CHECK LIST FOR CABLE LAYING AND TERMINATION (CBS).

Contractor :
Consultant Rev No. : 00
Sub-Contractor : Page: 1 of 1

Section of Work :
Location :
Drawing No :

Checked by Checked by
Stage Item Date
sub. Cont. Cont. Consultant
Check all the cables, termination accessories make, and type are as
1
per the project approved material submittal and free from damages.
Check cable routing and sleeves for the wall crossing are as per the
2
approved shop drawings

Check the cable size and types are asper the approved Material
3
submittal.
Check cable laid in the cable trays, above false ceiling and cabinets
4 are dressed properly and it is secured with cable tray using suitable
cable ties.
Check cables laid above the false ceiling area are supported
5
properly.

Check cable cleats are provided for the suface running at the interval
6
of every 500mm. Where ever it is required
Termination of all the cables are done properly using suitable
7
ferruels

8 Check the continuity test and meggering of the cables.

Check the tags and identification marks are provided in all the cables
9
and terminals (Temp/ Permenant) for future ref and safety purpose.

Check area is clean and safe after completion of the cable


10
installation work
MEP Contractor Main Contractor Consultant
Date: Date: Date:

Name: Name: Name:

Sign: Sign: Sign: