You are on page 1of 20

JOB HAZARD ANALYSIS

For
TEMPORARY SHEET PILING WORKS, IGSMC PROJECT

JHA NO.: REVISION NO.:A AREA: MIC

Job Ref: (Contract No.:)

Job Description: : METHOD STATEMENT FOR TEMPORARY SHEET PILING WORKS,


IGSMC PROJECT
NALYSIS Doc No. ES.0.08.0020
Rev.: Date: A 12/03/2020
RKS, IGSMC PROJECT Page: 1 of 12

JOB LOCATION: DATE: 12-03-2020

Hazardous Area Classification: Zone 0 , Zone 1 ,


Zone 2 , Non-Hazardous 
Permit Type & No.:
Description Task Step / Hazard description
Activity and effect
Initial Risk Rating

Entrance without
Gate Pass.
Unfamiliarity of
Mobilization of site rule/area. P= 3XC (Medium)
personnel, equipment A= 3XC (Medium)
and materials Vehicle hitting E= 2XC (Medium)
personnel R= 2XC(Medium)
Traffic Violation,
Traffic Accidents
Fall of material

Expose steel bars used P= 3XC (Medium) A=


for location points 2XC(Medium) E= 0XA (NA)
Slip, trips & fall R= 2XC(Medium)

Surveying Work/Setting out


of coordinates

P= 3XC (Medium) A=
3XC(Medium) E= 2XC
(Medium) R= 2XC(Medium)
Fall of Material Poor
Ground Condition

Lifting by crane:

Sheet piles,
Welding Machines
Whaler Beams, Strut
beam and General
Materials Machine Failure P= 3XC (Medium) A=
3XC(Medium) E= 0XA (NA)
R= 2XC(Medium)

Failure of lifting Tools P= 3XC (Medium) A=


and tackles 3XC(Medium) E= 0XA (NA)
R= 2XC(Medium)

P= 3XC (Medium) A=
3XC(Medium) E= 0XA (NA)
R= 2XC(Medium)

High wind speed

 Fall, Slip of
personnel
 Fall of material from
height
Equipment work/Pedestrian P= 3XC (Medium) A=
platform 2XC(Medium) E= 0XA (NA)
R= 2XC(Medium)
 Vehicle Collision
 Vehicle hitting
operatives
 Vehicle hitting
structures
 Overturning of
vehicle/equipm ent
P= 3XC (Medium) A=
Equipment Maneuvering 2XC(Medium) E= 0XA (NA)
inside site/work platform R= 2XC(Medium)
Control Measures

Residual Risk

 Obtain all necessary Gate pass &permits for vehicle


and personnel from QP and other authorities.
 Site induction shall be conducted to familiarize the worker with
site rules.
 Material shall be firmly secured to the vehicle.
 Safe lifting and handling of material during unloading
 Ensure all the material stored in proper manner
 All drivers must follow all traffic rules and sign boards
 Usage seat belt
 Avoiding overload, the capacity of vehicle NEC Supervisor
 Operators shall be competent and certified and Licensed P= 1XC (Low) Qcon Supervisor, Qcon
 Equipment shall be certified and complied with local and A= 1XC (Low) PTW Holder, Site workers.
legal requirements
 All activity shall be done under the supervision of a competent E= 1XC (Low)
supervisor R= 1XC(Low)

 Supervisor to insure that the working area is properly P= 1XC (Low) A= 1XC
organized and all obstruction are removed. (Low) E= 0XA (NA) R=
1XC(Low)
 Surveying assistance shall be brief prior to start working.
 Proper PPE shall be provided and be worn at all time.
 All steel reference point shall be provided with plastic cap. NEC Supervisor
Qcon Supervisor, Qcon PTW
Holder, Site workers.

 Mobile crane shall be set up correctly on firm ground, P= 1XC (Low) A= 1XC
placed level, outrigger fully extend, outrigger pads (Low) E= 1XC (Low)
R= 1XC(Low) NEC Lifting Supervisor Qcon
placed on mats before any lifting activity. Supervisor, Qcon PTW Holder,
 Project HSE plan shall be followed. Site workers.

 Crane equipment shall be certified by 3 party and have valid


rd

License.
 Crane operator shall be 3 party certified and possess
rd NEC Lifting Supervisor
valid License. Qcon Supervisor, Qcon
 Lifting gears & slings shall be certified
 Regular inspections shall be carried out and monitored
by Lifting supervisor
 Follow approved lifting plan
 Lifting permit to be obtained
 Periodical maintenance shall be doe and recorded
 Crane equipment shall be certified by 3 party and have valid
rd

License.
 Crane operator shall be 3 party certified and possess
rd

valid License.
 Lifting gears & slings shall be certified
P= 1XC (Low) A= 1XC PTW Holder, Site workers.
 Regular inspections shall be carried out and monitored (Low) E= 0XA (NA) R=
by Lifting supervisor 1XC(Low)
 Follow approved lifting plan
 Lifting permit to be obtained
 Periodical maintenance shall be doe and recorded
 All near missed, accident and incidents shall be recorded
and recommended control measures shall be implemented.
 Shall follow local and legal and environmental
guidelines

 Tagline ropes shall be used to control the movement


of the suspended objects
 No lifting activity when wind speed exits allowable limit 40
KM/h
 Full extended outrigger and pad to be used

 Certified lifting tools and tackles shall be used. P= 1XC (Low) A= 1XC
 The tools and tackles shall be inspected by (Low) E= 0XA (NA) R=
1XC(Low) NEC Supervisor
competent person periodically
Qcon Supervisor, Qcon PTW
 Storage and maintenance of tools and tackles shall be done Holder, Site workers.
adequately.

 Shall follow local and legal and environmental P= 1XC (Low) A= 1XC NEC Supervisor
guidelines (Low) E= 0XA (NA) R= Qcon Supervisor, Qcon PTW
1XC(Low) Holder, Site workers.
 Tagline ropes shall be used to control the movement
of the suspended objects
 No lifting activity when wind speed exits allowable limit 25
knots
 Plan all lifting activity as per the weather forecast.
 Obtain permit for any critical lifts.
 Secure working platform appropriately Adequate scaffold
materials shall be used to make working platform NEC Supervisor
 Standard ladder shall be used for access and ladder
placed at angle 1: 4 ration.
P= 1XC (Low) A= 1XC Qcon Supervisor, Qcon PTW
 Maintain three point contact with Ladder and secure (Low) E= 0XA (NA) R= Holder, Site workers.
Ladder/holding by an assistant when accessing height, only 1XC(Low)
light duty work and access.
 Safety harness shall be used when working above
1.8 m height
 Wear appropriate PPE

 Use hoist or adequate tool pack to carry tools


 Obtain all necessary permits for vehicle/Plant from UDC NEC Supervisor
 All drivers must follow all traffic rules and sign boards Qcon Supervisor, Qcon PTW
Holder, Site workers.
 Usage seat belt
 Follow speed limit of 20km/h at site.
 Segregate vehicle and pedestrian routes.
 Banksman and Flagmen shall direct and
coordinate movement of equipment
 Transport routes shall be even/level ground. P= 1XC (Low) A= 1XC
 Crane equipment shall be certified by 3 party and have valid
rd (Low) E= 0XA (NA) R=
License. 1XC(Low)
 Crane operator shall be 3 party certified and possess
rd

valid License.
 Flagman shall direct and coordinate equipment movement
Description Task Hazard description Initial Risk/Impact
Step / Activity and effect

P= 3XC (Medium)
 Struck by the pile A= 2XC(Medium) E=
0XA (NA)
guide during
installation
Installation of Pile R= 2XC(Medium)

guide
P= 3XC (Medium) A=
2XC(Medium) E= 0XA (NA)
R= 2XC(Medium)
 Hit by the vibrio
hammer

P= 3XC (Medium) A=
2XC(Medium) E= 0XA (NA)
R= 2XC(Medium)

 Fall due to
Shackle not
properly fix

 Vibrio hammer P= 3XC (Medium) A=


Hydraulic pump 3XC(Medium) E= 0XA (NA)
R= 2XC(Medium)
failure

P= 3XC (Medium) A=
 Poor Rigging and 0XA(NA)
E= 0XA (NA)
lifting Practice
R= 0XA(NA)
 Incompetent Crane
operator
Lifting Operation–  Fall of Materials
 Collapse of Lifting
crane
Installation of Sheet piling.  Unsecured load P= 3XC (Medium)
Supply and Installation of  Uneven ground A= 3XC(Medium) E=
0XA (NA)
 Adverse weather R= 2XC(Medium)
condition

sheet pile

P= 3XC (Medium) A=
3XC(Medium) E= 0XA (NA)
R= 2XC(Medium)

Falling of suspended
load of sheet pile
Residual Risk Action by

Control Measures

 Rigger and other personnel involve should keep distance from the steel P= 1XC (Low)
pipe casing during installation and lifting/always provide tagline when lifting
to avoid swinging of casing / wear PPE all the time A= 1XC (Low) NEC Supervisor Qcon
 Planned and organize competency training for all personnel with a special E= 0XA (NA) R= Supervisor, Qcon PTW
assignment like equipment operator and riggers/banks man for third party 1XC(Low) Holder,
certification/ conduct induction and site briefing prior start working/
supervisor to conduct a weekly tool talk. HSE monitoring on site should be Site workers.

 Personnel involved should stay under Kelly bar always stay away from the P= 1XC (Low) A= 1XC NEC Supervisor Qcon
(Low) E= 0XA (NA) R= Supervisor, Qcon PTW
Piling area / barricade the area with signage caution moving equipment & 1XC(Low) Holder, Site workers.
work in progress.
 Super visor to insure that all personnel involve are competent and trained.

 Supervisor to check the fixing of shackle and other rigging gear to make P= 1XC (Low) A= 1XC NEC Supervisor
(Low) E= 0XA (NA) R= Qcon Supervisor, Qcon
sure they are properly fix prior to start lifting/ isolate and barricade the 1XC(Low) PTW Holder, Site
working area with signage lifting in progress/Only competent personnel is workers.
allowed to do the pile guide installation / removal.

 Planned and organize competency training for all personnel with a special
assignment like equipment operator and riggers/banks man for third party
certification/ conduct induction and site briefing prior start working/
supervisor to
 Conduct daily routine inspection on equipment base on equipment P= 1XC (Low) A= 1XC NEC Supervisor
(Low) E= 0XA (NA) R= Qcon Supervisor, Qcon
checklist to make that all parts of the equipment is functioning proper prior 1XC(Low) PTW Holder, Site
to start working. workers.
 Acceptable risk./Super visor to closely monitor the activity to insure
personnel are following the procedure.

 The operator should be an experienced and qualified person


NEC Supervisor
 All the parts of units are in good condition and test certificate of slings. ‘D’
shackles and other lifting items should be available at the work place Qcon Supervisor, Qcon
 All the lifting activities should be done in the presence of qualified rigger PTW Holder, Site
 Daily inspection and maintenance should be done workers.
 Reinforcement has sufficient ties or to give sufficient strong points P= 1XC (Low)
 All the rotary parts of machine should be guarded A= 0XA (NA)
E= 0XA (NA) R= 0XA
 All operators and machines have to be certified by a third party agency (NA)
 Planned and organize competency training for all personnel
with a special assignment like equipment operator and riggers/banks man
for third party certification/ conduct
 Lifting permit shall be obtained
 Crane operator shall be competent and possess Operator`s License and
3 party certificate.
rd

 Competent Rigger shall coordinate lifting operation


 Lifting gears and appliances shall be certified by 3 party
rd NEC Supervisor
 Lifting Supervisor shall supervise lifting operation P= 1XC (Low) Qcon Supervisor, Qcon
 Crane shall be position on a level ground A= 1XC (Low) E= 0XA PTW Holder, Site
(NA) R= 1XC(Low) workers.
 Weather condition shall be monitored and lifting shall stop when wind
speed exceed 25 knots

 Supervisor to conduct safety talk to discussed and instruct all the P= 1XC (Low) A= 1XC NEC Supervisor
(Low) E= 0XA (NA) R= Qcon Supervisor, Qcon
personnel involve in this activity to make sure that they are aware of the 1XC(Low) PTW Holder, Site workers
hazards involved. Always followed good lifting practice/all lifting shall check
and be certified by third party/no one is allowed to stay under suspended
load/always provide tagline on the load on both end to keep the load from
moving and keep it stationary till it is being lowered safely.
 Planned and organize competency training for all personnel with a special
assignment like equipment operator and riggers/banks man for third party
certification/ conduct induction and site briefing prior start working/
supervisor to conduct a weekly tool talk. HSE monitoring on site should be
strictly implemented. Base on client and main contractor HSE Plan.
JOB HAZARD ANALYSIS
For
TEMPORARY SHEET PILING WORKS, IGSMC PROJECT

 Mechanical failure of
crane/failure of
hydraulic pump

P= 3XC (Medium) A=
3XC(Medium) E= 0XA (NA)
R= 2XC(Medium)

 Electrical hazards- P= 3XC (Medium) A=


Welding Cables, welding 3XC(Medium) E= 0XA (NA)
Machines R= 2XC(Medium)
JOB HAZARD ANALYSIS Doc No. ES.0.08.0020
For Rev.: Date: A 12/03/2020
TEMPORARY SHEET PILING WORKS, IGSMC PROJECT Page: 9 of 12

 Operator to conduct a daily routine inspection base on crane inspection P= 1XC (Low) A= 1XC NEC Supervisor Qcon
(Low) E= 0XA (NA) R= Supervisor, Qcon PTW
checklist to make sure that all parts of the equipment are functioning 1XC(Low) Holder, Site workers
properly/ preventive maintenance shall always be conducted to keep the Supervisor, Qcon PTW
equipment condition and functioning properly. Holder, Site workers
 Super visor to closely monitor the operator to unsure that daily routine
inspection is being done according to the checklist standard

 All electrical installation must be carried out only by a competent person P= 1XC (Low) A= 1XC NEC Supervisor
(Low) E= 1XC (Low) Qcon Supervisor, Qcon
 Earth leakage relays must be incorporated on circuit. R= 1XC(Low) PTW Holder, Site
 Daily inspection and maintenance should be done workers
 Cables should not lay down on the ground.
 Should be used proper plug and socket.
 Earth thing or grounding should be provided for all electrical equipment.
 Proper warning signs and PPE should be provided to all at the working
area.
 Planned and organize competency training for all personnel with a special
assignment like equipment operator and
JOB HAZARD ANALYSIS
For
TEMPORARY SHEET PILING WORKS, IGSMC PROJECT

 Free standing
cylinder no cylinder
rack/leakage of
gases/Flammabl e
materials scattered
around the welding
area/absent of valve
cap/Damage gauges
gases/no proper
insulation of welding
cables/ no proper
grounding of welding
machine/no proper
ventilation. P= 3XC (Medium) A=
3XC(Medium) E= 2XC
Gas Cutting/ Welding (Medium) R=
2XC(Medium)

P= 3XC (Medium) A=
OXA(NA)
E=3XC (Medium) R=
3XC(Medium)

 Spillage / over flow


of fuel,
Fuel filling of equipment
Environme ntal
pollution & fire
 High Wind speed
Working under adverse  Poor visibility P= 3XC (Medium) A=
weather- wind storm, sand  Sand storm OXA(NA) E=0XA (NA)
storm and extreme cold.  Exposure to cold R= 2XC(Medium)
weather
JOB HAZARD ANALYSIS Doc No. ES.0.08.0020
For Rev.: Date: A 12/03/2020
TEMPORARY SHEET PILING WORKS, IGSMC PROJECT Page: 10 of 12

 Use properly tested and checked equipment


 All equipment should be fitted with earth leakage circuit breakers
 Provided and ensure the flash back arrestor is avoiding back fire
 Use proper cutting cylinders and keep up right position
 Keep the surrounding area free from all flammable material. If not
possible cover with fire proof clothing/combustible materials must be remove
from the welding area/suitable fire extinguisher shall be provide and place at
the nearest area/All gas cylinder shall be provided with a cap/area of
operation must well ventilated
 Super visor to brief and instruct the welder on how to keep the cylinder
safe .and monitor the activity to insure safety is being address.
 Check equipment and gas cylinders before starting work
 Keep all sources of ignition away far as possible from gas cylinders P= 1XC (Low) A= 1XC NEC Supervisor
(Low) Qcon Supervisor, Qcon
 Place a fire extinguisher and fire watcher during the cutting operation E= 1XC (Low) R= PTW Holder, Site
 Provide and ensure the flash back arrestor is avoiding back fire 1XC(Low) workers
 Use proper cutting goggles
 Always chain the cutting cylinders and keep up right position
 Keep the surrounding area free from all flammable material. If not
possible cover with fire proof clothing.

 Fuel must not be filled at hot work processing zone P= 1XC (Low) A= 0xA(NA) NEC Supervisor
E= 1XC (Low) R= Qcon Supervisor, Qcon
 smoking zoneshould not be near the fuel storage or filling area 1XC(Low) PTW Holder, Site
 After filling of fuel the tanks and fuelstock container must be closed workers
tightly
 Fuel filling drums must be stored under shelter / shade with appropriate
spill kits and trays.
 Should not attend calls /usemobile at the time of filling.
 While filling fuel the empty tray must be provided below the tank.
 Fire extinguisher and sand filled bucket stand must be provided nearfuel
filing area.
 Stop work when weather condition become adverse and unsafe – when
wind speed is 25 knots
 Provide cold refugees
 Provide rest area in site.
 Job /rotation to be done. NEC Supervisor Qcon
 Adequate breaks for the working crew. P= 1XC (Low) A=
0xA(NA) E= 0xA(NA) Supervisor, Qcon PTW
 Display emergency contact list in the site. Holder,
R= 1XC(Low) Site workers
Navayuga Engineering Company WLL
Contractor Name

Project Name: TEMPORARY SHEET PILING WORKS, IGSMC PROJECT


Task Description Risk Assessment AND JOB SAFETY ANALYSIS (JSA)

Task Site Location Mesaieed, Qatar

Signature& Date:

Designation: HSE Manager

Prepared and Reviewed By:


Participants/Preparation

PROJECT Designation
A) PM Ramesh

HSEM Valentine O.
HSEO TBM by NEC
Supervisor/Engineer TBM by NEC

Project Manager