LEENA POWERTECH ENGINE! IVATE LIMITED
CBO Ralanr Naa WrbatlD 618
Connecting People and Power 8+ E mal rfo(tctndia n+ wwe etna in
AMATATON
Ref No: LPTENCRMP-Alihag/20-21/ 15 6 Date: \t)iz}oo2=
To,
The Senior Electrical Engineer ( TPQA)
TUV-SUD
Flat No- 102, F- wing, Bay Blue CHS
Near Home guard office, Varsoli, Alibag
402201
NCRMP-IT
1ag- Requesting to close NCR-69
1. IN-RRD-MAH-2620-CW-RFB_(NCRMP ALIBAG)
2. LOA DMU-2017/CR-169/DM-I dtd 13.06.2019
3. NCR No. TSSA/ELECTRICAL/ALIBAG/069 dtd 19.11.2020
Respected Sir,
Vide reference no.3 TPQA raised NCR against following Points
NCR - LPTE had not sealed LT UG cable with capping by plastic half glass at Nava Alibag DTC
Compliance- on did 19.11.2020 and not done proper dressing. On dtd 02.12.2020 LPTE had
sealed LT UG Cable,
Kindly close the NCR against the same.
Enclose as above:-
‘Thanking You,
Assuring our best services all the times.
Yours Faithfully
For Leena Powertech Engineers Pvt. Ltd.
jovised Signatory
Scanned with CamScannerSouth asia
ICH Wins TEER / ELECTRICAL J ALIBAG /-—009-— Oate: 19/11/2020
Wome of Work T Convencion of Erieting 22€V and UT Power Distribution Metwrorte with
| Underground Power Cable Network and Construction of 22 KV Switching
| | Station wt Alibaug Town on Turnkey Basit Under NCRMP-M Maharashtra
| Gent | ations Cyclone Risk Mitigation Project NCRMP-IT
| Gonraior [Urns Rewer Fok tine
meen
Inspection Location | Newa Alibag Date:
19/11/2020
Non-Conformity Report
[Type of Non-Conformity: ]
| 1- Contractor had not sealed LT UG cable with capping by plastic half glass at Nawa Alibag and not done |
proper dressing.
pe
fenton (V5
Kuldeep Kumar
Senior Electrical Engineer
Contractor pnt emote lient Tuy suD
Date: e039: Elecsce Date: Date :19/11/2020
[212020
Requirement as per Approved QAP /Drawing:
1- Contractor should be provided cable seal for cable safety.
Senior Electrical Engineer
Contractor Client Tuy SUD
Date: trite scm Date: Date :19/11/2020
el.
4 eutcen fe
‘Action Taken by Contractor:
LPTE had provided cable seal for cable safety.
Pe ea
Kuldeep Kumar
emit ented Senior Electrical Engineer
Contractor sii Cog.aeteeres Client Tuv SsuD
Date: 9f-12-20: HegEN nan Date:
Scanned with CamScannerScanned with CamScanner