dressing. 2 Material/Equipment The work done is according to approved material sample submitted. 3 Installation The work done according to approved construction/installation drawings attached.
Cable laying on tray / ladder is secured
properly with retaining cable ties.
All the cable terminations are properly done.
Manufacturer’s certificate of origin & factory
test report attached.
Labelling / marking of circuit / phase
identification as per specifications and CP5. Insulation resistance conducted with test record Cable continuity conducted with test record
Polarity of cable conducted with test record.
Checked By: Inspected by:
Name: Name: Signature: Signature: Date : Date: Witnessed By: Name : Signature : Date: