You are on page 1of 2

Page 1/2

Building : NORTH TOWER


Form No. : TG-F-06-04.1.1
Year : 2019

AIR COOLED CONDENSING UNIT (Direct Expansion) TESTING AND COMMISSIONING CHECKLIST

Site Location THE VERANDA, ARCA SOUTH, FTI, TAGUIG CITY Brand KOPPEL
Equipment No. B1-ACCU-04 Model / Serial No.

INITIAL TESTING FINAL TESTING


DATA DESIGN
INITIAL REMARKS FINAL REMARKS

1. Rated Compressor Power Kw

2. Phase

3. Ampere (FLA/Starting/Running)

L1 A

L2 A

L3 A

4. Voltage

L1-L2 V

L2-L3 V

L3-L1 V

5. Refrigerant Pipes

5.1 Refrigerant type

5.2 Pipe size, discharge inch

5.3 Pipe size, suction inch

5.4 Nitrogen test psig

5.5 Flushing /vacuum test (micro ohms)

5.6 Discharge pressure psig

5.7 Suction pressure psig

9. Pressure cut-in/ cut-out

9.1 Low pressure cut-in psig

9.2 Low pressure cut-out psig

9.3 High pressure cut-in psig

9.4 High pressure cut-out psig

DATE OF INITIAL TESTING REMARKS :

Company Name Representative PRC Number Signature

AEROMUNDO NIKKO INACAY


Contractor
D. MORAL/R.
DATEM/OPMC/MDC DOLFO/J. BATHAN &
PM/Gencon QA/QC F. BARIA

DATE OF FINAL TESTING

Company Name Representative PRC Number Signature

AEROMUNDO NIKKO INACAY


Note : Contractor
D. MORAL/R.
DATEM/OPMC/MDC DOLFO/J. BATHAN &
If Consultant is not present, specify name & company PM/Gencon QA/QC F. BARIA

Building Design Consultants


APMC L. DIGNADICE
TG Project Manager Start-up Engineer TG Account Officer APMC - TG Representative
Page 2/2

Building : NORTH TOWER


Form No. : TG-F-06-04.1.1
Year : 2019

AIR COOLED CONDENSING UNIT (Direct Expansion) TESTING AND COMMISSIONING CHECKLIST

Site Location THE VERANDA, ARCA SOUTH, FTI, TAGUIG CITY Brand KOPPEL
Equipment No. B1-ACCU-04 Model / Serial No.

INITIAL TESTING FINAL TESTING


DATA DESIGN
INITIAL REMARKS FINAL REMARKS

10. Liquid line sight glass

10.1 Green - dry

10.2 Yellow-wet

10.3 W/ bubbles -undercharge

10.4 Solid - correct charge

11. Condenser Data

11.1 Air capacity cfm

11.2 Condenser fan RPM rpm

11.3 Ampere (FLA/Starting/Running)

L1 A

L2 A

L3 A

11.4 Voltage

L1-L2 V

L2-L3 V

L3-L1 V

12. Overload current tripping device test

13. With or without abnormal noise

14. With or without abnormal vibration


15. Endurance testing (48 hours continous
running)

REMARKS :
DATE OF INITIAL TESTING
Company Name Representative PRC Number Signature

Contractor AEROMUNDO NIKKO INACAY


D. MORAL/R.
DATEM/OPMC/MDC DOLFO/J. BATHAN &
PM/Gencon QA/QC F. BARIA

DATE OF FINAL TESTING


Company Name Representative PRC Number Signature

Note : Contractor AEROMUNDO NIKKO INACAY


D. MORAL/R.
If Consultant is not present, specify name & company PM/Gencon QA/QC DATEM/OPMC/MDC DOLFO/J. BATHAN &
F. BARIA
Building Design Consultants

TG Project Manager Start-up Engineer TG Account Officer APMC - TG Representative APMC L. DIGNADICE
Rev. 05