Professional Documents
Culture Documents
1. Part List
FRU
Name Part Number Part Name Qty.
Number
3102-20-69178 probe wipe (6 month) 2EA
BC-5300 3001-20-07263 washer for front bath (6 month) 4EA
801-3101- Preventive 3001-20-18695 washer for rear bath (6 month) 4EA
00062-00 Maintenanc
3001-10-07054 Air Filter (6 month) 10EA
e Kit
082-000027-00 filter assembly (12 month) 1EA
115-002439-00 isolation chamber (contain filter) (12 month) 3EA
2. Part Replacement
2.1.2 Preparation
2. Turn off the main power switch on the right side of the analyzer and unplug the
power cord;
b) Pull the wipe downward to remove the probe wipe, as indicated by the arrow
d) Get out the inlet and outlet pipe from the wipe。
2、Installation
Repeat the above “removal” step in the reverse order。
2.2.2 Preparation
1、Power on the analyzer to empty the fluidic system. Power off the analyzer and
2、Remove the left and right doors ,and the top cover;
3、Remove the two screws on the top cover of data board shielding box, and then
4、Disconnect the bath signal lines of the WBC reaction bath or RBC reaction bath
that needs to be removed, and then loosen all buckles fastening the lines in the direction
of wiring ,until the wire is drawn to the bath.
5、Remove the screw on bath shield and take it out, then remove the shield.(Figure
3)
6、Remove the two screws on bath presser and take it out, then remove the bath
(Figure 3)
presser;
7、Pull the bath out with a distance of about 50-80 mm. Disconnect all tubes
connected to the bath. Get the signal wire from wire-protective ring and then remove the
bath assembly.
Figure 2 Removing signal lines of bath
2.2.3 Replacement
Separate the front bath from the rear and replace the washers . The concave side of
In case that volumetric tube could not drain ,replace air filter every 6 months.
2.3.2 Preparation
2.3.3 Replacement
In case of clog of probe wipe and P2 waste pump ,replace filter assembly every 12
months.
2.4.2 Preparation
2.4.3 Replacement
1、Separate the wipe from filter assembly in the direction of arrow(Figure 6);
In case that the bath could not drain or clog of P2 waste pump ,replace the isolation
chamber every 12 months.
2.5.2 Preparation
1、Power on the analyzer to empty the fluidic system. Power off the analyzer;
(Figure 7)
3、Position revolves DIFF bath、WBC bath and RBC bath。
Figure 7 Positions Of the Isolation Chambers
2.5.3 Replacement
;
2、Disconnect all pipes connected to the isolation chamber(Figure 8)