5 Check for uniform spray of the chemical through out the area.
Has the chemical been poured along the perimeter of the building at specified
7
intervals and depth?
Has it been ensured that the treated area is protected by carrying out the
8
relevant works ?
9 Check for any disturbed soil after application if any, extra coat shall be applied.
Has it been ensured that the treated area is not exposed to atmosphere for a
10
long duration?
Comments, If any :
PSL Representative Contractor Representative
Name : Name :
Sign : Sign :
Date : Date :