Only trained and authorized person should be deployed on this work. Use of
required PPE’s such as safety helmet, jacket, safety shoes (As per PPE’s matrix)
1 Mobilization of Unskilled worker 3 2 6 Tool box talk should be conducted before start the activity. Work permit should 2 1 2
manpower be taken before start the work. Work permit should be carried out under
adequate &continue supervision.
Fall of material while lifting 3 4 15 Area to be barricaded, Correct Tools & Tackles to be used.Competent person to 1 2 2
be engaged during lifting.
TPIof crane to be conducted, Fitness certificate of Operator , Ground to be
1 Material unloading Failure of crane 2 5 10 compacted & level.Proper radius to be maintained as per load chart. 2 1 2
by crane
Failure of lifting tools & tackles 3 4 12 All lifting gear should have TPI. Pre inspection of all tools & tackles. 2 2 4
Use job specific hand gloves. Provide proper access for shifting the material.
Caught in between 2 5 10 provide sufficient manpower. Safe manual handling procedure to be followed. 1 4 4
TBT conducted before start the job
Injury to eyes 3 3 9 Goggles to be worn.only trained and authorized person should operate the 2 2 4
power tools
Injury to body parts 3 4 12 Job specif Ppe's must be used. 2 2 4
All electrical connection to be connected from 30ma RCCB.Electrical cable to be
Exposure to contact with energized circuit 3 3 9 placed over head.Required PPEs to be used. 1 2 2
Use of power and
1 hand tools Noise 3 3 9 Good condition of tools to be used.ear plug ,hand gloves to be weared 3 1 3
Erection of scaffolding
Secure working platforms’, no opening, no loose materials on the height.
Fall of object 3 4 12 Throwing of materials is strictly prohibited.Only trained and experinced 2 2 4
scaffolder to be engage for erection work.
Hand rail, full body harness ,life line, safety net, access ladder to be
1 Scaffolding Fall of person from height 3 4 12 provided.work at height training to be given.Height work permit to be used. 1 2 2
Avoid over load, Scaffolding as per standard. Scaffolding tag to be used and
Collapse of scaffolding 3 4 12 signed by competent person.Sacaffolding material to be in good condition and 3 1 3
check before use.
Page 1 of 2
Sharp Designers & Engineers India Pvt. Ltd.
Fall of person from height 3 4 12 Hand rail, full body harness ,life line, safety net, access ladder to be provided 3 1 3
Over loading is strictly avoided. SWL to be displayed .Ensure the stability of the
Over loading & collapse of cradle 3 4 12 suspended working platform. All persons should anchor his lanyard on cradle 1 4 4
to be ensured. counter weight to be locked.
1 Working on cradles Electric shock 3 4 12 Secure earthing & ELCB to be provided .Assure proper cable management. 1 4 4
Scaffold
Erected
every week. & Scaffold tag should be displayed at each scaffolding. Standard checklist is foll
Page 2 of 2