Professional Documents
Culture Documents
Material Technical Submittal (MTS) NOL INSPECTION ASSIGNMENT PACKAGE (IAP) PO - Purchase Order MATERIAL STATUS IDR / FDR NCR
Fab Forecast
Item Manufacturer / Fab Start Scehdule Special
Description 9.COM Number Matl Insp. Level 3RD PARTY Inspection Pre/Final Vendor/ Delivery Progress In Delivery REMARKS :
No. Vendor Number Date Re Submitted Date Date Date INSPECTION IAP Date IAP Date P.O. Delivered Date Delivery Date Process SUBMITTED Open Close
MTS No. Inspector Assign Pkg Inspect'n Supplier/ PO Number Period Completed Balance % Date
Submitted Date Approved Submitted Approved AGENCY Submitted Resubmitted Date at Site DATE Date Date
Name (IAP) Y/N Meetings Mfr (Weeks)
AJM/SDHO-
Al-Fanar Cable
5 600V , 4x70 CU/XLPE/SWA/PVC 6000000804 0 Vendor ID# 10012569 FSD/SA/T/006 15/10/2018
4
6
600V , 4x185
CU/XLPE/SWA/PVC
13 16mm2 CU/PVC
14 35mm2 CU/PVC
15
HDG street lighting pole 6000001008 N/I
H=8M , single arm
16
HDG street lighting pole 6000001008 N/I
H=10M , single arm
17
HDG street lighting pole 6000001008 N/I
H=10M ,double arm
AL-BABTAIN LIGHTING
AND PANEL BOARD
HDG street lighting pole FACTORY
18 6000001008 N/I MFR I.D# 10012204
H=12M ,double arm AJM/SDHO-
OMEGA FACTORY FOR FSD/SA/T/007 17/10/208
LUMINAIRES & 0
19
HDG street lighting pole 6000001008 N/I GALVANIZING(Div.of
H=12M ,triple arm S. & A. Abahsain Co.
Ltd.) MFR I.D#
10011878
20
HDG street lighting pole 6000001008 N/I
H=16M ,double arm
21
HDG street lighting pole 6000001008 N/I
H=16M ,triple arm
24
LED luminaire 30W , 230V , 6000015912 N/I
60HZ
25
LED luminaire 70W , 230V , 6000015912 N/I
60HZ
LED flood light in upright
26 direction , 80W , 230V , 1- 6000015912 N/I
phase , 60HZ
27
LED luminaire 150W , 230V , 6000015912 N/I
60HZ Al-Babtain Power &
Telecom
Vendor ID#
100012204 AJM/SDHO-
28
LED luminaire 200W , 230V , 6000015912 N/I FSD/SA/T/005 10/10/2018
60HZ RAND Technology 1
Factory for Electronic
Industries
29
LED luminaire 250W , 230V , 6000015912 N/I Vendor ID# 10061396
60HZ
30
LED luminaire 300W , 230V , 6000015912 N/I
60HZ
32
LED luminaire 10W , 230V , 6000015912 N/I
60HZ
33
LED luminaire 80W , 230V , 6000015912 N/I
60HZ
38
100A KWHM box and breaker
including SEC fee
TRAFFIC SIGNAL
40 CCTV FACTORY, Dammam
MFR ID# 10028204
42 microwave sensor
43 control cables
53
Electrical valve pressure
control 25 mm dia
54
Electrical valve pressure
control 40 mm dia
55
Electrical valve pressure
control 50 mm dia
56
Electrical valve pressure
control 80 mm dia
57 DEODER
58 Y STRAINER DIA 25MM
72
Polyethylene Accessories AND
FITTING
73 bubblers
74 SPRAY SPRINKLER
75 ROTOR SPRINKLER
77
Decode control rirrigation
cable 14 AWG
78
IRRIGATION CONTROLLER
PANEL
83 PULL BOX
84 Anti Termite
85 Polyethylene Sheet
86 Lean Concrete
"REZAYAT
PROTECTIVE COATING
87 Reinforcement Concrete COMPANY LIMITED
Plant ID# 30000797"
88 Water Proofing Course
"GULF STEEL AJM/SDHO-
89 Steel Rebar 6000000615 N/I
INDUSTRIES
FSD/SA/T/006 10/15/2018 10/21/2018
0
COMPANY LIMITED
Plant ID# 30000507"
90 Finishing of Wall
91 Plaster
92
Paint
93
Render
94 Road Signs
6000010381 N/I
AJM/SDHO-
95 Gasket FSD/SA/T/005 10/15/2018
9
AJM/SDHO-
96 Bolt 6000000575 FSD/SA/T/005 10/15/2018
8
AJM/SDHO-
97 Fire Hydrant 6000001310 FSD/SA/T/007 10/18/2018
1
AJM/SDHO-
98 Irrigation Materials FSD/SA/T/005 10/10/2018
5
99 Plantation
Item 9.COM
Description
No. Number
N/I
AL-BABTAIN LIGHTING
N/I AND PANEL BOARD
N/I FACTORY
MFR I.D# 10012204
N/I AJM/SDHO-
OMEGA FACTORY FOR FSD/SA/T/0070 17/10/208
N/I LUMINAIRES &
GALVANIZING(Div.of
N/I S. & A. Abahsain Co.
N/I Ltd.) MFR I.D#
10011878
N/I
0 Power Source Trading
0 Est.
MFR ID# 10061286
0 SEC ID # 2006417
TRAFFIC SIGNAL
N/I FACTORY, Dammam
MFR ID# 10028204
N/I
AJM/SDHO- 10/18/2018
FSD/SA/T/0071
Procurement Status
LONG LEAD ITEM
Procurement Status
SDHOP Increment-1, Final Site Deve
CONTRACT No. : 66000
BI/JO No. : 28-170
Inspection Pre/Final
IAP Date IAP Date P.O. Vendor/
Assign Pkg Inspect'n
Submitted Resubmitted Date Supplier/ Mfr
(IAP) Y/N Meetings
PO - Purchase Order MATERIAL STATUS
Fab Fab
Delivery Start Progres
Delivered at Date s In %
PO Number Period Completed Balance
Site
(Weeks)
IDR /
NCR
FDR
Forecast
Scehdule Special
Delivery SUBMIT REMARKS :
Delivery Date Process Open Close
Date TED
Date Date
DATE