HEAT EXCHANGER TESTING AND COMMISSIONING CHECKLIST

Site Location Brand


Equipment No. Model / Serial No.

INITIAL TESTING FINAL TESTING


DATA
DESIGN INITIAL REMARKS FINAL REMARKS
1.0. Rated Heat Transfer Load Kw
2.0 Cooling Tower Side

2.1 Flow gpm


2.2 Entering Wet Valve Temp. °C
2.3 Leaving Wet Valve Temp. °C
3.0 Load Side
3.1 Flow gpm
3.2 Entering Wet Valve Temp. °C
3.3 Leaving Wet Valve Temp. °C
4.0 Rated Operating Pressure psig
5.0 Maximum Pressure Drop psig
6.0 Maximum Heat Transfer Surface sq.ft
7.0 Log Mean Temp Difference, LMTD °C
8.0 Port/Nozzle Size inch

9.0 Material:
9.1 Frame Plate

9.1 Plate

9.2 Port/Nozzle

9.3 Gaskets

9.4 Tightening Bolt

9.5 Guide Bar

9.6 Carrying Bar

DATE OF INITIAL TESTING REMARKS :


Company Name Representative PRC Number Signature
Contractor
PM/Gencon QA/QC

DATE OF FINAL TESTING


Note : Company Name Representative PRC Number Signature

If Consultant is not present, specify name & company Contractor


PM/Gencon QA/QC

Building Design Consultants

TG Project Manager Start-up Engineer TG Account Officer APMC - TG Representative


Rev.06