START

Site Preparation

Setting out alignment

Install Pipe Sleeve

Final Fittings

Cleaning

Hand Over

END

TRANS RESOURCES CORPORATION SDN BHD


METHOD STATEMENT FOR SWIMMING POOL
Document No. TRC-8MD3-PJH-CONSULTANT-TRADE-WMS-000XX
Revision No. XX Rev. Date XX MONTH XXXX

Appendix 5.2
Job Safety & Health Analysis (JSA)
METHOD STATEMENT TITLE

TRANS RESOURCES CORPORATION SDN BHD


METHOD STATEMENT FOR SWIMMING POOL
Document No. TRC-8MD3-PJH-CONSULTANT-TRADE-WMS-000XX
Revision No. XX Rev. Date XX MONTH XXXX

Appendix 5.3
Inspection & Test Plan (ITP)
METHOD STATEMENT TITLE

TRANS RESOURCES CORPORATION SDN BHD


METHOD STATEMENT FOR SWIMMING POOL
Document No. TRC-8MD3-PJH-CONSULTANT-TRADE-WMS-000XX
Revision No. XX Rev. Date XX MONTH XXXX

Appendix 5.4
Quality Control Site Inspection
Checklist
METHOD STATEMENT TITLE

TRANS RESOURCES CORPORATION SDN BHD