Sobha Glazing and Metal Works Pvt. Ltd.

CHECKLIST FOR ON-SITE INSPECTION


ACTIVITY: STRUCTURAL GLAZING & ACP CLADDING

Project: Date:

Location:

NOTE:- Please appropriate box or enter readings as per requirements


Sl. No. To be checked YES NO NA Remarks/ Clarifications
Structural Glazing
1. Frame Work
Name,date and number of the
1.1
drawings
Are the latest "Good for
1.2 [ ] [ ] [ ]
Construction" drawings available?
Is the site ready with all civil
openings duly plastered and
1.3 [ ] [ ] [ ]
painted before starting the frame
work?
Is the adequate quantity of
1.4 [ ] [ ] [ ]
materials available at site?
Have safety measures required
1.5 for the frame work been taken [ ] [ ] [ ]
care?
1.6 Are the required tools available? [ ] [ ] [ ]

Have the frame work materials


1.7 viz. mullions, transoms etc. been [ ] [ ] [ ]
properly protected before use?
Have the MS brackects used to
1.8 anchor the mullions properly [ ] [ ] [ ]
been surface treated?
Have the specified anchor bolts
1.9 properly grouted to support the [ ] [ ] [ ]
mullions in RCC/PCC only?
Have PVC shims been used in
between MS bracket and mullion
1.10 [ ] [ ] [ ]
to avoid direct contact between
dissimilar materials?
Have the bolts been used to
connect the MS bracket and
1.11 [ ] [ ] [ ]
mullion are SS bolts and are the
same tightned properly?
1 of 4 03/19/2021
Sobha Glazing and Metal Works Pvt. Ltd.

Sl. No. To be checked YES NO NA Remarks/ Clarifications


Are all the mullions in true plumb
(in case of vertical glazing) or in
the same angle (in case of
1.12 [ ] [ ] [ ]
inclined glazing) and all the
tramsoms in the water level after
installation?

Have the required gaskets


properly been inserted in the
1.13 [ ] [ ] [ ]
mullions and transoms before the
installation of glazed panels?

Is the gap between masonry


opening and window/structural
1.14 glazing unit less than or equal to [ ] [ ] [ ]
10 mm (max.) after the frame
work?
2. Glazed Panel Installation
Is a proper register for bonding
of glass showing the date of
2.1 [ ] [ ] [ ]
bonding maintained in bonding
area?
Are the glass and glass
2.2 processing in complience with the [ ] [ ] [ ]
specification?
Is the processed glass free from
2.3 [ ] [ ] [ ]
all distortions?
Is the glass/ACP properly bonded
2.4 with structural silicone sealant to [ ] [ ] [ ]
the glass frame?
Is the silicone sealant bite as per
2.5 [ ] [ ] [ ]
the design requirement?
Is the silicone sealant properly
2.6 cured atleast for 7 days before [ ] [ ] [ ]
installation?
Has the bonded panel been
installed on the frame work with
glass clip and specified SS screws
2.7 [ ] [ ] [ ]
mainting a uniform gap of
12(min.)-15(max.) mm between
the glazed panels?

2 of 4 03/19/2021
Sobha Glazing and Metal Works Pvt. Ltd.

Sl. No. To be checked YES NO NA Remarks/ Clarifications


Has the sealant been applied in
the gap between the glazed
panels with uniform width
2.8 [ ] [ ] [ ]
horizontally & vertically by placing
suitable backer rod in the gap for
weather proofing?
Has the glass been cleaned with
proper cleaning tools and mild
2.9 soap solution with no dirts, [ ] [ ] [ ]
stains, scratches etc, on the
glass?
Has the flashing, if required been
2.10 [ ] [ ] [ ]
taken care after the glazing?

Has the gap between masonry


opening and window/structural
glazing unit been filled with the
2.11 [ ] [ ] [ ]
weather sealant backed by a
suitable backer rod for weather
proofing?

Aluminium Composite Panel (ACP) Cladding (Rout & Return Method)

Has the main-frame been


properly fixed to the main
structure by means of proper
3.1 anchor bolts (in case of [ ] [ ] [ ]
concrete/plastered surface) or
welding (in case of MS structure)
as per the design requirement?

Has the main-frame been


properly fixed to form the
3.2 [ ] [ ] [ ]
required grid as per the
requirement?
Is the ACP well protected with
3.3 manufacturer supplied original [ ] [ ] [ ]
protection sheet?
Has the plane of ACP cladding
3.4 [ ] [ ] [ ]
been maintained properly?
Has the gap between the
3.5 adjecent panels been maintained [ ] [ ] [ ]
10 mm(min.) - 12 mm(max.)?

3 of 4 03/19/2021
Sobha Glazing and Metal Works Pvt. Ltd.

Sl. No. To be checked YES NO NA Remarks/ Clarifications


Has the gap between the
adjecent panels been filled with
3.6 weather sealant backed on a [ ] [ ] [ ]
sutaible backer rod for weather
proofing?
Has the protection sheet been
3.7 removed after installation as [ ] [ ] [ ]
specified by the manufacturer?

Checked by: Approved by:

Name Name
Sign Sign
Date Date

4 of 4 03/19/2021