JOB SAFETY ANALYSIS (JSA)

Date / ‫تـــاريخ‬: N° PTW / ‫رقم رخصـــة العـمـل‬ : Zone /‫المنطقــــة‬ : Person In Charge /‫المــــســــــؤول‬ :

15/11/19 MET CW 714 CAT-1 EPF Nizar Mallek

Replace of the projector’s bulbs using telescopic


Task / ‫المهـــمــة‬

Steps / ‫الـمــــراحــــل‬ Hazards / ‫األخــــــطار‬ Control Measures / ‫إجراءات الوقــــــايـــــة‬


 PTW issued prior to commence operation
1.Work organization  Lack of communication  Toolbox talk/ to highlight the hazards of the activity
 General hazards  Be aware of all basic safety information relating to that
site (first aids, emergency procedures)
 Provide sufficient and adequate supervision

2. Working at Height using  Only inspected telescopic to be used


Telescopic  Mechanical Failure  Respect the working safety load of forklift/Never overload
 Forklift moving/reversing a telescopic
 Person passing nearby or standing under load  Qualified operator to operate the telescopic
 Unsecured load  Ensure the load is secured on the forks/use ropes if
 Falling necessary
 Banksman to be provided when telescopic is travelling or
reversing
 Worker should never pass or work underneath load
telescopic
3.Use of hand tools  Misuse  Never use home-made tools
 Improper maintenance  Good housekeeping
 Return all tools to the toolbox
 PPE to be worn overall, hard hat, safety glasses, safety
shoes, gloves
 Keep all tools in good condition with regular maintenance
 Use the right tool for the job
 Examine each tool for damage before use and do not use
damaged tools

Mazarine Energy Tunisia Last Minute Risk Assessment Report HEM – Oct.17
TBT to be conducted and RA to be communicated prior to commence operation
Additional Measures
‫إجــــــــــــراءات الــــســالمـــــــة‬

Team leader/‫المســـؤول المبــاشـر‬ Supervisor / ‫الــمــــــراقـــــب‬ Safety Officer / ‫الســـــــالمــــــــــة مســـــؤول‬


Name / ‫االس‬
Name / ‫االســـــم‬ Date / ‫التــــاريـــخ‬ Name / ‫االســـــم‬ Time / ‫السـاعــة‬ Time / ‫السـاعــة‬
‫ـــــم‬
Nizar Mallek Ridha Ben
Nasr

Mazarine Energy Tunisia Last Minute Risk Assessment Report HEM – Oct.17