You are on page 1of 6

INSPECTION INFORMATION

P.O. number:
Materials Inspected:
Date(s) of visit(s):
Date of previous visit:
Date of next scheduled visit:
P.O. Status Complete Incomplete

SUPPLIER / SUBSUPPLIER DATA


Supplier:
Location:
Primary contact:
Phone:
E-mail:

1. ATTENDEES

NAME COMPANY REPRESENTED TITLE

2. MATERIAL INSPECTED (Based on the Final Release of Spools)

PRODUCT/ PRESENT ACCEP


ORDERED
MATERIAL/ITEM DESCRIPTION ED ACCEPTED TED
QUANTIT
NAME/SPOOL QUANTIT THIS VISIT TO
Y
NUMBER Y DATE

3. DOCUMENTS USED

APPROVAL
DOCUMENT Nº TITLE ISSUE DATE (Rev.)
STATUS

Report’s date: 25/03/2023


4. SCOPE OF INSPECTION

Activity Offered Items /Qty Serial Intervention as per


/Tag Heat Nos. ITP / Result

Report’s date: 25/03/2023


12.3 Marking and Stenciling Inspection for the As mentioned Above W Satisfactory
Cladded Spools Verified
12.4 Prepared and issued Final Inspection As mentioned Above H
Release Note. Satisfactory

Activity Offered Items /Qty Serial / Intervention as per


Tag Heat Nos. ITP / Result

4.1 Receiving Inspection of Flanges. W Satisfactory


All Incoming Material Verified against P.O ASTM A707 L3 CL3
and Applicable Material Standards for
Quality, Damages /Dents and Certification
MTC Review.

Physical, dimensional & Marking


verification was performed and found
satisfactory. MTC reviewed and found in
Compliance with the Approved GAD
5.1.4 Monitored Weld Overlay of Flanges Flange W/M
Satisfactory
Verified Pre-Clad thickness of Base material
3

Report’s date: 25/03/2023


of Flanges, at each orientation and
found as per requirements.

Verified Welding Equipment’s calibration


status and found all Machined were duly
calibrated
and within due date.

Verified Inconel 625 Filler wire spool used


is of Same Batch & Brand mentioned in
WPS.

Verified Pre-heat prior to cladding and found


as per approved WPS requirement.

During startup of cladding verified all weld


Parameters, Gas Flow rate and found
meeting with WPS requirements.

5. MANUFACTURING

Manufacturing Start Scheduled


Manufacturing Progress Comments
Dates
Item Nº
End Scheduled
Start Actual Actual (%)
(contractual) (%)
Pipes,
Clad
NA As Per PO - N/A N/A N/A
Spools &
Fittings
Remarks:

6. DELIVERY DATE

Item Nº Delivery Date Comments (inspector opinion about viability of delivery dates)
Pipes,
Spools &
Fittings
Remarks:

7. INSPECTION DETAILS AND CONCLUSION

Calibration of measuring devices was verified and found the calibration date is still valid.

Testing Instrument Calibration Records

Report’s date: 25/03/2023


 Material Receiving Inspection

 Receiving Inspection done as per ITP points mentioned as per PO, Codes &
Standard requirements.
 Reviewed Material Test Certificates and found all Required Chemical,
Mechanical & NDT were meeting with Codes & Standard requirements.
 Visual Inspection performed on all offered quantity for physical condition and
found free from mechanical damages.
 Verified Marking and found correlating with MTC & Code marking
requirement.
 Dimensions verified for all Items offered Overall length, OD, ID & Bevel Edges
and found as per required dimensions and found within tolerance limits
 Verified Wall Thickness by UT thickness Gauge and found within tolerance
limits.

 Visual and Dimensional Control of Pipes, Spools & Fittings

 Performed and witnessed dimensional inspection for the, Spools & Fittings.
Results found satisfactory and accepted.
 Initial Witness of weld Overlay of Pipes, Flanges & Fittings Witnessed as per
Approved Procedures & Welding Documents and found in order, hence
accepted the Initial witness to proceed with weld overlay process.
 Visual inspection was performed on the Pipes, Spools & Fittings are free from
voids, Pits, Foreign inclusions, Scratch’s, worm hole and wrinkles. Results found
satisfactory and accepted.

 Final Inspection Activities and Review of Documents


 Witnessing of Dimensional Inspection and Marking inspection was done for Spools
& Fittings which were ready for inspection and shipping.

RECOMMENDED ACTION:
Accept Non-
INSPECTION RESULT:
conformance Other

8. NON-CONFORMANCES

NCR # DESCRIPTION DATE RISED DATE CLOSED


None
9. ATTACHMENTS TO THIS REPORT

Report’s date: 25/03/2023


S No Description Number of pages
1
2
10. PICTURES

Report’s date: 25/03/2023

You might also like