NOTE:- PleaseRappropriate box or enter readings as per requirements
Sl. No. ITEM YES NO NA Remarks Name,date and number of the 1 drawing PRE-EXECUTION CHECKS Has the area been prepared for 2 [ ] [ ] [ ] executing the work? Have proper electrical connections and working platform 3 [ ] [ ] [ ] available, in case of on-site fabrication Are the required tools and safety 4 equipments(scaffolding) [ ] [ ] [ ] available? CHECKS DURING EXECUTION Have all joints been welded from 5 both sides and excess weld [ ] [ ] [ ] ground? Has metal paste been applied to 6 [ ] [ ] [ ] all edges and corners? 7 Have all parts been sanded? [ ] [ ] [ ] Are rosettes in position before 8 [ ] [ ] [ ] fixing? Have all coats of metal primer 9 [ ] [ ] [ ] and paint been applied? POST-EXECUTION CHECKS Have all rosettes been fixed in 10 [ ] [ ] [ ] place using spot adhesive? Have all mortar spillage stuck to 11 [ ] [ ] [ ] MS works been cleared?