INSPECTION AND TEST PLAN REV : __________________

Project Name :

Project No :

Sub-Contractor :

Location :

Date : PAGE : 1 of 1

TRADE : BRICKWORK LEGEND o checked by


* confirmed by
# approved by

CONTRACTOR CONSULTANT
ITEM DESCRIPTION OF WORK STANDARD / REQUIREMENT SUB. SUPER- SITE ENG/ PROJ ARCH M&E R.E. S.O. RECORD
CON VISOR AGENT MGR COW COW

1. Position of brickwall a) Ensure brickwalls are erected as per o o * # Brickwork inspection form.
construction drawings.

2. Verticality of brickwall a) Brickwall are laid vertically and cornering o o * # Brickwork inspection form.
are vertical.

3. Openings and services at brickwall a) Ensure all doors and window frames are o o * # Brickwork inspection form.
installed as per drawings.
b) Ensure all M&E services and openings
are installed as per drawings.

4. Brick Joints a) Ensure the joints are properly packed o o * # Brickwork inspection form.
with cement mortar.

5. Unwanted materials a) All loose materials and foreign matters o o * # Brickwork inspection form.
on the erected brickwall to be removed.

6. Oil and grease a) Ensure oil spills or grease on the o o * # Brickwork inspection form.
brickwall are to be removed or cleaned.
BRICKWORK INSPECTION FORM

Project Name :

Project No :

Sub-Contractor :

Construction Drawing No :

Location :

Date : Revision:

Check List : Ref No.:

ACTION BY CONTRACTOR
INSPECTION
NO ITEMS Accept as Scrap Rework REMARKS
1st 2nd 3rd it is
1. As per construction drawings.
2. Verticality
3. Openings for others trades provided
4. Joints packed with cement mortar.
5. Debris to remove
6. Oil spills / grease to clean.

Approved by: ………………………………………..


(Project Manager)

Date:

** PLEASE ATTACH ADDITIONAL DOCUMENT(S) FOR FURTHER CLARIFICATION, IF NECESSARY

COMMENT:

CHECKED BY: CONFIRMED BY : APPROVED BY:

______________________ ____________________ ___________________


NAME : NAME : NAME :
DATE : DATE : DATE :