Sattva Group

CHECKLIST FOR ON-SITE INSPECTION

ACTIVITY:BRICKWORK
Project: Date:
Location:

NOTE:- PleaseRappropriate box or enter readings as per requirements


Sl. No. ITEM YES NO NA Remarks/ Clarifications
Name,date and number of the
1
drawing
PRE-EXECUTION CHECKS

Are the latest "Good for


2 [ ] [ ] [ ]
Construction" drawings available?
Are the required number of
3 blocks available? (both load [ ] [ ] [ ]
bearing and non-load bearing)
4 Surface preparation:
>Has the hacking at contact
surfaces of column & beam been [ ] [ ] [ ]
done?
>Has cement mortar slurry been
applied over the hacked surface [ ] [ ] [ ]
and cured for 3 days?
Have aluminium templates used
5 [ ] [ ] [ ]
for door/window openings?
6 Are the required tools available? [ ] [ ] [ ]

Are there any specific


7 [ ] [ ] [ ]
requirements of the client?
Cement - is it of the approved
8 [ ] [ ] [ ]
grade and less than 1 month old?

Sand - is it medium gritty, clean


9 [ ] [ ] [ ]
and silt-free (less than 5%)?

Is the finished floor level button


10 [ ] [ ] [ ]
marked on structural slab?
Are the markings for reference
11 [ ] [ ] [ ]
lines on pillars done?

1 of 3 12/22/2019
Sattva Group

Have the wall ties been cast into


12 columns at a vertical spacing [ ] [ ] [ ]
(<500mm)?

2 of 3 12/22/2019
Sattva Group

CHECKS DURING EXECUTION

Is the brickwork checked in


13 [ ] [ ] [ ]
vertical and horizontal directions?

Is the marker/ lowest course of


14 hollow blocks filled with concrete [ ] [ ] [ ]
1:3:6 (12mm jelly)?
Is the mortar in proportion 1:5 on
15 [ ] [ ] [ ]
MS sheet using farma box?
Has the check for diagonals &
16 [ ] [ ] [ ]
dimensions been done?
Has the thickness for joints been
17 [ ] [ ] [ ]
checked?
Has raking and pointing of joints
18 [ ] [ ] [ ]
been done?
Is the RCC band for 100mm walls
19 [ ] [ ] [ ]
done?
Has the procedure of not
20 constructing more than 5 courses [ ] [ ] [ ]
a day been followed?
Has the top course been packed
21 [ ] [ ] [ ]
below the concrete beam?
POST-EXECUTION CHECKS
Has the curing of brickwork done
22 [ ] [ ] [ ]
for atleast 7 days?
Has care been taken of not
23 [ ] [ ] [ ]
entertaining excessive chasing?
Has a nail been driven to test the
24 strength of joint after 7 days of [ ] [ ] [ ]
curing?

Checked by: Approved by:

Sign Sign
Name Name
Date Date