FORMATS Rev No.:
WATER PROOFING ‐ TOILET Rev Date:
Page No. ‐ 1 ‐ of
Name of Project Location Date
Name of Contractor: ‐
OBSERVATIONS
SR.NO PARAMETER
Yes No NA
A Floor Area
1 Cleaning of Surface
2 Treatment of Construction Joints, Cracks,Honeycombs etc
3 Provision of Wattas at Floor & Wall Junction : CM ‐ 1:3 with
coarse aggregates.
4 Application of Cementitious Waterproof Coating to wall & floor
5 Application of Waterproof Screed
a Check Thickness : 25 MM Thk
b Check Mortar Proportion : 1:3
c Check Admixture Proportion ‐ Kg / Bag of Cement
d Curing for 3 days
B Dado Area
1 Cleaning the Surface
2 Application of Plaster
a Check Thickness : 12 ‐ 18 MM Thk
b Check Mortar Proportion : 1:4
c Check Admixture Proportion ‐ Kg / Bag of Cement
d Check Height of Plaster ‐ 1.00M from FFL
e Check Curing
C Brick Bat Filling
1 Laying of Padding Coat ‐ 10mm thk ‐ 1:4
2 Laying of Brickbats as per reqd slope in CM ‐ 1:4 with W/P Comp.
3 Application of 10 mm thk Waterproof Screed topping ‐ 1:4
4 Check Curing
SAFETY CHECKS
1 Ensure and check MSDS for the water proofing material is obtained.
Check the store personnel, employees handling this material are briefed the safety
2
requirements as per the MSDS.
3 Check that the material is stored at a designated place for prevention from fire hazard etc.
Check if the material is a flammable one. So smoking or any other hot work is prohibited while
4
handling, using or at the proximity of the material.
Check that the Employees using the water proofing material shall wear rubber hand gloves,
5
goggles/ face shield, Safety helmet and shoes.
Check that the Employees handling the material shall be dressed covering them fully, to
6
prevent the accident fall of the chemical on them.
Check and ensure Employees are informed the wash places to wash off the chemical fallen on
7
them.
Check If the water proofing work is done in a confined area the required ventilation is
8
ensured.
Any Comments
Contractor Engineer Engineer Beacon Associates
Sign
Name
Date