You are on page 1of 1

Alwasead ALaqariya Company

Projects Management
Checklist &Inspection Record 07-005-04

Inspection and acceptance of foundations and tie beams rebar works


Project Name: Item Number in Bill of Quantity

Contractor Name: Commencement Date of Activities to be Inspected: / /

Cost center No. Inspection Date: / /

Work Order No. Drawing No.

Activities to be Inspected:

Conditio-
S.N Un-
Items Accepted nally Remarks
accepted
accepted

1 Check the rebar is clean and there is no rust.

Check type, numbers and length of rebar and its shaping


2
and placing are according to the shop drawings.

Check the locations of columns starter bars and stirrups


3
are properly fixed to start bars.

Check type, numbers and length of starter bars are


4
according to the shop drawings.

5 Check the rebar are well tied together.

Installation of chairs for foundations top rebar according


6
to shop drawings.

Check that plastic spacers are installed between the


7
foundations sides and the rebar.

8 Check any buried piping works before casting.

Check those legs of columns starter bars are not less


9
than 40 cm from column face.

Site Engineer Approval Contractor Approval Quality Control Approval

Name: Name: Name:

Signature: Signature: Signature:

Date: Date: Date: