report / 001 Ver 0.0 /dt.01-02-2021
DAILY PROGRESS REPORT Date: 02/10/2021
PROJECT : Project Management Consultant (PMC) for Utility shifting for Pune Metro, Pune
1 Hinjewadi Phase 2 Trench Dressing work L11 section near Infosys gate 6, trench dressing work is in progress.
3 Hinjewadi Phase 2 Earthing rod fixing Near DLF park, Earthing rode fixing work is in progress.
Near Infosys gate 6, HDPE pipe has been layed in front of Infosys gate
4 Hinjewadi Phase 2 HDPE Pipe laid
and also backfilling done.
6 Hinjewadi Phase 2 Trench Backfilling Near Jupiter house, Trench backfilling work started
TUV SUD / Pune Metro -PMC Daily Progress Report / 001 Ver 0.0 /dt.01-02-2021
DAILY PROGRESS REPORT Date: 02/10/2021
PROJECT : Project Management Consultant (PMC) for Utility shifting for Pune Metro, Pune
TUV SUD / Pune Metro -PMC Daily Progress Report / 001 Ver 0.0 /dt.01-02-2021