JSA (Job Safety Analysis) Sheet

Activity Name:- Erection of Fabricated bridge Ref-


Location:- Date :
Sr.N Activity Type of
Risk Involved Risk Control measures
o. Name Hazard
TBT shall be conducted before starts the activity.
Untrained Provide all PPE`S as i.e.Helmet,Jacket,Shoes,Goggles.
Mobilisation of persons,
1 Personal injury All required permits should be taken before start activity
manpower unexperienced
person Work should be done under continous supervision.
Only authorised person should be deployed for the work.
Approch of Ensure that heavy equipment unloading access should be even surface.
Uneven vehical
Heavy fall of materials, Access should be safe,clear, & identified.Unloading stacking work area should be soft barricated.
2 Access, uneven
Equipment at Personal injury
work area No any loose materials to be kept inside barricating area.
job location
Only authorised person should be deployed for the work.
Only inspected vehical having valid insurance,RTO,licence.& Ensure that head lights,reverse
Turning of horn,indicators, front horn is in good condition
fall of materials, Bank`sman should be present contionously for movement control.
bridge for Unapproved
Tilt of crane or
3 appropriate Vehical, uneven Ensure that hooking shall be adeqately fitted with Gunnybags & properly lock safety lutch.
Farana, Personal
position by work area, No any shall be allowed under suspended load.Guide rope thick shall be tied to both ends
injury
crane & Farana Access should be safe,clear, & identified.Unloading stacking work area should be soft barricated.
Bank`sman should be present contionously for movement control.
Only inspected crane having valid insurance,RTO,licence & form no. 11
Unapproved Ensure that the safety latch should be damage free.Boom rope should be in good condition.
Tying the sling lifting m/c,
to Bridge & damaged safety Ensure only inspected & Damage free ladder should use for access
4 fall of materials
hook, crane, latch or welded Only certified lifting tackles should be used & all lifting tackle shall be visiually inspected before work.
Farana hook, Improper
access Bank`sman should be present contionously for movement control.
Ensure that hooking shall be adeqately fitted with Gunnybags & properly lock safety latch.
Lifting of No any shall be allowed under suspended load.
Fabricated Damage lifting
5 bridge near tackle, sling Personal injury Guide rope shall be tied to both ends.
erection escape
location Gunny bags should be used for sharpness protection.
Ensure that crane boom length shall be not more than m. Bank`sman should be stand by present at
location
Guide rope should be tied during shifting of material.
Wrong rope
Errection of Personal injury, fall
anchor, overload Ensure that person stand away ; No one put hand below load during fixing & alignment.
6 Fabricated of person, stuck to
on boom, Ensure bridge is fixed by bolt or welding before removing of wire rope or web belt
bridge person
colomn swing
Ensure that inspected hand tools i.e. spanner used for nut bolting.
Finger caught Ensure that nut bolt should be properly tight.
Fixing & Cut injury,
between, faulty
7 Alingment of personal injury, fall
hand tools , Crane boom sling not removed untill the bridge adequately fitted in fastener with bolting.
Bridge of bridge
loose bolting
Night work permit to be taken from concern engg.and safety dept.
Darkness, fall Personal injury,
Work during Ensure proper illumination during dark hours.
8 of person, fall damage to
dark hours Electrical cable should lead min 2 m height. No exposed electrical wire.Earthing.
of material property
Route shall be illuminated.

Name & Signature of Site Engineer / Supervisor :______ Name & Signature of Site In-charge :___________

Name & Signature of Project In-charge :__________ Name & Signature of HSE Officer : ______