You are on page 1of 4
SGS India Pvt. Ltd. SGS Inspection report File No: 5046580 Inspection Report No. :- SGS/MUM/MHS/11/2023/0204 Place of inspection : Gat No-273, Pimpainare Phata, A/P- Pimpainare, Tal- Dindori, Dist- Nashik Date of inspection:- 6" November & 8" November 2023 Time In : 09.00 AM Time Out 06.30 PM Name of the Project ( if any ) ‘Water Supply Scheme Under Jal Jeevan Mission (2022-23), Nal Pani Purvatha Yojana At-Kudoshi Tal-Khed, Dist- Ratnagiri Name of Client Executive Engineer, Rural Water Supply Division, Zila Parishad, Ratnagi Name Seller / Manufacturer / Vendor Contractor= Raigad ‘Manufacturer - M/s. Drip India Irrigation Pvt, Ltd, Gat No-273, Pimpalnare Phata, A/P- Pimpalnare, Tal- Dindori, Dist- Nashik, Maharashtra-422004 ‘Mis. Shivraina Construction (Wr. Prasad Prabhakar Awale), Ci 's PIO No. & Date PO Nor... did.19,10.2023 Date of last inspection NC Inspection call reference Email dated October 30, 2023 ‘Status of previous hold pc J Deviation Nil P.O. Status: Completed / Balance / Hold ‘Completed. Quantity Item # Quantity Quantity | Quantity sper, | Description size | Spe, | Previousy | Guantiy onred | uantiy Now | Quany | Quantity canecy “mer | qpimsed | “‘tNony” | yas” | Regcny) Bane Grr forte, | ce! ony Woe} | foe} HDPE PIPES AS PER IS 4984:2016, Amendment No.: 2 (April 2022) For KUDOSHI PETOO, PNG, DNGS, SDR21, Plain End, HDPE Pipes. 4226 Mtrs 4226 Mrs 4226 1 NIL (10Nos x 400M | (10Nos x 400 M NIL NIL Batch No- 20231025002, | Mire 20231026A001 , & 1Nox226M) | & 1Nox 226M) 20231026A002 & 20231027A001 PE100, PN6, DN75, SDR21, : 2576 Mire 2576 Mtrs Gis MER HDeS pono | 2em70) |. aan, | aesee eel Gena tee Batch No- 202310228001 & 1No x 76M & 1Nox 76M & 202310228002 PE100, PN6, DN125, ‘SDR21, Plain End, HDPE Pipes. 1302 1302 Mtrs 1302 Mtrs 3 Mtrs- ae (217Nos x 6 M) (217Nos x 6 M) ae we Batch No- 202307038001 & 202311018001 PE100, PN6, DN140, Sorat, 4 |Plaivena, HOPE Pipes. | 42 | seein oMee NL Batch No- 202310038001 \VF-IN-&E-IN-012 / Ver 2.6 /20-01-2023/ Page 1 of 4 SGS ‘SGS India Pvt. Ltd. Inspection Report No: SGS/MUM/MHS/11/2023/0204 Dated 08.17.2023 Annexure No of Reference Documents. Scope of inspection and Status Dotalled report PON. & Date = dtd.19.10.2023 For HDPE Pipes CARI EINO) 1. Verification of outside used Instrument Calibration evel a Cettificates/ Records - Completed. abies Pet eee 2016 2. Review of Raw Material TC's - Completed. Fe eS 3, Random Quantity Verification - Completed (April 22). 4. Visual Inspection at Random/Sampled Quantity of Pipes/Coils - Completed. peprovedl Drawing No 5, Dimensional Check on Sample Pipes/Coils — Revision Completed. ne 6. Witness of Various Acceptance Tests as Per Reference standard/code7” | “ig4ge4:2016 for Sampled PipesCoil Pees tke — specification & Edition / (aMEH FON rase Dene Version / Year : i (ii) Base Density Test - Done. 1) IS 4984:2016 STD, (iil) Reversion Test - Done. Annexure ~ 4 Amendment No.2(Aprl2022) | (1) Bongation af Break —Done, 2) IS 2530:1963. « etn Caton Bleck Content & Carbon Blac 4) IS 10141:1082. (vi) Oxidation Induction Time Test - Completed. 5) IS 16738:2018. (vil) Internal Pressure Creep Rupture Test (Hydrostatic Resistance Test) at 80°C for 48 Hours on Sampling Standard & Edition | “Sampieq Pipe/Coil Pieces (1 Sample Per Size) — Version / Year Completed, AS per Std. 7. Marking Verification on Random Pipes/Coils Check — Completed, 8. Review of Manufacturer's Internal Type Test Reports Reviewed for Tensile Strength for Butt Fusion, Overall Migration Test, Hydrostatic Pressure Test on Pipe Pieces - Completed. Current Hold points / Deviations: NIL Remark: Result of inspection was satisfactory at the time and place of inspection, however advised to supplier for cleaning & safe handling during transportation. QAP is not provided, Inspection is carried out as per IS 4984:2016 std. Type test reviewed & other tests witnessed. Enclosure: 1. Witness Test Reports 2. Internal Test Reports 3. Raw Material Test Certificates 4. Calibration status report, ; Bin KENT \VF-IN-I&E-IN-012 / Ver 2.6 /20-01-2023/ Page 2 of 4 SGS SGS India Pvt. Ltd. Detailed Inspection Report File No: 5046590 Annexure No : 1 Report No and Date- SGS/MUM/MHS/1 1/2023/0204 Dated 08.11.2028. Page :01 of 01 | Material and Quantity Inspected. As per given on page no. 1 of this report ‘Sr. No. Details of activity performed, findings and product marking Conclusion For HDI PE PipesiCoils AtMis. Drip India Irrigation Pvt. Ltd., Gat No-273, Pimpainare phata, At-Pimpainare, etDindori, Dist- Nashik - Inspection Carried out for Offered Above Mentioned HDPE Pipes/Coils in Black Color with 03 Blue Color Strips offered for Inspection, Inspection is Carried out as Per IS4984:2016 (Amend. 2) Noted Offered Quantity Physically Verified with Offer List and found in Order. In Order Rew Material Test Certificate Reviewed for Base Density, MFR, Volatile Matter, Water Content & Antioxidant and found in Order as Per Annexure ‘C’ & 'D’ of IS 4984:2016, 1S10141:1962 & IS 16738:2018 Accepted Manufacturer's Internal Test Reports (Each Batch in Consignment) for Base Density, MFT (Melt Flow Rate), OIT (Thermal Stability) & Carbon Black Content (CBC) are Reviewed found in Order as Per IS Requirements. Accepted Visual Inspection Done on Sampled Pipes for Visual Appearance, Color of Pipe /Col’& Color of Strip- Found Acceptable as Per Clause No. 7.1 of |S 4984:2016 8) Intemal & External Surface found Smooth, Clean & free from Grooving & other Mejor Defects. ) Both End of the Pipes / Coils found Square to the Axis of Pipe/Coil Ends. ©) Colour of the Pipe found Black with Three Blue Colour Strips on OD Circumference. ¢) Not found any Major Longitudinal Grooves or Irregularities on Sampled PipesiColls from Inside & outside. Accepted Dimension Checked on Sampled Pipes/Colls (OD, Wall Thickness, Ovally, Length, Max Out of Squareness) -~ Readings Observed within Tolerance Limits as Per Clause No. 7.4 & Tablo 3 and 4 1S 4984:2016 Accepted Melt Flow Rate Test Witnessed Per IS 2530:1963 Witnessed on Sampled Pipe/Colle Pleces = ; Results found Within 30% as that of Manufacturer Declared Resin MFR as Per Clause No. 8.4 & Table 2 of IS 4984:2016. Accepted. Base Density Test Witnessed a8 per IS 7328:1982 on Sampled Pipa/ colls Pieces — Resulis found Within Range Between 940 to 960 kg/m? as Per Clause No. 8.7 & Table 2 of IS 4984:2016. Accepted Longitudinal Reversion Test Witnessed on Sampled Pipe/Coil Pieces — Results found Wihin Range Below 3% as Per Clause No. 8.2 of IS 4984:2016, Annexure 'F’, Accepted 10. Carbon Black Content & Carbon Black Dispersion Test as Per IS 2530; 7063 Witnessed on ‘Sampled Pipe/Coil Pieces —- Result Found Within 2.5 + 0.5% as Per Clause No. 8.3 of IS 49842016. Also, Carbon Black Dispersion Checked and Found Satisfactory. Accepted 11 Determination of Thermal Stability (Oxidation Induction Time) Test Witnessed on Sampled Pipe/Coll Pieces (1 Sample Per Size) — Time Observed More Than 20 Minutes as Per Clause No. 8.5, & Annexure ‘B' of IS 4984:2016, Accepted 2 Intemal Pressure Creep Rupture Test (Hydrostatic Resistance Test) at 60°C for 48 Hours as Per Annexure ‘E’ Witnessed on Sampled Pipe/Coil Pieces (1 Sample Per Size) for Plain Pipe/Coll Pieces —- Found No Localized Swelling, No Leakage or Bursting has beon Observed after Completion of Testing Time Period, Accepted 13, On Sampled Coils/Pipes for each Size, Marking Observed as — DRIP INDIA’ (Manufacturers Brand Name in English Language), HOPE PIPE, PE100 (Material Grade), PN-XX (Pressure Rating), DN-XX (Pine Size), SOR-XX, IS:4984:2016, ISI Logo, CM/L No.7700179516 & Batch Accepted 14. Numbers as Year-Month-Date-Mc No-Shift in White Color Stenciling. Manufacturers Internal Type Test Reports Reviewed for Tensile Strength for Butt Fusion, Overall Migration Test, Hydrostatic Pressure Test on Pipe Pieces (48 Hrs. at 80°C, 100 Firs at 270C, 165 Hrs. at 80°C & 1000Hrs. at 80°C), Electro Fusion Joint of Pipes for 40 Hrs. at 80°C & Slow Crack Growth Rate Test (500 Hs. at 80°C) -- found in Order as Per Clause No, 8.6, 8.8, 8.1.1, 8.10 & IS4984:2016 Table 7 Requirements, Accepted 15. Salisfactory Resulls for Offered Pipes/Colls as Per IS 4984 al the Place & Time of Inspection, However Advised to Supplier for Cleaning & Safe Handling yf Pipes/Colls During Transportation, Noted SGS SGS In Pvt. Ltd. ‘Number of Photographs taken: Confirm Instruments used are in working condition & suitable for intended purpose: YES /NO- Verified the Qualification, Training & Experience of the person performing the test before witness: YES JNO InstrumentName | Range of | Calibration | Calibration ] Calibrated _| Calibration & Identification No. | calibration | date due date | By Traceable to (suitability) National / International standard Calibration status report attached. Verified the Calibration Certificates of above mentioned Instruments also for Accuracy, Uncertainty & % Error before allowing / using it for test / inspection and found suitable : YES DISCLAIMER: Incase test certificates of bought out items/raw materials are not from acoredited laboratory, SGS responsiblity is limited to verify the test results against the requirement and not to assess the accuracy / sullablliy of results specified in the test report. Inspection Identification | Location of (Actual Impression) identification ‘Name and signature of SGS Yellow sticker Double on sample and Single rest as Inside Dia. of the pipes. Helal Siddiqui Drip India Irigation Pvt Ltd ‘This document does not have any Legal or Commercial value and hence cannot used for any commercial and legal purposes. ‘This is just a site report applicable at the time, date and place of inspection. 1 Negotiable Document as agreed shall be obtained from SGS Office Debriefing & Vetting Status: (vetting authority to confirm status from a,b,¢,d,e) Refer Hold Roints/Remarks. b. Released for next stage c. Satisfactory - IRN/Report/Certificate can be issued d. Abortive-visit a onal-claarance-of stage subject to- client a Name of Vetting authority, Time: (SM Doddamani, 08.11.2023, 19.00 Hrs.) \VF-IN-I&E-IN-012 / Ver 2.6 /20-01-2023/ Page 4 of 4

You might also like