You are on page 1of 4

Etapele activitatii /Job Pericole Impact posibil Contingenta

No. / Hazards / Possible impact Masuri de control / Control measures / Contingency


steps
 Supervised operations – one person in charge (PSS) & team
work- minimum 3 competent personnel in a lifting team (crane
operator; banksman, rigger/ slinger)
 Personnel training and certification: crane operator; banksmen,
Limb/torso/head/internal riggers/ slingers (PM)
organs injury due to fall (IN)  Planning of activity: Lift Plan (PSS)
Preparation o Assess the load- characteristics and restrictions (PSS)
 Ensure everyone is o Specific Equipment layout – ensure lifting routes are clear
trained and knows the task Damage to equipment (PL)
of obstructions; mark / highlight all proximity hazards ensure
 Ensure relevant personnel final position for load is adequate (PSS)
are aware of the tasks to Equipment loss (PL)
o Suitable equipment available (adequate SWL,
be conducted certification and color code) (PSS)
 Assess environmental o Certified Equipment- crane & lifting appliances and
Delay in ops (SQ)
conditions ( weather, accessories (PSS)
wet ground etc.)  Everyone aware of the task – TBT and JSA, LMRA- as  Emergency Response
 Ensure the right tools and applicable. (PSS) Plan
equipment are at hand  Ensure personnel is fit for work (physically, psychically) (PSS)  Project incident reporting
Tripping/slipping/falling
1.  Confirm initial and final from heights (N)  Ensure that personnel not involved in operations is kept clear of
and investigation
location of load and lift procedure
working area – no persons should be positioned under a
routes with relevant  Contingency plan
suspended load or between suspended loads and fixed objects
personnel (PSS)
 Ensure final location of  Define roles of personnel and establish positioning during
load is free from operations (VC&PSS):
obstructions  PSS to ensure communication with relevant personnel (PSS)
 Ensure JSA for lifting ops
 PSS to obtain confirmation from vessel and crane operator that the
is revised/ reviewed prior to
task can be safely conducted (PSS)
ops
 Operator to visually check equipment before task– in good condition;
clear of slippery substances- oil, mud etc.;
 Ensure safety devices are maintained as operational and that
operators know the location of these devices and how to use them (VC)
 Protective equipment to be worn as per the above (operator)
 Conduct trial lifts if in any doubt (PSS)
 Consideration given to environmental conditions prior to starting work
No work to be undertaken if weather conditions (wind, rain etc.) affect
the safety of the lifting operations (PSS & crane operator).

Page 1 from 4
Etapele activitatii /Job Pericole Impact posibil Contingenta
No. / Hazards / Possible impact Masuri de control / Control measures / Contingency
steps

Unstable or uneven  Ground surfaces must be inspected to ensure sufficient compaction


Crushing injuries (IN)
ground surface, potential to operate on, if in doubt seek advice from the Site Manager (crane
rollover of Crane (A)  Emergency Response
operator & PSS)
Plan
Damage to equipment (PL)  Plan the travel path and ensure route is clear of obstructions
Start-up and plan the use of  Project incident reporting
and maintain a safe distance from all site workers (PSS).
2. the Crane
Equipment loss (PL)  Check for and ensure no overhead power lines are within the
and investigation
Overhead power lines, procedure
potential electrocution crane radius (within 3 m) (PSS & crane operator).
 Contingency plan
(A)  Additional control measures are required if the work is within the above
Delay in ops (SQ) distances and the task is NOT to continue until adequate controls are in
place. (PSS)

 Before operating the Crane check for and ensure all ground
Crushing injuries (IN) workers and other vehicles are well clear of the work area (PSS &
crane operator)
 Emergency Response
 Ensure reverse beepers are audible and flashing lights are working
Plan
Collision with other site Damage to equipment (PL) at all times while moving (crane operator)
Operate and mobilise the  Project incident reporting
vehicles and workers (A,  Operating speed when driving the Crane must be done at creeping or
3. Crane
N) Equipment loss (PL) extremely slow speed (walking speed) (crane operator)
and investigation
procedure
 Ground surfaces must be inspected to ensure sufficient compaction
 Contingency plan
to operate on, if in doubt seek advice from the Site Manager (crane
Delay in ops (SQ) operator & PSS)
 No work to be undertaken if weather conditions (wind, rain etc.)
affect the safety of the lifting operations (PSS & crane operator).
4. Lifting Potential rollover of  Ensure that personnel not involved in operations is kept clear  Emergency Response
Crane- Unstable or Crushing injuries (IN) of working area (VC) Plan
uneven ground  Maintain good communications (operator)  Project incident reporting
surface; overload (N)  Team work; lifting/lowering only under supervision; the assistant to and investigation
Damage to equipment (PL) ensure lifting/ lowering equipment is safe- give clearance for procedure
Swinging loads (N) lowering equipment  Contingency plan
Equipment loss (PL)  Load attachments to crane to be completed by qualified riggers (PSS).
Struck by object (N)
 Choose a sling of adequate capacity and determine the best means
Breaking wires and Delay in ops (SQ) of attachment (PSS & rigger/ slinger)
fittings- wires under  Position the lifting assembly over the centre of gravity and aim for a
tension (N) direct lift (rigger/ slinger)
 Ensure all workers, including the riggers are well clear before lifting
Falling objects (N) the load (PSS)
 Smoothly and gradually raise the load to max. 1 m off the ground and
hold. Check the slinging and balance of the load (crane operator &
banksman).
 When the load is stable, continue the lift until it is high enough to
clear all objects in its path (crane operator & banksman)
 Tag Lines are to be used if the load is raised above shoulder height
(operator)
 Maintain visual sight of crane driver at all times; If crane driver is out
of sight, lifting is to stop immediately (banksman)
 Ensure safety devices are maintained as operational and that operators
know the location of these devices and how to use them.
 Protective equipment to be worn as per the above- incl. safety
harness (operator)
Page 2 from 4
Etapele activitatii /Job Pericole Impact posibil Contingenta
No. / Hazards / Possible impact Masuri de control / Control measures / Contingency
steps
 No work to be undertaken if weather conditions (wind, rain etc.) affect
the safety of the lifting operations (PSS & crane operator).

Page 3 from 4
Echipa JSA / JSA Team

Functie/Companie Nume/Semnatura Functie/Companie Nume/Semnatura


No. Position / Company Name/Signature No. Position / Company Name/Signature
1. 7.
2. 8.
3. 9.
4. 10.
5. 11.
6. 12.

Page 4 from 4