1.0 Purpose: To provide a guideline to the inspectors for inspection of Pressure Vessels / Proprietary Pressure
Equipment / Parts.
2.0 Scope: Inspection of Pressure Vessels / Proprietary Pressure Equipment / Parts, designed in accordance
with ASME Section VIII Division I & II, PD 5500, IS 2825 & additional requirements applicable from
approved ITP / Drawing / Project Spec. / Mfrs. Procedures / PO.
A) Document review:
1) Verify the approval of Latest revision of Drawing with Date. Ensure that the required details of
parts are clear & essential data like, Design / Test Pressure, External pressure, Load, Fillet size,
FPW requirement, Design Temperature (Minimum & Maximum), PWHT / Heat Treatment,
Hardness (Base metal & Weld), Impact Testing, PTC requirement, Corrosion Testing requirement,
Code requirements, Tolerances are mentioned clearly in the Drawing. Be vigilant for any missing
essential data. In the event of any missing essential data get it incorporated in the Drawing by the
vendor, and a re-approval from the Buyer / End User / DEC shall be obtained.
2) Try to understand the function & criticality of the equipment & each part including Non-Pressure
part,
3) Verify approval of QAP/ITP. QAP/ITP shall be approved by client, PMC & TUV.
4) Verify approval of applicable WPS/PQR/WPQ & weld plan by client, PMC & TUV.
5) Verify availability of NDE, PWHT & other test procedures, duly approved by Client, PMC & TUV.
6) Verification of availability of approved drawings & approval code.
B) Pre-Inspection Meeting:
This Document shall not be reproduced in part or full, without the written consent of TUV India Pvt. Ltd. 2
WI/INSP/01/02 INSPECTION SERVICES
Effective date: Oct 2004 WORK INSTRUCTION – INSPECTION OF
INDIA
Page 3 of 8
PRESSURE VESSEL / PROPRIETARY PRESSURE TUV NORD GROUP
EQUIPMENT / PARTS
1) Discuss with Buyer / End user / DEC / Manufacturer to understand the Project specific
requirements, Drawing / Specification & QAP / ITP requirements & to suggest Justifiable
improvements in the inspection requirements & TPI Scope based on previous experience.
2) Discuss with Buyer / End user / DEC / Manufacturer to understand the function & criticality of
the equipment & each part including Non-Pressure part, especially for proprietary equipment.
3) Ensure addition of specific test / Inspection for the function & criticality identified.
4) Ensure preparation of test procedures for special / different items which ensure testing of the
full strength of all load bearing parts & Chambers at 1.3 / 1.5 / 1.43 times the Design Load /
Pressure.
Note: Without MTC (original or copy) material shall not be identified by the inspector.
In the absence of original MTC or lack of correlation between marking on material & MTC,
coupons shall be stamped for check testing as per the material specification & additional tests
required by client specifications. Client concurrence shall be obtained before stamping of
material for check testing.
If the material is found satisfactory based on MTC review and/or check test results, stamp
transfer shall be carried out.
Verify the transfer of correct details before transferring the TUV stamp. For Low alloy steel &
Low temperature carbon steel parts ensure that low stress stamps are used for identification
& stamp transfer for all markings as well as TUV Stamp.
In process inspection:
This Document shall not be reproduced in part or full, without the written consent of TUV India Pvt. Ltd. 3
WI/INSP/01/02 INSPECTION SERVICES
Effective date: Oct 2004 WORK INSTRUCTION – INSPECTION OF
INDIA
Page 4 of 8
PRESSURE VESSEL / PROPRIETARY PRESSURE TUV NORD GROUP
EQUIPMENT / PARTS
This Document shall not be reproduced in part or full, without the written consent of TUV India Pvt. Ltd. 4
WI/INSP/01/02 INSPECTION SERVICES
Effective date: Oct 2004 WORK INSTRUCTION – INSPECTION OF
INDIA
Page 5 of 8
PRESSURE VESSEL / PROPRIETARY PRESSURE TUV NORD GROUP
EQUIPMENT / PARTS
Verify completion of heat treatment (if applicable) including simulation heat treatment &
testing of the coupon.
No grinding shall be permitted on the internal surface of Clad Heads as it may reduce the
cladding thickness
10) Back chip Dye penetrant test of long seams, C/Seams & nozzle to shell/head joints shall be
witnessed or report shall be reviewed as specified in the approved ITP.
pressure parts, weld undercuts, etc. Nozzle neck inside the vessel shall be rounded to 3 mm
radius minimum. Pipe to flange joints shall be flush ground from inside. Ensure Temporary
cleats removed areas on Pressure parts are thoroughly attended by means of filling, grinding,
necessary NDE carried out.
Flatness of bolting bars to be verified after welding as they tend to bend during welding
Ensure that all Non Conformities and concession requests have been satisfactorily closed
before releasing the equipment for PWHT or Hydro Test.
13) Dimension check – Verify location and orientation of all nozzles, piping cleats, insulation cleats,
supports (Lugs, Saddles, Legs), Lifting lugs, TSR, Bolting bars etc., completeness of the equipment
with reference to availability of all items welded to the equipment & as built dimensions before
releasing for PWHT or hydro test. Ensure that only calibrated instruments are used for
measurements. Check the skirt support Anchor Chair dimensions as per the template (Normally,
all customers insist for templates for skirt type supports of Columns and tall vessels before
commencement of fabrication and this template is used during fixing of Foundation bolts at site
one ring template is retained at manufacturer place for verification on the column / vessel)
14) Internals: Verify completeness & trial assembly of internals with equipment. For columns ensure
full welding of TSR to shell joint from top side is completed.
This Document shall not be reproduced in part or full, without the written consent of TUV India Pvt. Ltd. 6
WI/INSP/01/02 INSPECTION SERVICES
Effective date: Oct 2004 WORK INSTRUCTION – INSPECTION OF
INDIA
Page 7 of 8
PRESSURE VESSEL / PROPRIETARY PRESSURE TUV NORD GROUP
EQUIPMENT / PARTS
Verify that the pressure gauge range is not less than 1.5 times or more than 4 times the test
pressure (UG-102). Verify that the pressure gauge needle returns to zero after release of
pressure.
Ensure that the pressure gauge are provided at top most point of the equipment at its test
position.
Verify the calibration of test gauges & recording equipment.
Verify test medium reports w.r.t chloride content for conformity to PO specification.
Verify pressure gauge position, calibration status & quantity.
Verify the temperature of the test medium & ambient temperature.
Verify the position of equipment (vertical or horizontal) & ensure correction of pressure
considering the head, in case it is in horizontal position.
Ensure that all weld joints & flange joints free of paint, grease, oil, dust.
Ensure that service gaskets & fasteners have been used on flange joints with original blinds or
covers.
Review any special caution exercised: differential pressure designed vessel, jacketed vessel,
lined vessel.
Hold the equipment under specified pressure as per approved Drawing for the required
duration & check for any leakages or pressure drop. All welds, flange joints & connections
shall be inspected with the help of sufficient light. The hydro test pressure shall not exceed
the test pressure.
At the end of the hydro test ensure that the pressure is released gradually from the topmost
connection.
Report shall be made in the prescribed format. Report shall contain equipment name & tag
no, the start & end time of test, pressure gauge identification no & calibration status, holding
time, position of vessel (vertical or horizontal).
Witness/review NDE post hydro test as specified.
18) Painting:
Verify availability of approved painting procedure.
Review painting report. Ensure details such as ambient conditions, substrate temperature,
surface profile after blasting, start time & primer application time are mentioned on the
report. Review the paint certificates w.r.t approved specification (type of Paint, Paint material)
etc..
Verify that the hydro test water has been drained completely from vessel & the equipment is
thoroughly dried.
Check DFT, with a calibrated DFT measuring instrument, at random locations including
underside of the equipment, supports, non-pressure parts. Inspection of painting shall be
done after complete drying of final coat.
Verify application of protective cover on nozzles & providing packing/blanking for gasket
seating areas.
Ensure that the painted surface is free from unacceptable pinhole defects, paint sagging, peel
off & excessive coating. Carryout peel test (Adhesion test) when required by the approved ITP
This Document shall not be reproduced in part or full, without the written consent of TUV India Pvt. Ltd. 7
WI/INSP/01/02 INSPECTION SERVICES
Effective date: Oct 2004 WORK INSTRUCTION – INSPECTION OF
INDIA
Page 8 of 8
PRESSURE VESSEL / PROPRIETARY PRESSURE TUV NORD GROUP
EQUIPMENT / PARTS
Verify Nitrogen (N2) filling by verification of provision of Pressure gauge, NRV etc., Check the
PG+NRV assembly by soap solution to check leakages. VCI filling (volatile corrosion inhibitors)
if required by project specification. Endorse the N2 filling report with above details supported
by photos. Check for provision of Silicagel when required by the project specification.