Trans Resources Corporation PROPOSED INTEGRATED MIXED-USE DEVELOPMENT (8MD3) IN PERCINT 8, PUTRAJAYA.
Sdn. Bhd.
Contract No. : MIX/COM/P8/8MD3/CONTRACTOR/2017-0088 8MD3
Check List For Cold Water Pipe Installation
COMMENTS :
Status Of Inspection
We have carried out all necessary inspections and verify that the above items / activities conform to the contract specifications / document.
Signature
Name
Company
Date
Doc. Ref. : TRC / PQP / 8MD3 / MECH01 Revision: 1 Effective Date: 1st April 2019
Main contractor : Project :
Trans Resources Corporation PROPOSED INTEGRATED MIXED-USE DEVELOPMENT (8MD3) IN PERCINT 8, PUTRAJAYA.
Sdn. Bhd.
Contract No. : MIX/COM/P8/8MD3/CONTRACTOR/2017-0088 8MD3
Check List For Water Storage Tank Installation
Client’s
Main Contractor
Consultant
Item Description Remarks
Acceptable Acceptable
Yes No Yes No
1 Approved brand / make material used
2 Tank capacity
3 Cat ladder installation
4 Access opening
5 Air vent
6 Level indicator
COMMENTS :
Status of Inspection
We have carried out all necessary inspections and verify that the above items / activities conform to the contract specifications / document.
Signature
Name
Company
Date
Doc. Ref. : TRC / PQP / 8MD3 / MECH02 Revision: 1 Effective Date: 1st April 2019
Main contractor : Project :
COMMENTS :
Status Of Inspection
We have carried out all necessary inspections and verify that the above items / activities conform to the contract specifications / document.
Signature
Name
Company
Date
Doc. Ref. : TRC / PQP / 8MD3 / MECH03 Revision: 1 Effective Date: 1st April 2019
Main contractor : Project :
Client’s
Main Contractor
Consultant
Item Description Remarks
Acceptable Acceptable
Yes No Yes No
1 Approved brand / material used
2 Pipe sleeve installed at correct location & settings
3 Check for proper pipe joints installation
4 Correct alignment & location as per approved shop drawing
5 Pipe gradient for soil waste pipe
COMMENTS :
Status Of Inspection
We have carried out all necessary inspections and verify that the above items / activities conform to the contract specifications / document.
Signature
Name
Company
Date
Doc. Ref. : TRC / PQP / 8MD3 / MECH05 Revision: 1 Effective Date: 1st April 2019
Main contractor : Project :
Client’s
Main Contractor
Consultant
Item Test Sequence Description Visual Checked Status Remarks
Acceptable Acceptable
Yes No Yes No
2 No leakage detected
10
11
12
13
14
15
16
COMMENTS :
Status Of Inspection
We have carried out all necessary inspections and verify that the above items / activities conform to the contract specifications / document.
Signature
Name
Company
Date
Doc. Ref. : TRC / PQP / 8MD3 / MECH07 Revision: 1 Effective Date: 1st April 2019