CHECKLIST FOR ANTI TERMITE

Project Rajyash Regius


Client Rajyash Procon LLP
PMC JLL
Contractor Ramya Projects
RFI No: Date of
Inspection:

Ref.Drg.No. Axis/ Grid:

Location:
S.No. Description of Activity YES NO Remarks

1 Specialised agency and method statement is approved by


the Consultant.
2 Material is as per Indian standard / specifications.
3 Previous activity / excavation are inspected and ready to
receive PCC.

4 HSE rules/ regulations are followed and following are


available on site.
4.1 Protective gloves
4.2 Gas-masks
4.3 Safety goggles
4.4 Helmets
4.5 Safety shoes
5 Local weather condition is favourable to carry out anti-
termite treatment i.e. no rain or probability of raining during
anti-termite treatment.
6 Ensured that foundations / Pits are dry and there is no sub-
soil water.
7 Check- drills / holes formed are as per approved method
statement and specification.
8 Dosages are prepared as per approved method statement
and conforming to relevant standards / specifications.

Corrective action, if any:

Approved With
Approved Not Approved
Comments

Contractor JLL Client


Name: Name: Name:
Sign: Sign: Sign:
Date: Date: Date: