1. Slinging to be done
properly by trained
1. Slinging to be done properly by trained rigger/foreman. 2.
Serious injury/ rigger/foreman. 2. Person must person must not stand near Continuo
slip and fall of not stand near the lifting load/being lifted.
fatality and The lifting load/being lifted. Considera us
materials and 2 3 6 Planned 2 4
material 3. foreman has to check and ensured the sling 3. Foreman has to check 2 tion Monitorin
pipes.
damage Arrangement. 4. Adequate and ensured the sling g required
support to be fixed with truck at both ends. arrangement. 4. Adequate
support to be fixed with
truck at both ends.
1. Proper earthling is
provided.
2. Good condition of
welding machines are used.
3. Quality electrodes
are used.
4. Good condition of
Serious injury and cables are used. Continuous
Non
18 Welding Activity Fire, short circuit fatality, Toxic E 5. Welding is done at 2 2 4 Consideration _ _ _ _ _ Monitoring
Routine open areas and dry atmosphere.
inhalation, Burns required
6. Following
manufacturer instructions
7. Only qualified and
competent persons are deployed
for hot work.
8. TBT are given before
start of the job
1. Machine and wheel
guards are using.
2. Good condition of
electrical cables are using.
3. Following the
Electrical short manufactures instructions
Serious injury and Continuous
Use of portable grinding Non circuit, breakage
19 fatality, Toxic E 4. Only trained and 2 2 4 Consideration _ _ _ _ _ Monitoring
machines Routine of wheel, sparks
inhalation, Burns competent persons are allowed to required
falling on eyes perform the work
5. Daily inspection
before use of machine
6. TBT are conducted
before the start of the work
Health related 1. Paints are using as per the MSDS
problems like eyes 2. Proper PPES are using for
Expose to Continuous
Non burn, skin irritation painting activity. As per nature
20 Painting solvent vapors’ E 2 2 4 Consideration _ _ _ _ _ Monitoring
Routine etc.. work.
and paints required
3. TBT are conducted before the
start of the work.
Hazard Identification Risk Analysis Risk Control Monitoring
Existing Risk Factor Residual
(Code Matrix: 5X5) Result Risk (Code Result
(Consideration Matrix: 5X5) ( Considerati Descriptio
Routine/
Likel , Additional controls Likel New on n, n of
Sl.No Activity / Process Non Hazard Risk L/E Existing Controls Risk Remarks
y Severit Planned, Recommended y Severity Risk Planned, monitoring
Routine Level
Hood y Urgent, Hood y (1-5) Facto Urgent, required
(AXB (1- r=
(1-5) (1-5) B Immediate) B Immediate)
)
A 5) A (AXB)
21 pipes alignment with Non 1.Chain pulley Major and Minor E 1. Skilled persons are deployed. 2 2 4 Consideration _ _ _ _ _ Continuous
help of chain pulley Routine failure 2.Falling accidents, fatality 2. inspection of chain pulley Monitoring
material from before start of work required
height 3 .Area was barricaded and
3. Slippage of isolated
wire 4. Job specific talks are
rope conducting before start of the
work.
5.Work will done under the
supervision of Engineer and
Safety Officer
6 .TPI approved wire ropes are
using.
1. Only skilled persons are
allowed.
2 .Boom lift inspection before
use,
1 .Boom Lift
3. Skilled operator to run
Failure
Bolt tightening with the boom lift 4 .TBT &
2. Heavy Noise JST before start of the Continuous
impact Major accidents,
22 Routine 3.Electrical E work 2 2 4 Consideration _ _ _ _ _ Monitoring
wrenched/pneumatic or Fatality
shocks required
manual 5 .Barricading the work area.
4.Pressure hose
6. Suitable PPES are used.
pipe failure
7. Ear plugs are provided to
workers
8.inspection of electrical and
pneumatic equipment
1.Only skilled persons are
allowed for erection an
1 .Fall of dismantling
material 2 .Competent person will be
2 .Fall of persons available at site.
3. Defective 3. Before start of work, TBT and
material job specific trainings are given to Continuous
Scaffolding Erection and Non Major accidents,
23 4.Wrong E workers. 2 2 4 Consideration _ _ _ _ _ Monitoring
dismantling routine Fatality
methodology of 4. Work required PPE are using required
erection and for personal protection.
dismantling 5 .Full body harness are using by
5 .Unskilled workers.
persons 6. Following the manufacturer
instructions (erection sequence)
during erection and dismantling.
Non 1.Pich Points Minor injury/ cut 1. Proper training was provided Continuous
routine 2. Slip[s and injury for workers. Monitoring
24 Setup for Scaffold Work E 1 2 2 Consideration _ _ _ _ _
Trips 2. Proper PPE are using by
workers.
1. Utilization of 100% PFAS.
2.Ensuring all couplings and
boards are secured from
1.Major Injury Continuous
Non movement
25 Installation of Scaffold 1.Fall hazards 2.property E 2 2 4 Consideration _ _ _ _ _ Monitoring
routine 3.All scaffolding material must
Damage required
be secure prior to work
4. All work areas must have the
safe access and egress.
1.Towers to be accessed using
internal ladders / steps
2.Do not overload the tower
3.Erect towers only on firm
Continuous
Scaffolding - Stairway 1. Falling from Major accidents, ground
26 Routine E 2 2 4 Consideration _ _ _ _ _ Monitoring
use height Fatality 4.Guard rails and toe boards to
required
be fitted
5.Never extend the height of the
platform by using a ladder,
stepladder
1. Persons working
1.Major Injury Continuous
below towers to wear head
Routine 1. Falling Objects 2.property E 2 2 4 Consideration _ _ _ _ _ Monitoring
protection
Damage required
2. Toe boards on
working platform
3.Working area around tower
to be cordoned off
1.Major Injury Continuous
1.Defective 1.Equipment checked prior to
Routine 2.property E 1 2 2 Consideration _ _ _ _ _ Monitoring
equipment use / inspected weekly
Damage required
1-5 For Consideration, 6-9 Planned 10-14 Urgent as soon as possible, 15+ Immediate
LIKELY(4) 50 % -
90% CHANCE 4 8 12 16 20
MODERATE(3) 10 %
- 50% CHANCE 3 6 9 12 15
UNLIKELY(2) 3 % -
10% CHANCE 2 4 6 8 10
RARE(1) < 3%
CHANCE 1 2 3 4 5