You are on page 1of 3
LEENA POWERTECH ENGINE! IVATE LIMITED CBO Ralanr Naa WrbatlD 618 Connecting People and Power 8+ E mal rfo(tctndia n+ wwe etna in AMATATON Ref No: LPTENCRMP-Alihag/20-21/ 15 6 Date: \t)iz}oo2= To, The Senior Electrical Engineer ( TPQA) TUV-SUD Flat No- 102, F- wing, Bay Blue CHS Near Home guard office, Varsoli, Alibag 402201 NCRMP-IT 1ag- Requesting to close NCR-69 1. IN-RRD-MAH-2620-CW-RFB_(NCRMP ALIBAG) 2. LOA DMU-2017/CR-169/DM-I dtd 13.06.2019 3. NCR No. TSSA/ELECTRICAL/ALIBAG/069 dtd 19.11.2020 Respected Sir, Vide reference no.3 TPQA raised NCR against following Points NCR - LPTE had not sealed LT UG cable with capping by plastic half glass at Nava Alibag DTC Compliance- on did 19.11.2020 and not done proper dressing. On dtd 02.12.2020 LPTE had sealed LT UG Cable, Kindly close the NCR against the same. Enclose as above:- ‘Thanking You, Assuring our best services all the times. Yours Faithfully For Leena Powertech Engineers Pvt. Ltd. jovised Signatory Scanned with CamScanner South asia ICH Wins TEER / ELECTRICAL J ALIBAG /-—009-— Oate: 19/11/2020 Wome of Work T Convencion of Erieting 22€V and UT Power Distribution Metwrorte with | Underground Power Cable Network and Construction of 22 KV Switching | | Station wt Alibaug Town on Turnkey Basit Under NCRMP-M Maharashtra | Gent | ations Cyclone Risk Mitigation Project NCRMP-IT | Gonraior [Urns Rewer Fok tine meen Inspection Location | Newa Alibag Date: 19/11/2020 Non-Conformity Report [Type of Non-Conformity: ] | 1- Contractor had not sealed LT UG cable with capping by plastic half glass at Nawa Alibag and not done | proper dressing. pe fenton (V5 Kuldeep Kumar Senior Electrical Engineer Contractor pnt emote lient Tuy suD Date: e039: Elecsce Date: Date :19/11/2020 [212020 Requirement as per Approved QAP /Drawing: 1- Contractor should be provided cable seal for cable safety. Senior Electrical Engineer Contractor Client Tuy SUD Date: trite scm Date: Date :19/11/2020 el. 4 eutcen fe ‘Action Taken by Contractor: LPTE had provided cable seal for cable safety. Pe ea Kuldeep Kumar emit ented Senior Electrical Engineer Contractor sii Cog.aeteeres Client Tuv SsuD Date: 9f-12-20: HegEN nan Date: Scanned with CamScanner Scanned with CamScanner

You might also like