The document is a checklist for testing and commissioning fire hydrants that contains items to verify such as: materials used match approved submittals, installation drawings are current, isolation valves are open, water flow and pressure are checked using a flowmeter, and water clarity is inspected. Representatives from the sub-contractor, main contractor, and client must sign off on the checklist after completion.
The document is a checklist for testing and commissioning fire hydrants that contains items to verify such as: materials used match approved submittals, installation drawings are current, isolation valves are open, water flow and pressure are checked using a flowmeter, and water clarity is inspected. Representatives from the sub-contractor, main contractor, and client must sign off on the checklist after completion.
The document is a checklist for testing and commissioning fire hydrants that contains items to verify such as: materials used match approved submittals, installation drawings are current, isolation valves are open, water flow and pressure are checked using a flowmeter, and water clarity is inspected. Representatives from the sub-contractor, main contractor, and client must sign off on the checklist after completion.
1 Check all materials installed are as per approved material submittal. 2 Check the drawings used for installation are current and approved. 3 Check for the isolation valve of Fire Hydrant in Open position Open the hydrant valve fully and check the water flow and pressure by means of 4 Flowmeter.
5 Check for the water clarity.
Remarks (if any):
Sub-Contractor Representative Main Contractor Representative Consultant/Client Representative