2- Mobilize equipment -Struck by -Worker shall wear hard hats, high visibility safety vets and safety glasses
-Backed over -Equipment operators shall use a spotter when they have an obstructed view to
rear
-All non -essential worker shall remain outside of the equipment’s swing radius and
the excavation zone
-Essential personnel will remain in a location where they can be seen by the
operator at all times.
-All equipment shall have operational back-up alarms.
3-Manual excavation (Using -Pipe damage -Hand pilot trenching prior to machine excavation with an area of 1.5 m around
hand tool) the existing pipeline
-Never use a damaged tool, report any defect
4- Mechanical -Pipe damage -Excavator excavate at a safe distance of 1.5 m away from existing 4” Winstar
Excavation pipeline from both side
(using excavator) -Ensure proper wrapping of 4” pipeline with adequate material in order to protect it
from impact with excavator bucket
-Ensure banksman, stay visible and communicate with operator while excavation
activity is in progress
Job Steps Potential Hazards Control Measures
-Open trench -Workers shall not enter excavations where water has accumulated
-De-watering using pumps must be carried out in order to ensure surface is dry
-1 metre clearance from edge of trench maintained free of spoils/ materials
-Ensure banksman
-Certified excavator operator
-Work carried out by competent persons
-Full time supervision
-Good open trench signalisation (Proper sign / warning notice shall be used to
delineate the edge of excavation).
-Proper access -ladder /ramp
-An emergency rescue plan should be in place before work begins inside an
excavation
5-Lifting of pipeline by -Defective due to mechanical failure -Maintain proper distance between backhoe loaders when lifting pipeline
mobile plant equipments -Slinging failure -Visually inspect all lifting equipment and accessories prior to use
(backhoe loaders) -Pipe dropping -Only qualified operators to operate mobile plant
-keep always from under / close to load until it is stationary/ secured
-Proper slinging by competent persons
-Ensure stability of ground prior to step up mobile plant equipment
-Personnel should not be located under suspended or moving pipeline
-Keep off pinch points at all times
-Stay away / never intervene when load is displaced
-Ensure mobile plant equipments are set at safe distance at least 4 m from
Job Steps Potential Hazards Control Measures
excavation edges
-Use of tag lines (one @ each end) are in place before lifting the pipe
-PPE: Coverall, safety shoes, safety glasses, hard hat, hi-visibility jacket and
gloves to be worn
-Before pulling pipes, maintain safe distance from 4”winstar pipe (600 mm) and
6-Lowering pipeline -Pipe dropping /damage ensure whole length of pipe is adequately supported at all times
underneath 4” winstar -Unqualified riggers -Lowering the pipe should be gradually
pipeline, pulling and laying -Unsecured pipe -No other activity on the ground during pipe pulling/lifting
into excavation -Pipes will not be released from hook until properly secured onto excavation
-Utilize qualified riggers to install/use rigging equipments
-Coordinate actions (multiple task performers)
- Hand signal motions to be used only by rigger
-Full time supervision
-Use of tag lines (one @ each end) are in place before lifting the pipe
7- Grinding, Welding & Tie- -Improper access -Ladder to be provided to ensure access into /out from trenches
in -Ladder to be inspected and properly placed
-Make sure ground is stable and no slipping hazard occur
-Area around the ladders to be clear of any spoils
8-NDT Work (Radiography -Refer to Risk Assessment for radiography test for Safety Control Measures
Test )
9-Coating -Contact with hot material -Only qualified workers to perform the work
-Chemical substance - MSDS of the coating material to be provided in the area, explained to workforce
-Heat and followed
-Avoid direct contact with product: safety glasses, dust mask and Latex Gloves to
be worn
-Cleared access to be provided, before applying paste
-Burning torch shall be fitted with safety handle
-Do not use lighters, special ignition tools to be provided
-Fire extinguisher to be in place prior commencing
-PPE : Hot gloves and goggles to be worn by the operator
-Area to be monitored to forbid unauthorized persons to get into the area
-Good housekeeping
12- Use of concrete truck -Collapse -Make sure the ground is stable prior to start pumping
mixer (Concrete Pouring -Concrete splash -Make sure the truck is at a safe distance from 4” Winstar Pipeline during
between two pipes) -Reversing equipment concrete pouring
-Rotating mixer -Full supervision during the whole activity
-Unauthorized persons shall be kept away
-Barricades to be in place
-Banksman to be provided
-Mandatory PPE
-Monitoring of manual handling
13- Backfilling -Lack of communication -Access restricted / unauthorized persons to be kept away from the swing
-Movement of equipment radius of equipment while backfilling
-Pipe damage -Use of authorized banksman
-Certified driver to operate
-Make sure soil is carried away from the area
-Full time supervision
-Good housekeeping
JSA Done by: Majdi Abdelkefi -ME HSSE Advisor Signature:
Nizar Souissi -ME Construction Superintendent Date: 22/08/17
Rami Krichen -ME Jr Project Engineer