ITEM DESCRIPTION OF WORK STANDARD / REQUIREMENT Sub- Super- Proj. COW R.E. S.O. RECORD
Con visor Mgr
1 Setting out of brickwall a) Ensure setting out of brickwalls are as per the SIB/ICL/BWDF
construction drawings. @ @ o

2 Position of door frames a) Ensure door frames are erected at the correct location SIB/ICL/BWDF
@ @ o

b) Check the size of door frames used are of the correct


size and type (LHS / RHS)

c) Check the verticality and orientation for the erected


door frames

3 Position of brickwall a) Ensure brickwalls are erected correctly as per setting SIB/ICL/BWDF
out confirmed in item (1) @ @ o

4 Dampness a) Damp Proof Course to be provided prior to laying of @ @ o SIB/ICL/BWDF


brick

5 Verticality of brickwall a) Brickwall are laid vertically and cornerings are vertical @ @ o SIB/ICL/BWDF

6 Brickwall reinforcement & other a) Exmet to be provided every forth course of brick starting @ @ o SIB/ICL/BWDF
accessories from the second course

b) Fish tail & brick ties to be provided where necessary

7 Brick Joints a) Ensure all joints between bricks are properly filled with @ @ o SIB/ICL/BWDF
cement mortar.
SUN INTEGRATED BUILDERS SDN. BHD.
Document Ref. SIB/ITP/BWDF
INSPECTION AND TEST PLAN Revision No. 0
Effective Date 15-Sep-08
BRICKWORK & INSTALLATION OF DOOR FRAMES Page No. 2 of 2
8 Opening and services at a) Ensure all M&E services and openings are installed as per @ @ o SIB/ICL/BWDF
brickwall construction drawings.

b) Ensure all M&E pipings are covered with cement mortar


and leave no gaps between pipes / conduits and
brickwork

9 Unwanted materials a) All loose and foreign material are to be removed from @ @ o SIB/ICL/BWDF
the erected brickwall.

b) Erected brickwall must be free from oil spills and grease.

10 Construction Rubbish a) All construction rubbish / unused materials are to be @ @ o SIB/ICL/BWDF


removed to the designated location.

REMARKS PREPARED BY APPROVED BY