1) The document provides a job hazard analysis for excavation trench work and backfilling using an excavator. It identifies potential hazards such as slip/trip/fall hazards, pinch points during unloading, and manual handling issues.
2) Controls are outlined including obtaining a work permit, conducting toolbox talks, ensuring proper access and barricades, using appropriate PPE, and designating traffic controllers when needed.
3) Recovery barriers in case of incidents include having communications available, providing first aid kits, and close monitoring and supervision of the work. The action parties for implementing controls and barriers are the work leader, HSE supervisor, and work management.
1) The document provides a job hazard analysis for excavation trench work and backfilling using an excavator. It identifies potential hazards such as slip/trip/fall hazards, pinch points during unloading, and manual handling issues.
2) Controls are outlined including obtaining a work permit, conducting toolbox talks, ensuring proper access and barricades, using appropriate PPE, and designating traffic controllers when needed.
3) Recovery barriers in case of incidents include having communications available, providing first aid kits, and close monitoring and supervision of the work. The action parties for implementing controls and barriers are the work leader, HSE supervisor, and work management.
1) The document provides a job hazard analysis for excavation trench work and backfilling using an excavator. It identifies potential hazards such as slip/trip/fall hazards, pinch points during unloading, and manual handling issues.
2) Controls are outlined including obtaining a work permit, conducting toolbox talks, ensuring proper access and barricades, using appropriate PPE, and designating traffic controllers when needed.
3) Recovery barriers in case of incidents include having communications available, providing first aid kits, and close monitoring and supervision of the work. The action parties for implementing controls and barriers are the work leader, HSE supervisor, and work management.
FACILITY GIFT LOCATION GIFT / NEAR GIS SPECIFIC WORK STATION SEPCOO III early comb WORK EQUIPMENT NO DESCRIPTION Excavation trench and backfilling and coverage by excavator NOTE: 1. JHA shall be applicable for all work activities which requires PTW. 2. The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA. 3. Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified work. 4. Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by all involved personnel.
JOB STEP CONTROL BARRIERS OF JOB STEP HAZARD CONSEQUENCES PARTY BARRIERS PARTY a) Access to a) Preparation to a) Slip, trip & fall Minor injury Obtain/ display approved PTW at SEPCOO Communication SEPCOO Work working make proper hazards if (Laceration, , Site Work leader s must be Management. Area access and improper storing contusion or Organize toolbox meeting & share or HSE available during egress into of material, wound) the approved JHA with all Supervisor the work the work area equipment, etc. personnel that involve with the activity. Body strain work b) Pinch point while and sprain if Ensure adequate precaution and b) Driving to the unloading of poor lifting or access are in place to allow the jobsite blocks or tools handling work to progress safely Mixer machine must be inspected c) Manual handling/ Serious injury; and approved by PCIHBV ergonomics issue Fracture or personnel body or part of Ensure entire work area d) Vehicular the body crush barricaded and properly secured accident: taking upon contact from unauthorized personnel. turns too sharp; with vehicles Wear appropriate PPE including hitting objects or any other as required people Provide traffic controller or banksman to control any vehicles movement Inspect and ensure all other working tool free from damage. Competent driver: watch turning radius or apply wide turns if required Provide first aider c/w 1 unit of First aid box with sufficient content Close monitoring & supervision required b) Soil a) Carry out a) Equipment Minor injury to Place the temporary sign boards SEPCOO Communication SEPCOO Work leveling, survey work such as personnel: such as “man at work” or any Work leader s must be Management. compacting mixer, wheel (Laceration, related hazards sign around the or HSE available during b) Leveling & barrow, contusion, work area. Supervisor the work compacting spades, etc. wound, etc.) Make safety soft barricade around activity. the ground in unsafe the work area Traffic accidents working Body strain Thoroughly inspect equipment c) condition and sprain before use. Make sure all equipment are free from defect b) Struck by or Health issue: and operable. caught in heat stress, Lifting/ removing hollow block equipment o heat using manpower at permissible r hitting exhaustion, limit is strongly required or not equipment body cramp, over lifting or people etc. Use proper bending, lifting and stooping techniques for any c) Manual Serious injury manpower lifting handling/ or part of the Provide & use proper ladder for ergonomics body fracture access & egress while working at issues higher level. Also secure the Manage work/ ladder in the top or bottom d) Hot weather rest times. Wear body harness if working temperature above 2.0 meter Continuously maintain good housekeeping e) Falling especially storage of materials hazards for Provide sufficient drinking water roof at site installation Report to Supervisor/ MSK for work any incident/ injury f) Collision, run Competent drivers must have over knowledge about the defensive driving on the site/ Traffic management plan must be implemented, Flag man to control the traffic movement especially sharing the road with the public/ Speed signs all the way from &to the disposal area. Back pain, strain and No evacuation plan in Ensure assembly point , Supervisor C- Excavation sprain, Tripping, work place and escape route for all Inform CCR trench and falling, hazards. Hand Body pain ,strain and workers . Briefing the backfilling and pain ,body injury sprain ,Injury and illness Watch out if the emergency coverage by .Physical hazard for health ,Health issue equipment is SEPCOO Supervisor plan ,Training excavator bone dislocation. overheated ,Ensure the Physical Injury. workers health condition ,train them safe work Vibration practice ,Provide drinking water at site ,Remove the obstruction's from the area ,The working area is sufficient precaution's in place .Provide rest period for hard workers and change the workers . D- House a) Remove all a) Slips, Trips, Falls Personal injury Wear adequate PPE including SEPCOO Communication Iraq Gates keepin the work due to uneven (Laceration, suitable hand gloves Work leader s must be Management. g materials, surface or poor wound, Remove all the surplus material/ or HSE available during equipment house keeping fracture) waste and keep the area clean & Supervisor the work and tools Finger and intact. activity. from the work b) Pinch between hand injury Ensure close supervision area materials or Body strain machineries and sprain if c) Manual handling/ poor lifting ergonomics issues JHA APPROVAL DURING PTW APPLICATION
ACCEPTED BY RECEIVING AUTHORITY ACCEPTED BY RECEIVING AUTHORITY
NAME NAME DESIGNATION DESIGNATION SIGNATURE SIGNATURE DATE DATE
AFTER PTW HAS BEEN APPROVED
WORK TEAM (CONFIRAMTION TEAM JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OFPRE-JOB/TOOLBOX MEETING –