You are on page 1of 1

PIRAMAL SCHOOL OF EDUCATION LEADERSHIP PROJECT

ACTIVITY CHECKLIST : ANTI-TERMITE


Project Format No PSL/Cheklist/000

Client Piramal School of Education Leadership Date:

PMC --- Report/WIR no.

Contractor Drawing no.

Location

Sr. No. Description Yes No. Remarks

1 Has the area been levelled, rammed & well compacted?

2 Is the area free from wooden pieces, tree roots etc.?

3 Check for chemical specs, manufacturing date etc.

4 Check for the chemical mixing ratio and method of application?

5 Check for uniform spray of the chemical through out the area.

Is the dosage of chemical on horizontal and vertical surfaces - 5 liter/m2 or as


6
specified in technical data sheet?

Has the chemical been poured along the perimeter of the building at specified
7
intervals and depth?

Has it been ensured that the treated area is protected by carrying out the
8
relevant works ?

9 Check for any disturbed soil after application if any, extra coat shall be applied.

Has it been ensured that the treated area is not exposed to atmosphere for a
10
long duration?

11 Check for casting time after application of ATT.

Comments, If any :
PSL Representative Contractor Representative

Name : Name :

Sign : Sign :

Date : Date :