Sharp Designers & Engineers India Pvt. Ltd.

Reliance Industrial Limited Jamnagar New Guest House


Sr.No. Activity Type of hazards Probality Severity R=S*P Control Measures Probality Severity Resultant risk

Only trained and authorized person should be deployed on this work. Use of
required PPE’s such as safety helmet, jacket, safety shoes (As per PPE’s matrix)
1 Mobilization of Unskilled worker 3 2 6 Tool box talk should be conducted before start the activity. Work permit should 2 1 2
manpower be taken before start the work. Work permit should be carried out under
adequate &continue supervision.

Manual material Safe material handling posture to be adopted, workmen to be trained on


2 unloading Improper posture 2 4 8 manual material handling sequence, PPE’S to be used 2 2 4

Material unloading by crane/Manually


Fall of person form Vehicle 3 4 12 Pre erection plan PPE’S like fall arrester, full body harness to be used . 2 2 4

Fall of material while lifting 3 4 15 Area to be barricaded, Correct Tools & Tackles to be used.Competent person to 1 2 2
be engaged during lifting.
TPIof crane to be conducted, Fitness certificate of Operator , Ground to be
1 Material unloading Failure of crane 2 5 10 compacted & level.Proper radius to be maintained as per load chart. 2 1 2
by crane
Failure of lifting tools & tackles 3 4 12 All lifting gear should have TPI. Pre inspection of all tools & tackles. 2 2 4

Tag line to be used, Swing area to barricaded., Unathorize entry to be


Swing of load 2 4 8 restricted. 1 2 2

Use job specific hand gloves. Provide proper access for shifting the material.
Caught in between 2 5 10 provide sufficient manpower. Safe manual handling procedure to be followed. 1 4 4
TBT conducted before start the job

Material should be stacked properly. Height maintains for material stacking


(Max.1.5 mtr.) stacking area should be barricaded with caution board/
Material unloading Fall of material Signage’s. A stand & wooden or metallic ramp or frames should be used for
2 by manually 2 3 6 1 2 2
/Sharp object stacking of glass material. Work shall be carried out under continuous
supervision. Material should not be stacked all the edge of the slabs. Opening
etc.

Poor Illumination 3 3 9 No unloading activity to be performed in poor illumination. 1 1 1

Use of power tools and hand tools

Injury to eyes 3 3 9 Goggles to be worn.only trained and authorized person should operate the 2 2 4
power tools
Injury to body parts 3 4 12 Job specif Ppe's must be used. 2 2 4
All electrical connection to be connected from 30ma RCCB.Electrical cable to be
Exposure to contact with energized circuit 3 3 9 placed over head.Required PPEs to be used. 1 2 2
Use of power and
1 hand tools Noise 3 3 9 Good condition of tools to be used.ear plug ,hand gloves to be weared 3 1 3

Expired date abrasive wheel to be used, wheel rpm to be checked.Wheel guard


Failure of abrasive wheel 3 4 12 to be used 2 1 2

Secure working platforms’, no opening, no loose materials on the height.


Fall of person and material 3 4 12 Throwing of materials is strictly prohibited. 2 2 4

Erection of scaffolding
Secure working platforms’, no opening, no loose materials on the height.
Fall of object 3 4 12 Throwing of materials is strictly prohibited.Only trained and experinced 2 2 4
scaffolder to be engage for erection work.

Hand rail, full body harness ,life line, safety net, access ladder to be
1 Scaffolding Fall of person from height 3 4 12 provided.work at height training to be given.Height work permit to be used. 1 2 2

Avoid over load, Scaffolding as per standard. Scaffolding tag to be used and
Collapse of scaffolding 3 4 12 signed by competent person.Sacaffolding material to be in good condition and 3 1 3
check before use.

Page 1 of 2
Sharp Designers & Engineers India Pvt. Ltd.

Reliance Industrial Limited Jamnagar New Guest House


Sr.No. Activity Type of hazards Probality Severity R=S*P Control Measures Probality Severity Resultant risk
Fixing of brackets & Panels

Fall of person from height 3 4 12 Hand rail, full body harness ,life line, safety net, access ladder to be provided 3 1 3

Secure earthing to be provided, with proper cable management. ELCB to be


Surveying the Electrocution 3 4 12 provided.naked wire should not used 3 1 3
point , Fixing of
1 bracket/Align ment Failure of drill bit 3 3 9 Drill bit to be fix properly by skill personnel,Safety goggle to be used 1 3 3
of panels Fixing with Fall of person/material from height 2 3 6 Ensure that person working should have full body harness with proper 1 3 3
anchor fastener anchoring with life line/strong structure
All debris to be removed from edge of slab. Housekeeping to be maintained in
Housekeeping 3 3 9 regular basis 2 1 2
Substandard hand tools 3 3 9 Standard hand tools to be used. Inspect the tools before used 1 3 3
Every week erected scaffolds should be checked by competent person &
Fall of person from height 3 3 9 Scaffold tag should be displayed at each scaffolding. Standard checklist is 1 3 3
2 Working on Height followed for inspecting the scaffolding.
Slip & trip 3 3 9 Housekeeping to be maintained. Clear assess to be provided. 1 3 3
Working on cradles
Fall of person from height 3 4 12 Ensure proper hand rail &access. Full body harness to be used. 2 2 4

Over loading is strictly avoided. SWL to be displayed .Ensure the stability of the
Over loading & collapse of cradle 3 4 12 suspended working platform. All persons should anchor his lanyard on cradle 1 4 4
to be ensured. counter weight to be locked.

Toe guard to be provided on cradle working platform. Ground area to be


Fall of material 3 4 12 barricaded while cradle is operation un wanted material to be removed & good 3 1 3
housekeeping to be maintained.

1 Working on cradles Electric shock 3 4 12 Secure earthing & ELCB to be provided .Assure proper cable management. 1 4 4

Skill operator to deployed. Daily inspection to be carried out by competent


Failure of cradle due to improper operation 3 3 9 person. 1 4 4

Working crew should aware of emergency procedure. The injured person


should be given first aid immediately. First aid box shall be made with required
Emergency response 3 3 9 medicines in adequate quantity. One vehicle shall be made available for 3 1 3
meeting emergency needs. Rescue kit should be available all time at site. All
employees shall be explained about the provisions of first
aid. Assembly points and contact number ETC.

Scaffold

Erected

to be erected as per standard, trained scaffolders.


scaffolds should to be checked by competent person in ev

every week. & Scaffold tag should be displayed at each scaffolding. Standard checklist is foll

owed for inspecting the scaffolding.

Page 2 of 2