You are on page 1of 2

Equipment Inspection Checklist

Page 1 of 2
(Lifting Tools & Tackles)

Department. Document Ref. No. Issue Date Checklist No.

Project/Facility Name:
Finance Code: Project Code:
Made:
Equipment Name: Lifting Tools & Tackles Equipment No.
Company ☐ Contractor ☐ Sub-Contractor ☐ Others:

Note: Write Yes, No or N/A in the given box and if some comments, mention in the remark’s column.
Remarks
Ref: Description Remarks
Yes No N/A
1. Use a thimble for making I-shape. ☐ ☐ ☐
2. Wire rope should be knotted with the proper clamp. ☐ ☐ ☐
Web-sling should be free from defects, e.g., cuts, abrasion, knot, hole &
3. ☐ ☐ ☐
oily, etc.
4. l-shape should be free from damages. ☐ ☐ ☐
D-shackle should be in good condition and its face should not expand more
5. ☐ ☐ ☐
than 15% than its original shape.
6. Suitable I bolt should be used. ☐ ☐ ☐
7. lifting tools & tackles should be used having suitable strength& capacity. ☐ ☐ ☐
8. Lifting tools & tackles should safely be handle and store. ☐ ☐ ☐

FIT ☐ Partially Fit ☐ Unfit


Inspected by: Reviewed by:
Name:

Signatures:

HSE Documents-Equipment Inspection Checklist- Lifting Tools & Tackles


Equipment Inspection Checklist
Page 2 of 2
(Lifting Tools & Tackles)

Department. Document Ref. No. Issue Date Checklist No.

HSE Documents-Equipment Inspection Checklist- Lifting Tools & Tackles

You might also like